Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-Finance | ₹4.7 L | L1 | Accepted-Finance ok |
| 2 | L2₹4.8 L+₹13,849 (2.94%)Rejected-Finance VILL DHAR P O DHAR TEHSIL JUBBAL DISTT SHIMLA H P | SHIMLA | HIMACHAL PRADESH | 170009 | ₹4.8 L+₹13,849 (2.94%) | L2 | Rejected-Finance ok |
Tender Value
₹4.6 L
EMD Value
₹9,250
Closing Date
7 Sept 2026, 6:00 pmClosed
Executive Engineer
HPPWD Jubbal
SH Construction of unlined drain, cutting of and providing anti laying Kharanja Stone Soling at Various Slushy Beaches between kn 0/00 to 8/570
2026_PWD_142395_1
6745-48, Dated 27.08.2026
Open Tender
Civil Works
Percentage
Jubbal
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹9,250
18 Sept 2026
1 Sept 2026
8 Sept 2026
1 Sept 2026
7 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Road way in soil using mannual means for carring of cut earth to embankments site with a lift 1.5 mtr and lead up to 50 mtras per technical specification clause 302.3 including all leads and lifts | 35.18 | Per cubic metre | 170 | ₹5,980.6 |
| 2 | Construction of unlined surface drains of average cross-sectional area 0.40 sqm in soil to specified lines graders levels and dimensions.excavated material to be used in embakment with a lift upto 3 m and lead of 50 m ( average lead 25 m) including all leads and lifts as per technical specification directed by the Engineer-In-Charge | 2,500 | Per Running metre | 60 | ₹1,50,000 |
| 3 | Maintenance of Earthen shoulder (filling with fresh selected soil) -: Making uploss of material /irregularties on shoulders to the design level by adding fresh approved selected soil and compacting it with appropriate equipement at OMC upto a lead of 1000 mas per technical specification Clause 1903. | 2,500 | Per Square metre | 45 | ₹1,12,500 |
| 4 | Cutting of branches of tree shrubs and triming of grass and weeds:- cutting of shrubs from the road way or in R.O.W. and disposal of Shrubs to location as per technical specification Clause 1914. | 21,600 | Per Square metre | 2.95 | ₹63,720 |
| 5 | Stone soling properly hand-packed filling interstices with Kharanja stone and consolidating with power road roller to the requested gradient and comber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 230 mm spread thickness (finished work including materials and labour) | 53.94 | Per cubic metre | 2,400 | ₹1,29,456 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
01.pdf
Tender Documents • 2.28 MB
BOQ_211561.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .