| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.0 LAccepted-Finance | ₹40.0 L | L1 | Accepted-Finance OK |
| 2 | L2₹40.5 LAccepted-Finance | ₹40.5 L | L2 | Accepted-Finance OK |
| 3 | L3₹40.9 LAccepted-Finance | ₹40.9 L | L3 | Accepted-Finance OK |
Tender Value
₹40.0 L
EMD Value
₹39,980
Closing Date
16 Mar 2026, 5:00 pmClosed
Executive Engineer Zilla Parishad Raigad Alibag
Shivtirtha Building Zilla Parishad Raigad Alibag
CONSTRUCTION OF Approach Road At Birwadi Katkarwadi in V.P. Khambre
2026_RAIGA_1285657_1
ZP-RAIGAD-WORKDIV-188-2025-26
Open Tender
Civil Works
180 days
Raigad
RZP Registration Contractor AS PER TENDER(OPEN)
12 documents required · 12 mandatory
₹590
₹39,980
26 Mar 2026
11 Mar 2026
17 Mar 2026
11 Mar 2026
16 Mar 2026
11 Mar 2026
Item No.1 :- Excavation for catch / side water gutter in Hard murum and boulder strata to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed.
Item No.2 :-Excavation for catch / side water gutters in Hard rock strata to the specified section including stacking the excavated stuff in a regular bund by chiselling and wedging and disposing of unsuitable or excess stuff as directed.
Item No.3 :- Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard Proctor density for a lead of over 50m. to 300m. inclusive from the site of excavation to the site of deposition as directed.
Item No. 4 :- Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources)
Item No.5 :- Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader / Paver on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- By Mix in Place Method and Grading - I Material
Item No.6 :- Watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97 % of standard Proctor density after laying them in layers of 20 cm. to 30 cm. with vibratory roller.
Item No.7 :- Providing and laying cement concrete pipe of IS 458:2003 NP-3 class of 600 mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete.SSR 2022 - 2023 Item No.11.14
Item No.8 :- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Intelligent Compactor with compaction analyzer and V-Sat attachment. to the required density. Grading I (Using Screening Type A (13.2) mm Aggregate)
Item No.9:- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Intelligent Compactor with compaction analyzer and V-Sat attachment. to the required density. Grading II (Using Screening Type B (11.2 mm) Aggregate)
Item No 10:- Providing cast in situ / ready mix M20 grade cement concrete for head walls of CD work / retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with SCADA
Item No.11 :- Providing and constructing 75 mm. thick Modified Penetration Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone metal layers 100% crusher broken metal with conical crusher plant heating and spraying the bitumen of specified grade @ 2 Kg/sqm, spreading 12 mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc. complete. Including picking of existing WBM surface. (VG-30 bulk bitumen rates are considered to arrive at rates)
Item No.12 :- Providing and applying tack coat on the prepared surface heating by fames in Boiler and spraying bitumen set footed in bitumen boller on B.T. surface 2.5 kg/10 sqm.VG-30 bulk bitumen
Item No.13 :- Open Graded Premix Surfacing- Providing and Laying OGC 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates premixed with bituminous binder transported to site with VTS , laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction but excluding prime / tack and Seal coat. For Bitumen of specified grade--USING drum mix type hot mix plant with SCADA, Paver and Vibratory roller ( Over MPM Surface)
Item No.14 :- Providing bituminous Type A liquid seal coat on bituminous surface including supplying all materials and bitumen of specified grade preparing existing road surface, heating and applying bitumen @ 0.98 KgSqm. by mechanical means, spreading chips and rolling, by static roller having weight 8 to 10 MT. etc. complete. (VG-30 bulk bitumen rates are considered to arrive at rates)
Item No.15 :- Providing and laying Cast in situ/Ready Mix cement concrete in M10 of trap/ granite/quartzite/gneiss metal for bed blocks, foundation blocks and such other items including bailing out water, Steel centering, formwork, laying/ pumping, compacting, roughening them if special finish is to be provided, finishing uneven and honeycombed surface and curing etc. complete. The Cement Mortar 1:3 plaster is considered for rendering uneven and honeycombed surface only. Newly laid concrete shall be covered by gunny bag, plastic, tarpaulin etc. (Wooden centering will not be allowed.), with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/ concrete Batch mix plant (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)
Item No 16 :- Providing and laying Cast in situ/Ready Mix cement concrete in M-20 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concrete Batch mix plant (Pan mixer) etc. complete. With natural sand/V.S.I. quality Artificial Sand Rate As Per Rate Analyasis
Item No.17 :- Compacting the hard murum side widths including laying in layers on each side with power roller including artificial watering etc. complete.
Item No.18 :- Providing and fixing 90 cm x 60 cm Marble plate engraving 10 cm. height letter, figures including painting the lefters/figures with approved colour and shade complete
Item No.19 :- Testing Charges of construction material Aggregate - Sieve Analysis
Item No.20 :- Testing Charges of construction material Aggregate - Flakiness and Elongation Index
Item No.21 :- Testing Charges of construction material Bitumen -Penetration, Softening Point, Flash & Fire Point, SEecific Gravity
Item No.22 :- Testing Charges of construction material Carpet - Extraction Test,(For OGC)
Item No.23 :-Disbursement of Royalty charages for construction materials like Sand etc.complete
Item No.24 :-Disbursement of Royalty charages for construction materials like metal, rubble,murum, and earth etc. complete. For All other Minerals = Royalty + Surcharge (2%) = 211.95 + 4.23 = 216.18 Per Cum
Item No. 25 :- Reimbrsement of 18% G.S.T. ( Excluding Royalty ) =
Item No. 26 :- Reimbrsement of 0.50 % Work Insurance
Item No. 27 :- Add 1% for SQM Checking Charges
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.13 MB
BOQ_2210924.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid