Loading…
Loading…
Tender Value
₹10.0 L
EMD Value
₹10,000
Closing Date
3 Aug 2026, 3:00 pmClosed
Block Development office BP
Poonamallee union
Providing Arc Shape Pathway Sitting bench and lighting Arrangments work for Roundabout in Nemilicheri Panchayat
2026_RDTN_687155_1
4097/2025/A2
Open Tender
Civil Works
Works
Poonamallee
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹10,000
Yes
Block Development office BP
20 Jul 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
3 Aug 2026
21 Jul 2026
21 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Providing Arc Shape Pathway, Sitting bench and lighting Arrangments work for Roundabout in Nemilicheri Panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard stiff clay and hard gravelly soil as per SS20B for narrow foundations. Etc,.complete. | 7.5 | cum | 131.89 | ₹989.18 |
| 3 | Cement Concrete 1:4:8 ( One Cement Five sand and Ten Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete. | 7.5 | cum | 5,797.86 | ₹43,483.95 |
| 4 | Precast concrete block masonry (including Quoin Blocks, Jamb blocks, closers, etc) with Solid cement concrete blocks of approved size size made of cement concrete 1:3:6 mix ( 1 cement, 3 coarse M.Sand, 6 graded stone aggregate 20mm and down gauge) in foundation and plinth in cement lime mortar 1:2:9 (1 cement, 2 lime putty 9 coarse M.Sand)/ 1:1:6 (1 cement, 1 lime putty, 6 coarse M.Sand )/ Cement 1:6 (1 cement: 6 coarse M.Sand) Details of cost for 1.89cum of precast concrete blocks masonry.) 100 sqft x 2/3 = 66 2/3 cft= 1.89cum) (No. 7.75) | 8.63 | cum | 6,721.25 | ₹58,004.39 |
| 5 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 103.75 | sqm | 287.37 | ₹29,814.64 |
| 6 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 20.06 | cum | 2,890.52 | ₹57,983.83 |
| 7 | Flooring with paver blocks laid as interlocking blocks including cost and conveyance and other labour charges | 133.75 | sqm | 674.03 | ₹90,151.51 |
| 8 | Provision for Sitting Bench arrangments including charges | 11 | nos | 13,000 | ₹1,43,000 |
| 9 | Provision For Lighting Arrangments including charges | 16 | nos | 26,000 | ₹4,16,000 |
| 10 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.82 MB
Tender.pdf
Tender Documents • 0.59 MB
BOQ_825960.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .