Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance OLD NO 36 NEW NO 16 7TH EAST MAIN ROAD GANDHI NAGAR VELLORE 632 006 | VELLORE | VELLORE | TAMIL NADU | 632006 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance KULLANDI STREET PALLIPATTI PO METTUR TK SALEM 636458 | SALEM | SALEM | TAMIL NADU | 636458 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
17 Jan 2022, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/TP-I/CHN
O/o.The Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32.
Erection of 110 kV SC line on DC towers with panther conductor from Existing Karnambut 110/33-11 kV SS for expanding 110 kV Level EHT Supply to M/s.VIT,Vellore on DCW Basis proposed VIT 110 kV SS
2021_EB_217067_1
TP-020/2021-22
Open Tender
Civil Works
Works
120 days
VELLORE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.0 L
Yes
18 Jan 2022
17 Dec 2021
18 Jan 2022
17 Dec 2021
17 Jan 2022
17 Dec 2021
180 days
Amount
Clearing Juliflora jungle with up rooting including all cost of labour lead lift etc complete.
Conducting Check survey and pit marking including hire charges for T&P, all labour charges, lead, lift etc., complete.
Earth work excavation for depositing on bank for tower foundation with initial lead, of 10 meters and all lift in all classes of soil etc., complete in Hard gravelly soil
Earth work excavation for depositing on bank for tower foundation with initial lead, of 10 meters and all lift in all classes of soil etc., complete in SDR not requiring blasting
Earth work excavation for depositing on bank for tower foundation with initial lead, of 10 meters and all lift in all classes of soil etc., complete in MR and DMR not requiring blasting
Earth work excavation for depositing on bank for tower foundation with initial lead, of 10 meters and all lift in all classes of soil etc., complete in Hard rock (requiring blasting)
Earth work excavation for depositing on bank for tower foundation with initial lead, of 10 meters and all lift in all classes of soil etc., complete inHard rock ( wedging and chiselling )
PCC 1:3:6, using 20mm HBG metal for foundation without formwork but including cost of cement, all materials labour, lead, lift, consolidation using vibrators etc., complete.
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete,for GCR (Wet)
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete,for HCR (Wet )
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete,for KCR (Wet)
Fixing of templates, stub and cleat with supply of templates to site and assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete,for CZ(N) wet
PCC 1:2:4, using12 to 20mm HBG metal for foundation (frustum & Chimeny) with formwork but including cost of cement, all materials labour, lead, lift, consalidation using vibrators etc., complete.
RCC 1:1.5:3 using 12 to 20mm HB Stone for foundation with form work including cost of cement all materials labour etc., complete.for well ring foundation
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.As directed by the Engineer at site.
Back filling of tower pits for GCR (WET) after laying stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete
Back filling of tower pits for HCR (WET) after laying stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete.
Back filling of tower pits for KCR (WET) after laying stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete.
Back filling of tower pits for CZ(N) wet after laying stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete.
Back filling of tower pits for DP (wet) after laying stub-setting, concreting with excavated earth, watering and consolidation including all labour etc., complete.
Removal of excess excavated earth from the tower location including cost of all materials, lead, lift, labour and Transporting charges etc., complete.
Providing pipe type earthing to towers as per standard specification including all lead, lift etc., complete.
Providing muffing copping with PCC 1:2:4 using 12-20mm HBG metal with form work including cost of cement all materials, labour, lead, lift, etc., complete.
Plastering with CM 1:3, 12 mm thick including cost of cement, all materials, labour etc., complete.
Providing temporary guy's in tension location including burrying etc complete.As directed by the Engineer at site for 3nos. Stay.
Labour charges for Erection of tower including sorting out of tower parts at Site,unloading at site, erection of towers, tightening and punching of bolts &nuts if neccessary for final checking, including all lead, lift, labour etc. Complete including charges & rectification of tower parts if any including Tools & Plants all labour lead, lift, adhering to all safety norms, etc complete.
Labour charges for Hoisting of single units of Disc 7nos of 110 KV 90 KN insulator with single suspension fittings including cost of all labour, lead, lift, adhering to all safety norms etc., complete.
labour charges for Hoisting of single units of Disc 8nos of 110KV 120 KN insulator with single tension fittings including cost of all labour, lead, lift, adhering to all safety norms etc., complete.
Providing well supported trussels using 7.5cm to 10 cm and above dia bamboo post with necessary bracing on either side road crossing upto 5m height for supporting the power conductor and earth wire during paying out of conductor and tensioning operation including cost of all materials, lead, lift, removed after completion of work etc., complete
Supplying and fixing of name board of size 0.75 x 0.45m using 18 gauge MS Sheet with 25x25x3mm MS angle frame painting with approved enamel paint of two coats over primary coat and lettering as directed by Engineer at site, including cost of all materials, labour, lead, lift, etc., complete..
Painting the tower leg with Anti-corrosive black paint up to a height of 1M from ground level including cost of paint, labour lead, lift,etc, complete.
Arranging and availing line clear in HT/LT lines during stringing and dismantling works including cost of labour for lowering and retensioning and jumber connections of HT/ LT, lines earthing lead, lift, T&P etc., complete.
Tack welding of bolts & Nuts in the newly erected towers up to bottom cross arm level including of three tack weld in equal distance for each bolts & Nuts, hire charges of welding machine, cost of welding rods, transporting charges and painting with cold galvanizing and tightening of bolts wherever necessary including cost of all materials, labour, lead, lift,, transporting hire charges etc. complete.
Labour charges for Transport, Paying out, Rough sagging, Tensioning of 3 Nos. of ACSR PANTHER a conductor ensuring the conductor do not touch ground during the entire activity for Clipping, providing trussels at required intervals for paying out the conductor, Providing Vibration dampers at tension location, giving jumper connection including cost of lead, lift, labour, major & minor T&P,s maintaing ground clearance as per profile and adharing to all safety norms etc.Complete.
Labour charges for Transport, Paying out, Rough sagging, Tensioning of 3 Nos. of ACSR PANTHER conductor ensuring the conductor do not touch ground during the entire activity for Clipping, providing trussels at required intervals for paying out the conductor, Providing Vibration dampers at tension location, giving jumper connection including cost of lead, lift, labour, major & minor T&P,s maintaing ground clearance as per profile and adharing to all safety norms etc.Complete.
Labour charges for Transport ,Paying out,Sagging and tensioning of 1 No. 7/3.55mm GI earth wire ensuring the earth wire do not touch the ground during the entire activity to the required clearance, clipping using necessary clamp, tools with cost of required tension all materials lead lift, adhering to all safety norms, etc complete.
Providing shoring and shuttering with CW scantlings and planks including cost of all materials, labour etc., complete.
Dewatering charges during excavation and concreting with 5HP diesel engine including all charges for fuel, engine oil, pump operator etc., complete.
Supplying and fixing of Number plate in the tower leg with all lead & lift ,etc., complete
Supplying and fixing of Danger board in the tower leg with all lead & lift ,etc., complete
Supplying and fixing of Phase plate in the tower leg with all lead & lift ,etc., complete
Cutting and felling of Big size various type of trees and handing over of felled trees to the land owner at felling place including cost of T&P 's, Lead & lift, etc., complete
Cutting and felling of Small size various type of trees and handing over of felled trees to the land owner at felling place including cost of T&P 's, Lead & lift, etc., complete
Supply and filling of Gravel for formation of approach road from mainroad to water logged area at tower location including lead and lift, consolidation etc., Completed.
Providing special type earthing arrangements for Terminal tower including necessary excavation for fixing 3m long 50mm dia GI "B" class pipe,60cm dia with 5cm shell thick of RCC collar and refilling with excavated earth mixed with soft charcoal and connect the earthstrip with the leg of the stub and providing GI barbed wire as per the instruction of site engineer including all cost of materials lead lift etc complete.
Fabrication, galvanisation and supply of standard tower parts as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745(Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to avarage for inspection of towers at purachase factory at his own cost)
Fabrication, galvanisation and supply of Bolts & Nuts to site including all taxes and duties, fright charges etc, complete. The governing standards for Bolts & Nuts should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to avarage for inspection of towers at purachase factory at his own cost)
Supply and fixing of Single tension fittings for panther
Supply and fixing of double tension fittings for panther
Supply and fixing of single suspension fittings for panther
Supply and fixing of single tension fittings for earth wire
Supply and fixing of single suspension fittings for earth wire
Supply and fixing of Vibration Damper for panther
Supply and fixing of MID span joint for panther
Supply and fixing of Repair sleeve for panther
Supply and fixing of Aluminium earth bond for earthwire
Supply and fixing of Preformed armour rod for panther
Supply and fixing of 16mm dia U bolt and nuts/Hanger/eye bolts for panther
Supply and fixing of D Shackle for panther
supply of PG clamp for panther conductor
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
C P PRABHAKARAN
C.GOVINDAN
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .