Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹26.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹26.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L1₹26.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L1₹26.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L1₹26.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
7 Jul 2026, 3:00 pmClosed
Chief Engineer
Lucknow Municipal Corporation
Drain, Sidewalk interlocking and CC road work on the road in front of the UT Computer in Sector-L (2/452 to 2/459) under Vidyavati Third Ward.
2026_DOLBU_1163692_1
57(8)/CE/2026-27/16
Open Tender
Civil Works
Percentage
Lucknow Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,669
Lucknow Municipal Corporation
₹3.1 L
8 Jul 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
7 Jul 2026
24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling or R.C.C. ramp etc all comp. | 10.08 | Cum | 2,805 | ₹28,274.4 |
| 2 | Dismentling of old brick work etc all comp. | 4.23 | Cum | 1,627.4 | ₹6,883.9 |
| 3 | E/W in excacatio in ord. soil etc all comp. | 69.46 | Cum | 140.21 | ₹9,738.99 |
| 4 | P/L C.C. in 1:5:10 cement, f.sand & incl brick ballast etc all comp. | 13.89 | Cum | 4,889.51 | ₹67,915.29 |
| 5 | M-150 class brick work in 1:4 cement, course sand including all amterial etc all comp. | 37.4 | Cum | 6,715 | ₹2,51,141 |
| 6 | 12mm thick plaster in 1:4 cement, course sand including all material etc all comp. | 187.54 | Sqm | 271.46 | ₹50,909.61 |
| 7 | P/L c.c. work in 1:2:4 cement, courese sand etc all comp. | 6.6 | Cum | 6,223 | ₹41,071.8 |
| 8 | E/W in cutting or filling in ord soil. Including dressing, leveling and cartage etc. | 555.68 | Cum | 102.57 | ₹56,996.1 |
| 9 | Cartage of earth work up to 4km distance from site etcall comp. | 188.93 | Cum | 237.49 | ₹44,868.99 |
| 10 | P/L of G.S.B. Mixed stone grit etc all comp. | 136.14 | Cum | 3,866.86 | ₹5,26,434.32 |
stage.html
html • 0.08 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
RFPsingleBid.pdf
Tender Documents • 1.38 MB
BOQ_2181667.xls
BOQ • 0.27 MB
Dateextension.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .