Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-AOC | ₹2.0 L | 1 | Accepted-AOC Accepted |
| 2 | 2₹2.4 LRejected-AOC | ₹2.4 L | 2 | Rejected-AOC O.K. |
| 3 | 3₹2.5 LRejected-AOC | ₹2.5 L | 3 | Rejected-AOC O.K. |
| 4 | 4₹2.6 LRejected-AOC | ₹2.6 L | 4 | Rejected-AOC O.K. |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
7 Jun 2022, 5:00 pmClosed
SE ETC Bareilly
Superintending Engineer Transmission Campus Near L.I.C. Office Rampur Garden, Bareilly
Replacement of damaged Stub at 132KV Usawan-Tilhar S.C. Transmission Line alongwith other associated works under Electy. Transmission Division, Budaun
2022_UPTCL_705086_1
Short Term E-Tender No. 03/W/ETC(B)/2022-23
Open Tender
Civil Works - Highways
60 days
Bareilly
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE ETC BAREILLY
₹2,000
17 Sept 2022
1 Jun 2022
8 Jun 2022
1 Jun 2022
7 Jun 2022
1 Jun 2022
Amount
Replacement of damaged Stub at 132KV Usawan-Tilhar S.C. Transmission Line alongwith other associated works under Electy. Transmission Division, Budaun with all cost of men, misc. consumables, normal & special T&P etc required to be arranged by agency for satisfactory completion of the work, with all due care of safety & precautions as per technical specifications and direction of the supervising engineer, as per details below :
Excavation of Foudation Pits at Tower Location No. 29A+0, 42A+0, and 44A, (09 Stub) of 132 KV Usawan – Tilhar Line.
Transportation of materials from storage place of 132 KV Usawansubstation to site including loading and unloading.
Breaking of chimney of all above locations 1.5 Meter below the ground level (01 Job per chimney).
Replacement of stubs with suitable size of GI angle to be provided by the department by making the Butt and lap Joint of 08 No Stubs by KPTL design Tower providing suitable cleats and jointing on both side of stub and making hole by electric drilling/punching method including due cutting, Drilling, welding etc.
Recasting & strengthening of chimney by installation of steel reinforced Bars with due Cutting, Bending, Placing and binding including R.C.C. Concreting of Foundations and strengthening of Tower by casting and Muff raising of chimney by using M20 grade cement – concrete – coarse send mixture in the ratio of 01:02:04 with 20MM stone metals including cost of materials, de- watering shoring shuttering framing, cutting etc.
Filling & leveling of earth soil so excavated by due ramming & watering etc.
M/.S DINESH KUMAR
Shaurya Shakti Enterprises
M/s Abhinav Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid