| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.6 L+₹6.44 (<0.01%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.6 L+₹1,148.34 (0.74%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.6 L+₹1,149.01 (0.74%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹1.6 L+₹1,234.32 (0.79%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | M. KARUPPANAN L3 | VELLAISAMY MUTHUKUMAR L1 | Rajesh Kumar L8 | KARTHIKEYAN C L7 | Thanikodi L9 | MANGALANATHAN KANNAN L6 | sathyapriya L5 | Arivalagan G L4 | RAJA K L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00REPAIRS TO THE LIBRARY BUILDING @ VALAYANENTHAL VILLAGE IN SOUTH KEERANOOR PANCHAYAT | ||||||||||||
| 2.00 | Towards clean removal of damaged plastering surfaces including all cost and conveyance of men and materials | 17.05 | m2 | 3 ₹51.15 Lowest | 6.5 ₹110.83 | 7 ₹119.35 | 25 ₹426.25 | 7 ₹119.35 | 6.41 ₹109.29 | 6 ₹102.3 | 5.9 ₹100.6 | 6 ₹102.3 |
| 3.00 | Removal of One Course of Pressed Tile Roof finish in cement mortar | 77.62 | m2 | 20 ₹1,552.4 Lowest | 20 ₹1,552.4 Lowest | 39 ₹3,027.18 | 25 ₹1,940.5 | 22 ₹1,707.64 | 20.5 ₹1,591.21 | 21 ₹1,630.02 | 23.2 ₹1,800.78 | 25 ₹1,940.5 |
| 4.00 | Finshed with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm | 77.62 | m2 | 920 ₹71,410.4 Lowest | 954.51 ₹74,089.07 | 1,100 ₹85,382 | 920 ₹71,410.4 Lowest | 1,200 ₹93,144 | 1,030 ₹79,948.6 | 1,026 ₹79,638.12 | 1,018 ₹79,017.16 | 1,019 ₹79,094.78 |
| 5.00 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 17.05 | m2 | 200 ₹3,410 | 223 ₹3,802.15 | 240 ₹4,092 | 270 ₹4,603.5 | 230 ₹3,921.5 | 224.35 ₹3,825.17 | 224 ₹3,819.2 | 174.6 ₹2,976.93 Lowest | 180 ₹3,069 |
| 6.00 | White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm | 110.08 | m2 | 33 ₹3,632.64 | 29 ₹3,192.32 Lowest | 95 ₹10,457.6 | 30 ₹3,302.4 | 32 ₹3,522.56 | 30 ₹3,302.4 | 30 ₹3,302.4 | 29.8 ₹3,280.38 | 30 ₹3,302.4 |
| 7.00 | Distempering the old walls and ceiling Two coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer | 106.92 | m2 | 140 ₹14,968.8 | 154 ₹16,465.68 | 120 ₹12,830.4 | 185 ₹19,780.2 | 125 ₹13,365 | 113 ₹12,081.96 | 112 ₹11,975.04 Lowest | 126.3 ₹13,504 | 140 ₹14,968.8 |
| 8.00 | Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358 | 142.9 | m2 | 232.65 ₹33,245.69 | 199 ₹28,437.1 | 200 ₹28,580 | 230 ₹32,867 | 220 ₹31,438 | 200 ₹28,580 | 199 ₹28,437.1 | 199 ₹28,437.1 | 180 ₹25,722 Lowest |
| 9.00 | Painting the old Iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) | 29.76 | m2 | 135 ₹4,017.6 | 119 ₹3,541.44 | 100 ₹2,976 Lowest | 140 ₹4,166.4 | 120 ₹3,571.2 | 112 ₹3,333.12 | 112 ₹3,333.12 | 102.6 ₹3,053.38 | 101.5 ₹3,020.64 |
| 10.00 | SD NO 80 Supply and fixing of fancy glass shade and 11W CFL for BH point Rate per each Rs. 251 | 2 | Nos | 149.82 ₹299.64 Lowest | 212 ₹424 | 250 ₹500 | 350 ₹700 | 230 ₹460 | 213 ₹426 | 212 ₹424 | 209.33 ₹418.66 | 200 ₹400 |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
8 Aug 2025, 3:00 pmClosed
BLOCK DEVELOPMENT OFFICER ( B P)
UNION PANCHAYAT OFFICE,ILAYANGUDI
REPAIRS TO THE LIBRARY BUILDING AT VALAYANENTHAL VILLAGE IN SOUTH KEERANOOR PANCHAYAT
2025_RDTN_588421_1
ILY-AGAMT 24-25-LIBRARY REPAIR SOUTH KEERANOOR
Open Tender
Civil Works
Item Rate
ILAYANGUDI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹2,000
15 Sept 2025
4 Aug 2025
8 Aug 2025
4 Aug 2025
8 Aug 2025
4 Aug 2025
Amount
REPAIRS TO THE LIBRARY BUILDING @ VALAYANENTHAL VILLAGE IN SOUTH KEERANOOR PANCHAYAT
Towards clean removal of damaged plastering surfaces including all cost and conveyance of men and materials
Removal of One Course of Pressed Tile Roof finish in cement mortar
Finshed with one course of pressed tiles of size 23x23x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm
Distempering the old walls and ceiling Two coat with best oil bound distemper of approved quality including preparation of surfaces (the colour and quality should be got approved by the Executive Engineer before use) the rate includes cost of brushes, high scaffolding charges, neat finishing, cost of brushes etc., complete complying with standard specification and as directed by the Departmental Officer
Re Painting the walls with Two coats with first class quality Plastic Emulsion paint of approved colour over a priming coat including thorough scraping, clean removal of dirt. The rate includes cost of brushes, sand paper, plaster of parries, putty wherever required and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use) S I No 358
Painting the old Iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
SD NO 80 Supply and fixing of fancy glass shade and 11W CFL for BH point Rate per each Rs. 251
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RAJA K (BID ID -1423989)
M. KARUPPANAN (BID ID -1423734)
Arivalagan G (BID ID -1423811)
sathyapriya (BID ID -1424139)
MANGALANATHAN KANNAN (BID ID -1423922)
KARTHIKEYAN C (BID ID -1423823)
Rajesh Kumar (BID ID -1423694)
Thanikodi (BID ID -1423903)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .