Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance | -13.56% | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹4.9 L (3.20%)Admitted-Finance | -10.79% | ₹1.6 Cr+₹4.9 L (3.20%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹6.2 L (4.04%)Admitted-Finance | -10.07% | ₹1.6 Cr+₹6.2 L (4.04%) | L3 | Admitted-Finance |
| 4 | L4₹1.6 Cr+₹7.7 L (5.03%)Admitted-Finance | -9.21% | ₹1.6 Cr+₹7.7 L (5.03%) | L4 | Admitted-Finance |
| 5 | L5₹1.8 Cr+₹23.9 L (15.7%)Admitted-Finance | +0.00% | ₹1.8 Cr+₹23.9 L (15.7%) | L5 | Admitted-Finance |
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
31 Jul 2026, 6:00 pmClosed
EE PWD DIV MANDALGARH
EE PWD DIV MANDALGARH
Construction of BT road from Badliyas to Bhawanipura Under DMFT Scheme
2026_CEPWD_576058_1
NIT-10/2026-27 PWD MANDALGARH
Open Tender
Civil Works
Percentage
150 days
Mandalgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Egras Challan Deposit
₹4.2 L
Yes
5 Aug 2026
22 Jul 2026
3 Aug 2026
22 Jul 2026
31 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (A) Road Work
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201.
By Mechanical Means
In area of non-thorny jungle | 1.15 | Hect. | 10,374 | ₹11,930.1 |
| 2 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3 | 10,157.27 | Cum | 44 | ₹4,46,919.88 |
| 3 | Carriage of Earth, Sand, Lime, Morrum manure or sludge with 1 km. lead | 6,094.36 | Cum | 50.6 | ₹3,08,374.62 |
| 4 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion
complete.[MoRTH specification : Clause 401]. By mechanical means.
For Grading-I Material | 1,887.3 | Cum | 773 | ₹14,58,882.9 |
| 5 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density,
complete as per MoRTH Specification Clause 401.
For Grading III Material | 1,293.75 | Cum | 407 | ₹5,26,556.25 |
| 6 | WBM Grading 1
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening & binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 1 as per MoRTH Specification Clause 404.
Using Crusher Broken Aggregate
By Mechanical Means | 1,316.25 | Cum | 928 | ₹12,21,480 |
| 7 | WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per MoRTH Specification Clause 404. using Crusher borken aggregate
By Mechanical Means | 658.13 | Cum | 1,002 | ₹6,59,446.26 |
| 8 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 8,775 | Sqm. | 28 | ₹2,45,700 |
| 9 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 8,775 | Sqm. | 10 | ₹87,750 |
| 10 | Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500-7 premixed with bituminous binder, transported to site with all leads laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per MoRTH Specification Clause 504.
Bitumen (VG-30) | 438.75 | Cum | 6,100 | ₹26,76,375 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 23.42 MB
Tendernotice_2.pdf
PDF • 0.96 MB
01-TD-BADILYAS.pdf
Tender Documents • 0.19 MB
BOQ_1024270.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .