Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹187.4 CrAdmitted-Finance SF NO 454 RAGHUPATHYNAICKENPALAYAM RAILWAY COLONY POONDURAI MAIN ROAD ERODE | ERODE | ERODE | TAMIL NADU | ₹187.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹203.6 CrAdmitted-Finance 623 ARCONS INFRASTRUCTURES AND CONSTRUCTION PVT LTD NAGPUR ROAD CHHINDWARA CHHINDWARA MADHYA PRADESH 480001 | CHHINDWARA | MADHYA PRADESH | 480001 | ₹203.6 Cr | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | ARCONS INFRASTRUCTURES AND CONSTRUCTIONS PVT. LTD. L2 | RPP INFRA PROJECTS LIMITED L1 |
|---|---|---|---|---|---|
| 1.00EPC KN-II (5C) | |||||
| 1.01 | Reconstruction & widening of Bridges & Culverts for Alibag Bypass Road (Pen Road Junction) to Alibag Roha Junction to Belkade to Garudpada Nagaon Hatale to Revdanda Bridge Road MSH-4 Km. 262/500 to 280/745 ii) Revdanda Bridge to Salav to Talekhar Road SH-92 Km. 0/00 to 13/00 total lenght 31.245 Km. & Construction of New Revdnada Major Creek Bridge on EPC mode | 1 | Lumpsum | 2,03,59,15,027 ₹203.6 Cr | 1,87,43,78,000 ₹187.4 Cr |
Tender Value
₹163.0 Cr
EMD Value
₹1.6 Cr
Closing Date
10 May 2024, 5:00 pmClosed
Managing Director, MSIDCL
B/13, 13th floor, Bakhtawar building, 229, Nariman Point, Mumbai 400 021
EPC KN-II (5C) - Reconstruction and widening of Bridges an Culverts for Alibag Bypass Road (Pen Road Junction) to Alibag Roha Junction to Belkade to Garudpada Nagaon Hatale to Revdanda Bridge Road MSH-4 Km. 262/500 to 280/745 ii) Revdanda Bridge to S
2024_MSIDC_1031547_7
E-TENDER NOTICE NO.04 OF 2023-2024
Open Tender
Civil Works
912 days
Konkan
As Per Tender Documents
6 documents required · 6 mandatory
₹5,900
₹1.6 Cr
Yes
MSIDCL Office
2 Jul 2024
11 Mar 2024
13 May 2024
11 Mar 2024
10 May 2024
13 Apr 2024
11 Mar 2024 - 12 Apr 2024
12 Apr 2024
Amount
EPC KN-II (5C)
Reconstruction & widening of Bridges & Culverts for Alibag Bypass Road (Pen Road Junction) to Alibag Roha Junction to Belkade to Garudpada Nagaon Hatale to Revdanda Bridge Road MSH-4 Km. 262/500 to 280/745 ii) Revdanda Bridge to Salav to Talekhar Road SH-92 Km. 0/00 to 13/00 total lenght 31.245 Km. & Construction of New Revdnada Major Creek Bridge on EPC mode
ARCONS INFRASTRUCTURES AND CONSTRUCTIONS PVT. LTD.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid