Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Fee/PreQual/Technical/Finance | -0.03% | ₹6.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.9 LAdmitted-Fee/PreQual/Technical/Finance | -0.02% | ₹6.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.9 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹6.9 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.9 L
EMD Value
₹7,000
Closing Date
19 Jun 2026, 2:00 pmClosed
AREA MANAGER UPSIC MORADABAD
AREA MANAGER UPSIC MORADABAD
Construction work of approximately 38 meter CC Interlocking tiles inside the Saheed Mahesh Chandra Diwakar Memorial at the main station in village Laharavan in Sambhal District Sambhal
2026_MSME_1160212_1
697/UPSIC/MOR/2026-27
Open Tender
Civil Works
Percentage
120 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
AREA MANAGER UPSIC MORADABAD
₹7,000
2 Jul 2026
12 Jun 2026
19 Jun 2026
12 Jun 2026
19 Jun 2026
12 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loan clay or sand )including lift upto1.50M and lead upto 30m including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenche etc.(S.N-251) | 0.36 | cum | 110 | ₹39.6 |
| 2 | p.c.c 1:5:10 in foundation where as cement 5 us sand & 10 is 40 mm brick ballast (S.N-274) | 0.24 | cum | 3,350 | ₹804 |
| 3 | p.c.c 1:5:10 in foundation where as cement 5 us sand & 10 is 40 mm stone ballast (S.N-281a) | 56.28 | cum | 5,500 | ₹3,09,540 |
| 4 | M-150 b/w in foundation in 1:4 cement,coars sand mortar I/c all work.(S.N-307a) | 0.55 | cum | 4,950 | ₹2,722.5 |
| 5 | 12mm thick cement plaster in 1:4 cement approved coarse sand mortar etc including all complete work (S.N-584) | 2.4 | sqm | 190 | ₹456 |
| 6 | Supply and filling of ordinary soil with watering rammering compaction complete.(analysis) | 152.04 | cum | 224.4 | ₹34,117.78 |
| 7 | S/L of 80mm thick I shaped mechanically compessed interlocking cement concrete power block with a blanket layer of 4 cm thick L/Sand I/C all comp.Road | 375.2 | sqm | 900 | ₹3,37,680 |
| 8 | p.c.c 1:2:4 with cement,c/sand & 20mm gauge s/grift i/c all complete as (S.N-no-279a) | 0.05 | cum | 6,700 | ₹335 |
| 9 | S/F of block granite stone (2*x2*6")size with B/W & plaster in 1:4 as per drawing attached i/c all complete. | 1 | job | 4,135 | ₹4,135 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_2174392.xls
BOQ • 0.26 MB
697.pdf
Additional Documents • 0.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].