Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAccepted-AOC | ₹14.1 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹14.7 L+₹58,602.53 (4.15%)Rejected-AOC | ₹14.7 L+₹58,602.53 (4.15%) | L2 | Rejected-AOC Highest Amount Quoted |
| 3 | Not Admitted-Finance | - | - | Not Admitted-Finance Others-Contractor Letter |
| 4 | Not Admitted-Finance | - | - | Not Admitted-Finance Others-Contractor Letter |
| Sl No | Description | Qty | Unit | GS TRADERS AND CIVIL CONSULTING L1 | SRD CONTRACTORS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth Work Excavation for foundation in all types of soils and sub soils to full depth (such as Soils in Rock / Silt / Light Black Cotton Soil / Ordinary Soil ) except in rock requiring blasting but inclusive of shoring, shuttering and bailing out water wherever necessary and refilling the sides of foundation with excavated earth other than sand in layers of 150 mm thick well rammed and consolidated, depositing the surplus earth in places shown by the Departmental Officers with initial lead of 10 m and initial lift of 2 m. Complete as per TNSS 23 & 24, V, VI (S2), VII, 9,10 | 112 | M3 | 224.2 ₹25,110.4 Lowest | 235.8 ₹26,409.6 |
| 2.00 | Plain Cement Concrete of mix 1 : 4 : 8 (One part of Cement four part of sand eight part of aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 1 | M3 | 4,676.9 ₹4,676.9 Lowest | 4,919 ₹4,919 |
| 3.00 | Supply and Dellivary of DI Pipes and Specials including cost of material and cost of conveyance etc. (TWAD SOR V-II Pg No.40-46) 200mm DI Pipe (4.00 m) | 3 | No | 12,978.8 ₹38,936.4 Lowest | 13,650.6 ₹40,951.8 |
| 4.00 | 200mm DI Pipe (3.00 m) | 8 | No | 7,846.4 ₹62,771.2 Lowest | 8,252.6 ₹66,020.8 |
| 5.00 | 200mm DI Pipe (2.00 m) | 3 | No | 9,650.73 ₹28,952.19 Lowest | 10,150 ₹30,450 |
| 6.00 | 200mm DI Pipe (1.50 m) | 2 | No | 6,944.75 ₹13,889.5 Lowest | 7,304 ₹14,608 |
| 7.00 | 200mm DI Pipe (1.00 m) | 3 | No | 4,199.9 ₹12,599.7 Lowest | 6,355.8 ₹19,067.4 |
| 8.00 | 100mm DI Pipe (1.00 m) | 2 | No | 2,277.32 ₹4,554.64 Lowest | 3,446.3 ₹6,892.6 |
| 9.00 | DI Specials | 1,000 | Kg | 87.37 ₹87,370 Lowest | 134 ₹1,34,000 |
| 10.00 | Supply and Dellivary of MS Pipes and Specials including cost of material and cost of conveyance etc. (TWAD SOR V-II Pg No.61) 323.9X7.1 MS Pipe (Dia metre & thickness of pipe in mm) | 1 | Mtr | 3,777.74 ₹3,777.74 Lowest | 3,973 ₹3,973 |
Tender Value
₹19.9 L
EMD Value
₹39,800
Closing Date
20 Aug 2026, 3:00 pmClosed
Executive Officer
Sivagiri Town Panchayat
General Fund 2026-2027 Erode DT Sivagiritp Supply and Fixing of Damaged Water Supply and Electrical Equipments at Valliyampalayam and Veerasangili Water Pumping Staions and Providing Additional Pipeline at 3.00 Lakh Litre OHT Tank in Sivagiri Town
2026_DTP_692263_1
176/2026
Open Tender
Civil Works - Water Works
Works
90 days
Sivagiri Town Panchayat
Asper Norms
2 documents required · 2 mandatory
₹0
₹39,800
7 Sept 2026
7 Aug 2026
20 Aug 2026
7 Aug 2026
20 Aug 2026
7 Aug 2026
7 Aug 2026 - 20 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work Excavation for foundation in all types of soils and sub soils to full depth (such as Soils in Rock / Silt / Light Black Cotton Soil / Ordinary Soil ) except in rock requiring blasting but inclusive of shoring, shuttering and bailing out water wherever necessary and refilling the sides of foundation with excavated earth other than sand in layers of 150 mm thick well rammed and consolidated, depositing the surplus earth in places shown by the Departmental Officers with initial lead of 10 m and initial lift of 2 m. Complete as per TNSS 23 & 24, V, VI (S2), VII, 9,10 | 112 | M3 | - | - |
| 2 | Plain Cement Concrete of mix 1 : 4 : 8 (One part of Cement four part of sand eight part of aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 1 | M3 | - | - |
| 3 | Supply and Dellivary of DI Pipes and Specials including cost of material and cost of conveyance etc. (TWAD SOR V-II Pg No.40-46) 200mm DI Pipe (4.00 m) | 3 | No | - | - |
| 4 | 200mm DI Pipe (3.00 m) | 8 | No | - | - |
| 5 | 200mm DI Pipe (2.00 m) | 3 | No | - | - |
| 6 | 200mm DI Pipe (1.50 m) | 2 | No | - | - |
| 7 | 200mm DI Pipe (1.00 m) | 3 | No | - | - |
| 8 | 100mm DI Pipe (1.00 m) | 2 | No | - | - |
| 9 | DI Specials | 1,000 | Kg | - | - |
| 10 | Supply and Dellivary of MS Pipes and Specials including cost of material and cost of conveyance etc. (TWAD SOR V-II Pg No.61) 323.9X7.1 MS Pipe (Dia metre & thickness of pipe in mm) | 1 | Mtr | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_832362.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .