| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.8 LAccepted-AOC | L1 | Accepted-AOC M/S RAJENDRA PRASAD AND SONS IS SELECTED AS L1 | |
| 2 | L2₹17.4 L+₹1.4 L (8.67%)Rejected-AOC | L2 | Rejected-AOC M/S RAJENDRA PRASAD AND SONS IS SELECTED AS L1 | |
| 3 | L3₹17.7 L+₹1.7 L (10.7%)Rejected-AOC | L3 | Rejected-AOC M/S RAJENDRA PRASAD AND SONS IS SELECTED AS L1 |
Tender Value
Refer Docs
EMD Value
₹36,000
Closing Date
27 Apr 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, ECTC, UPPTCL, Moradabad
Superintending Engineer, ECTC, UPPTCL, PO Majhola, Moradabad
Construction of 02 Nos. 132 KV Bay for 132 KV Badhai Kalan-Baghra D/C Line at 220 KV S/s Badhi Kalan Distt. Muzaffarnagar
2021_UPCTL_580133_1
02-ECTC/MBD/2021-22
Open Tender
Civil Works
Item Rate
30 days
Muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EE ECTD Muzaffarnagar
₹36,000
3 Sept 2021
6 Apr 2021
28 Apr 2021
6 Apr 2021
27 Apr 2021
6 Apr 2021
120 days
Amount
Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 Metre and lead upto 30 metre and including filling, watering, and ramming of excavated earth into the trenches or into the space between the building and the side of the foundation trenches or in to the plinth and removal & disposal of surplus earth as directes by the Engineer- in- charge up to a distance of 30m from the foundation trenches. (CSI No. 4.01)
Excavation in foundation in ordinary soil in small pit in auxiliary structure (700x700x1000)mm foundation as per drawing in out-door switch yard. (CSI NO. 4.03)
Add to Item No. 4.01 to 4.05 above for every additional 30 Meters lead or part of 30 Meters or for every additional 1.5 M lift of part of 1.5 Metres. (CSI NO. 4.06)
Concrete with 4cm gauge down graded Stone ballast , coarse sand (F.M. 1.8 to 2.5) and cement in proportion of 12:6:1 in foundation and under floors and supply of all materials, labour, tools and plants etc. required for proper completion of the work. (CSI No. 5.01)
Cement concrete with 2cm gauge Stone ballast, coarse sand and cement in the proportion 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of work. (CSI No. 5.03)
RCC work with cement, approved coarse sand and 2cm (3/4”) gauge approved stone ballast in the proportion of 1:1.5:3. For raft excluding supply of reinforcement and its bending but including its cutting, fixing and binding the same with 24 B.W.G. G.I. wire including necessary centering and smooth shuttering etc required for proper completion of work including supply of all material, binding wire, labour and T&P etc. (CSI NO. 5.14)
RCC work with cement, approved coarse sand and 2cm (3/4”) gauge approved stone ballast in the proportion of 1:1.5:3. in T-beam, columns and walls upto 1.50mt. Ht. (Only web of T or L beam shall be measured.) excluding supply of reinforcement and its bending but including its cutting, fixing and binding the same with 24 B.W.G. G.I. wire including necessary centering and smooth shuttering etc required for proper completion of work including supply of all material, binding wire, labour and T&P etc. (Column means length/height of column should be greater than or equal to 3 times the least lateral dimension of column.) (CSI No. 5.16)
Concreting of 40 mm thick R.C.C. trench cover of mild steel frame work with CC 1:1.5:3 in cement coarse sand, 12 mm down graded stone ballast with smooth finishing on both top and bottom surfaces matching with floor colour complete with all labour, materials, T&P etc. required for proper completion of the work but excluding cost of cover of steel frame. (CSI No. 5.17)
Placing of trench cover of all size in proper position including transporting from different places within the s/s area including all labour T&P etc. required for proper completion of the work as per direction of Engineer-in charge. (CSI No. 5.19)
Providing cement concrete with cement, approved coarse sand (F.M. 1.5 to 2.5) and 12 mm gauge down graded approved stone ballast in the proportion of 1:1.5:3 in the grouting of Edge and brackets of trenches including necessary centering and shuttering etc. including supply of all materials, labour and T&P etc. required for proper completion of work. (CSI No. 5.21)
1st class brick (not less than class 150) work in 1:4 cement and coarse sand of 2.25 F.M. mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work. (CSI No. 6.02)
Mild steel or iron work in heavy small section like (J/U) hooks, holding down bolts, hold fast, tie rod, record recks, door/window frame, trench recks & edges, angle post etc. (when not included in overall rates) wrought to required form including supply of steel bolts, nuts, wastage etc. and their fixing charges, welding, required for proper completion of the work. (CSI No. 9.01)
Mild steel or iron work in heavy large size sections such as trusses, built-up gates, roof work, window/boundry grill or railing, trench covers, grating, T/F rail etc. wrought to required form including supply of steel bolts, nuts, wastage etc. and their fixing charges, welding, required for proper completion of the work. (CSI No. 9.02)
T.M.T. or Tor Steel in plain work such as reinforced concrete or reinforced brick work (when not included in over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of steel its wastage, bend, hooks, and authorized overlapping as required for proper completion of the work. (CSI No. 9.04)
Supply of 25 mm dia. M.S Anchor bolts (conforming to IS-266) 500 mm long with base plate (50x50x6 mm) welded with anchor bolts, including its threadng up to a length of 10 cm and hot dip galvonized 15-20cm also supply of a pair of standard nuts with theading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (CSI No.9.11)
Fixing and grouting the 25mm dia Anchor bolt in proper alignment level and setout with the help of a template including supply of all labour T&P etc. reqd. for proper completion of the work. (CSI No. 9.12A)
Placing of template in position, level and alignment for grouting of Anchor bolt in Auxillary Structures (Labour only) (CSI NO. 9.19)
Fixing and grouting of trench edging and rack in proper level and alignment including cost of all labour and T&P etc required for proper completion of the work but excluding cost of C.C. (CSI No. 9.20)
12mm thick plaster with cement mortar of 1 part cement & 4 parts of approved coarse sand 2.5 F.M. over Brick work, min. thickness not less than 10mm including supply all material, labour and T&P required for proper completion of work. (CSI No. 11.05)
Supply of 28 mm dia Fully galvanized (conforming to IS2625: 1985) M.S. Anchor bolts (conforming to IS 5624:1993) 900 mm. Long with base plate (75x75x6mm) welded with anchor bolts inclduing its threading upto a length of 10cm and hot dip galvonized 15-20cm also supply of a pair of standard nuts with therading including supply of 5mm thick washer and cost of labour material and T&P etc. required for proper completion of the work. (CSI No. 9.09)
Fixing and grouting the Anchor bolts 28mm dia to 40mm dia in proper alignment level and setout with the help of a template complete including supply of all labour & T&P etc. requiired for proper completion of the work. (CSI No. 9.10)
Placing of template in position, level and alignment for grouting of Anchor bolt in main gantry (Labour only). (CSI NO. 9.18)
Champhering the edge of concrete 35mm wide triangular section at the junction of concrete foundations and trench edging etc.as per direction of E/I, inclduing cost of all material labour and T&P etc. required for proper completion of the work. (CSI No. 11.15)
Rendering, smoothening and proper finishing with cement mortar/slurry (mortar 1:2 cement and coarse sand) in horizontal and vertical surface of foundations/roof etc. as per direction of E/I inclduing supply of all material labour and T&P etc. required for proper completion of wrok. (CSI No. 11.16)
25mm thick 1:2:4 cement concrete floor with cement, approved coarse sand and 20mm graded stone aggregate laid in panels finished with 3mm floating coat of neat cement, over base concrete. Rate includes cost of all materials, labour and T&P required for proper completion of work but excluding cost of base concrete. (CSI No. 12.01)
Painting or varnishing on iron works in small areas of new wood work with one coat of ready mixed priming paint and one coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should confirm to the ISI no. 103-1950. (CSI No. 13.01)
Painting or varnishing on iron works in small areas of every coat after Ist coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials, labour and T&P etc. required for proper completion of the work. Paint to be used should confirm to the ISI no. 103-1950. (CSI No. 13.02)
Omveer Singh Contractor
SATYA PAL SHARMA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .