| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹5.3 LAccepted-AOC | l1 | Accepted-AOC ok | |
| 2 | l2₹5.7 L+₹41,243.56 (7.82%)Rejected-AOC VPO KANHETI TEHSIL DISTRICT CHARKHI DADRI 127306 | CHARKHI DADRI | CHARKHI DADRI | HARYANA | 127306 | l2 | Rejected-AOC ok |
Tender Value
₹5.5 L
EMD Value
₹11,093
Closing Date
3 Oct 2022, 5:00 pmClosed
SATYENDER KUMAR
L.W.S. Divn. Ch-Dadri
Laying pipeline of fresh water for filling of various village pond and further dewatering of overflowing water of various drain
2022_HRY_239327_1
20223946112D 5FD1 48BE B47E E10867916C52134IRR
Open Tender
Civil Works
Works
60 days
BARSANA
2 documents required · 2 mandatory
₹1,000
₹11,093
Yes
15 Dec 2022
15 Sept 2022
4 Oct 2022
15 Sept 2022
3 Oct 2022
15 Sept 2022
Amount
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) Through Rate
[21.95.1]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 1. 350 mm Through Rate
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil Through Rate
[4.16.1.3]Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : 1.3. Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm Through Rate
[4.17]Extra for excavating trenches for pipes, cables etc. in all kinds of soil for depth exceeding 1.5 m, but not exceeding 3 m. (Rate is over corresponding basic item for depth up to 1.5 metre). Through Rate
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) Through Rate
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar Through Rate
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) Through Rate
[6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) Through Rate
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) Through Rate
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. Through Rate
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) Through Rate
CREDIT OF TILE LINING
SATYAPAL SINGH CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .