Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.4 LAWARDED | AWARDED |
Tender Value
₹1.4 L
EMD Value
₹4,250
Closing Date
22 Aug 2025, 11:00 pmClosed
Directorate of Municipal Administration
sinking of borewell and installation of motor at near almelakar house and construction of cc drain at near burud house to main road
DMA/2025-26/OW/WORK_INDENT47076
DMA/2025-26/OW/WORK_INDENT47076
Open
Other Works
Electronic Documents, First(One Cover)
DMA Town Panchayat Alamela
₹500
₹4,250
8 Aug 2025
8 Aug 2025
21 Aug 2025
sinking of borewell and installation of motor at near almelakar house and construction of cc drain at near burud house to main road
Sinking of Borewell of 165mm dia clear using super fast hydraulic Rig of capacity 250 PSIG &above 900 CFM & above in all strata including over burden upto 20mtrs. Fixing of casing pipes, collars &cap...
Above 50 mtr upto 100 mtr
Borewell depth of 100 to 150 Mtrs
Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, m...
Providing and laying at site of work MS casing caps as per IS 1239 (part- II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum...
Geophysical Investigation of site for sinking Borewell Geophysical Investigation of site for sinking Borewell for supplying drinking water to the habitation either through a hand pump, Mini Water Supp...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Form Work As per recommendations of Technical working group,
rates for formwork shall be added on percentage basis to the finished concrete item rate. For drain form works consider 35%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement
including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ra...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .