| 1 | L1₹1.6 LAccepted-AOC NO 7 90B GANDHI STREET KOVILOOTHU KADAYAM TENKASI DISTRICT TAMIL NADU | TENKASI | TAMIL NADU | 626140 | L1 | Accepted-AOC Accept | |
| 2 | L2₹1.7 L+₹2,683.50 (1.64%)Rejected-Finance KOVILOOTHU KADAYAM | MAYILADUTHURAI | TAMIL NADU | 609001 | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | SHIVAN INFRASTRUCTURE L2 | MS.SRI THIRUMAL CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavating all classes of soils including all labour charges and all other charges etc complete as per SS 20 B for Drainage foundation | 24.6 | m3 | 6,150 ₹6,150 | 4,846.2 ₹4,846.2 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 mix (One part of Cement, Four part of Fine Aggregate and Eight part of Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 3.6 | m3 | 22,212 ₹22,212 | 22,177.8 ₹22,177.8 Lowest |
| 3.00 | supply and erection of steel centering ,shuttering for soffits including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25x25x3 mm for boarding laid over silver oak joists of size 10cmx6.5cm spaced at 90 cm c/c and supported by casurina props 10 cm - 13 cm spaced at 75 cm c/c etc complete and as directed by the departmental officers (Retrieved materials shall be taken back by the contractor after concrete is laid) | 85 | m3 | 42,160 ₹42,160 | 41,565 ₹41,565 Lowest |
| 4.00 | supply and erection of steel centering ,shuttering for soffits including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25x25x3 mm for boarding laid over silver oak joists of size 10cmx6.5cm spaced at 90 cm c/c and supported by casurina props 10 cm - 13 cm spaced at 75 cm c/c etc complete and as directed by the departmental officers (Retrieved materials shall be taken back by the contractor after concrete is laid) | 3.1 | m2 | 1,782.5 ₹1,782.5 | 1,627.5 ₹1,627.5 Lowest |
| 5.00 | Plain Cement Concrete 1:3:6mix (One part of Cement,Three part of Fine Aggregate and Six part of Coarse Aggregate) Using 20mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28). | 10.3 | m3 | 71,585 ₹71,585 | 71,523.2 ₹71,523.2 Lowest |
| 6.00 | Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3. | 120 | kg | 11,503.2 ₹11,503.2 | 11,016 ₹11,016 Lowest |
| 7.00 | Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3. | 0.75 | m3 | 6,945 ₹6,945 | 6,939 ₹6,939 Lowest |
| 8.00 | Plastering in Cement Mortor 1:5 Mix (one cement, four sand) 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. | 13.5 | m2 | 4,009.5 ₹4,009.5 | 3,969 ₹3,969 Lowest |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
17 Sept 2025, 3:00 pmClosed
Executive Officer
Town Panchayat Office Alwarkruichi
Construction of Drainage and Culvert work at 5th Ward Narayanasamy kovil South North Street in Alwarkurichi Town Panchayat.
2025_DTP_603706_2
116-2/2025/A1
Open Tender
Civil Works
Works
Alwarkurichi Town Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,000
Yes
13 Oct 2025
13 Sept 2025
17 Sept 2025
13 Sept 2025
17 Sept 2025
13 Sept 2025
Earth work excavating all classes of soils including all labour charges and all other charges etc complete as per SS 20 B for Drainage foundation
Plain Cement Concrete 1:4:8 mix (One part of Cement, Four part of Fine Aggregate and Eight part of Coarse Aggregate) Using 40mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28).
supply and erection of steel centering ,shuttering for soffits including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25x25x3 mm for boarding laid over silver oak joists of size 10cmx6.5cm spaced at 90 cm c/c and supported by casurina props 10 cm - 13 cm spaced at 75 cm c/c etc complete and as directed by the departmental officers (Retrieved materials shall be taken back by the contractor after concrete is laid)
supply and erection of steel centering ,shuttering for soffits including necessary supports and strutting for all RCC works using MS sheets of suitable size of BG 10 stiffened with MS angle of size 25x25x3 mm for boarding laid over silver oak joists of size 10cmx6.5cm spaced at 90 cm c/c and supported by casurina props 10 cm - 13 cm spaced at 75 cm c/c etc complete and as directed by the departmental officers (Retrieved materials shall be taken back by the contractor after concrete is laid)
Plain Cement Concrete 1:3:6mix (One part of Cement,Three part of Fine Aggregate and Six part of Coarse Aggregate) Using 20mm ISS HBG metal for foundation and basement including dewatering if found necessary and laid in layer of not more than 15cm thick and consolidated including all cost conveyance of materials and labour charges etc. complete as per standard specifications and as directed by departmental Engineers(TNBP No.28).
Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3.
Reinforced Cement Concrete 1:1½:3 Mix (One part cement, one and half part sand and three part of aggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc. Complete with std. Specifications. TNDSS NO: 30 V, VI (S3), VII-3.
Plastering in Cement Mortor 1:5 Mix (one cement, four sand) 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
SHIVAN INFRASTRUCTURE (BID ID -1458467)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_721651.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .