Tender Value
₹12.5 L
EMD Value
₹1.3 L
Closing Date
3 Sept 2026, 12:00 pmClosed
Chief Engineer civil
NAGAR NIGAM AGRA
Zone-1 Chhatta, Room No. 58 Road improvement using hot-mix asphalt from Kalindi Vihar 80-Fua Road to the Radhapuram gate installation of interlocking tiles on drains and side berms.
2026_DOLBU_1180566_1
03-08-2026/NAGAR NIGAM AGRA/03-09-2026/156
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Nagar Nigam
₹1.3 L
29 Aug 2026
29 Aug 2026
3 Sept 2026
29 Aug 2026
3 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 {Chapter No.20 Si No.16} | 400 | Sqm | 19 | ₹7,600 |
| 2 | Earth work in Cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required lavels and slops and also including 1.5 m lift and 30 m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge etc. all complete. (20-Chapter PWD.SCH.No.253(a)) | 120 | Cum | 135 | ₹16,200 |
| 3 | Earth work in Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 M form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter S.I.NO.- 251) | 48 | Cum | 145 | ₹6,960 |
| 4 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (Chapter No.3 Si.No.8) | 116 | Cum | 230.1 | ₹26,691.6 |
| 5 | Providing and laying Cement Concrete in 1:5:10 (1 cement :5 fine sand 10 Stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter Sr.No.1) | 12.16 | Cum | 5,250 | ₹63,840 |
| 6 | Class-150 Brick Work in 1:4 Cement and Coarse Sand, mortar in foundation and plinth including supply of all materials, labor and tools and plants, etc. Required for proper completion of the work. ( Chapter No. 06 Sr.No. 2) | 37.92 | Cum | 5,600 | ₹2,12,352 |
| 7 | 12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive.
(c) 1 Cement : 4 Coarse sand.
(Chapter No.13 Si.No.2) | 112 | Sqm | 190 | ₹21,280 |
| 8 | Providing and laying 45mm - 63mm gauge stone ballast with consolidation and rolling etc. All complete. (Non Scheduled) | 48 | Cum | 1,663.5 | ₹79,848 |
| 9 | Providing and Stacking 22.40-53mm guage stone aggregates of specific sizes to water bound macadam specification including etc all complete.(NS) | 80 | Cum | 1,763.5 | ₹1,41,080 |
| 10 | Supply and Laying stone dust etc all complete. | 12 | Cum | 1,638.5 | ₹19,662 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.81 MB
BOQ_2219817.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .