Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.2 LAccepted-AOC 319 A MEERAPUR PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211001 | ₹15.2 L | 1 | Accepted-AOC L1 |
| 2 | 2₹15.7 LRejected-AOC B 708 NEO HIGHTS DR LOHIA MARG CIVIL LINES PRAYAGRAJ PRAYAGRAJ PRAYAGRAJ UTTAR PRADESH 211001 UDYAM UP 03 0077658 | PRAYAGRAJ | UTTAR PRADESH | 211001 | ₹15.7 L | 2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | R.S.ASSOCIATE L1 | Marc vision infrasolutions pvt. ltd. L2 |
|---|---|---|---|---|---|
| 1.00Revetment of tower foundation at location No. 73(B) of 220 KV S/C Sultanpur - Pratapgarh Line under Electy. Trans. Division- Pratapgarh. The job includes the following work. | |||||
| 1.01 | Excavation of earth with the help of suitable T&P and labour, watering and ramming of excavated earth. | 90.73 | CuM | 110 ₹9,980.30 | 125 ₹11,341.25 |
| 1.02 | Concrete with 40 mm stone blast, coarse sand and cement mortar in ratio 8:4:1 ratio in foundation and under floor including the cost of all material labour & T&P etc required for proper completion of work satisfactory. | 18.15 | CuM | 3,900 ₹70,785 | 4,500 ₹81,675 |
| 1.03 | 1st class bricks work for the construction of retaining wall in 1:4 ratio cement and sand including the cost of all material, Labour & T&P etc. Required for proper compleion of work. | 273.41 | CuM | 4,700 ₹12.9 L | 4,700 ₹12.9 L |
| 1.04 | Concrete in plinthwith 30mm stone blast coarse sand and cement mortar in ratio 4:2:1 including the cost of all material, labour and T&P etc. required for proper completion of work. | 2.53 | CuM | 7,250 ₹18,342.50 | 7,500 ₹18,975 |
| 1.05 | Earth filling under floor and in area between tower foundation and retaining wall including the cost of soil to be obtained by the contractor from outside including watering, remaining and dressing of earth etc. complete including the cost of earth rayalty, taxes, freight etc and cost of material labour and T&P Required for proper completion of work satisfactorily. | 85.45 | CuM | 150 ₹12,817.50 | 170 ₹14,526.50 |
| 1.06 | 12 mm plaster work on wall with cement and sand in ratio 1:4 including cost of all material labour and T&P required for proper completion of work satisfactorily. | 401.4 | SQM | 100 ₹40,140 | 125 ₹50,175 |
| 1.07 | Making weep holes providing plastic pipe of length 03 meter (cost including the cost of plastic pipes including cutting in accordance size and fitting them in two layers at he span of 2mtr. At depth of 0.5 mtr., 1.25 mtr. & 2 mtr. Respectively from the top of the revetment wall) 01 Job for one location. | 5 | JOB | 2,300 ₹11,500 | 3,000 ₹15,000 |
| 1.08 | 1st class bricks on edge floor laid including preparation of base to proper slope including supply of all material, labour and T&P etc. required for proper completion of work satisfactorily. | 69.19 | SQM | 1,000 ₹69,190 | 1,300 ₹89,947 |
Tender Value
₹16.9 L
EMD Value
₹20,000
Closing Date
19 Sept 2025, 5:00 pmClosed
Suprintending Engineer
Superintending Engineer Electricity Transmission Circle I 57 George Town Prayagraj 211002 PH- 0532-2256499/9415311005
Construction of revetment of tower foundation at location No.73 (B-0) of 220 KV Sultanpur-Pratapgarh line, under Electy. Trans. Division- Pratapgarh.
2025_UPTCL_1061657_1
12-ETC-I(A)/ 2025-2026
Open Tender
Electrical Works
60 days
Pratapgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE ETC-I PRAYAGRAJ
₹20,000
14 Jan 2026
31 Jul 2025
20 Sept 2025
31 Jul 2025
19 Sept 2025
31 Jul 2025
Amount
Revetment of tower foundation at location No. 73(B) of 220 KV S/C Sultanpur - Pratapgarh Line under Electy. Trans. Division- Pratapgarh. The job includes the following work.
Excavation of earth with the help of suitable T&P and labour, watering and ramming of excavated earth.
Concrete with 40 mm stone blast, coarse sand and cement mortar in ratio 8:4:1 ratio in foundation and under floor including the cost of all material labour & T&P etc required for proper completion of work satisfactory.
1st class bricks work for the construction of retaining wall in 1:4 ratio cement and sand including the cost of all material, Labour & T&P etc. Required for proper compleion of work.
Concrete in plinthwith 30mm stone blast coarse sand and cement mortar in ratio 4:2:1 including the cost of all material, labour and T&P etc. required for proper completion of work.
Earth filling under floor and in area between tower foundation and retaining wall including the cost of soil to be obtained by the contractor from outside including watering, remaining and dressing of earth etc. complete including the cost of earth rayalty, taxes, freight etc and cost of material labour and T&P Required for proper completion of work satisfactorily.
12 mm plaster work on wall with cement and sand in ratio 1:4 including cost of all material labour and T&P required for proper completion of work satisfactorily.
Making weep holes providing plastic pipe of length 03 meter (cost including the cost of plastic pipes including cutting in accordance size and fitting them in two layers at he span of 2mtr. At depth of 0.5 mtr., 1.25 mtr. & 2 mtr. Respectively from the top of the revetment wall) 01 Job for one location.
1st class bricks on edge floor laid including preparation of base to proper slope including supply of all material, labour and T&P etc. required for proper completion of work satisfactorily.
Marc vision infrasolutions pvt. ltd. (BID ID -5477802)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid