Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Not Admitted-PreQual/Technical 145 1 0 NEAR OLD LIC SHIV NAGAR VILLAGE TOWN MODIPURAM CITY MEERUT MEERUT UTTAR PRADESH 250110 INDIA | MEERUT | UTTAR PRADESH | 250110 | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹8.3 L
EMD Value
₹9,000
Closing Date
19 May 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Electricity Construction and Works Division, P.V.V.N.L., Victoria Park, Meerut
Incrasing Capacity of 33 KV Substation Sainik Vihar, Kankerkhera District Meerut
2023_PVVNL_801535_1
01/ECWD/MRT/2023-24
Open Tender
Electrical Works
Lump-sum
30 days
Meerut
Please refer tender documents and notice
3 documents required · 3 mandatory
₹1,180
Payable at E.E., E.C.W.D, Meerut
₹9,000
23 May 2023
12 May 2023
19 May 2023
12 May 2023
19 May 2023
12 May 2023
Safe carriage of Following Material with loading & unloading at both ends respectively. (under jurisdiction of PVVNL) 33 KV C.T 400/200 1A
33 KV Post Insulator
Ms Channel and Ms Angle
Hiring of D/G Set including carriage, loading, unloading & operating charges (with fuel) at 33/11 KV Substation under construction in case L.T. supply is not available near S/S within prescribed accessible limit. a) 63 KVA, Three phase, D/G Set for fabrication of different structure at Substation.
Dismantling of Existing 5 MVA Transformer and 33 KV CT outdoor and Kept at suitable place outside switchyard After opening all Connection.
Miscellaneous Electrical works of Increasing Capacity of 33/11 KV Substation Sanik Vihar Kanker Khera Meerut from 2x5 MVA to 10+5 MVA Installation of 33/11 KV, 10 MVA Transformer : Shifting of available 10 MVA 33/11 KV, Transformer to transformer plinth in Switch Yard.
Erection of shifted Transformer at plinth by fixing all accessories like radiators, conservator tank, filling the transformer oil to desired level and ensuring that there is no leakage, complete job in all respect & proper connection after Shifted Transformer & CT.
Boring and lowering of G.I. Pipe size 32 mm dia… into the ground up to water level with the lower end of solid copper cone Approx 225mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the M.S. earth Strip for Transformer neutral connection, the earth strip will be welded to the G.I. pipe and neutral earthing support.
Fabrication and erection of neutral earthing L Type support made of M.S. Channel size 100×50mm. Structure shall be 4 Mtr. long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300×300×700mm and painted with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and M.S. Earthing strip with the help of flexible copper bond, M.S. Bolt and washer.
Fabrication and erection of cable support made of two pieces of M.S. Angle (50×50×6)/65×65×6) mm, 2.75 meter long, joined to each other by means of 5 Nos. M.S. Flat (50×6)mm pieces of size 150 mm long each by welding at equal intervals and grouting in a block of size (300×300×700)mm in CC 1:3:6 complete with one coat of ready mixed primer and two coats of Al. paint. Work includes providing of three Nos. M.S. clamps made of (50×6)mm M.S. Flat for holding the cable including nuts and bolts.
Providing & Fabrication of copper bus bar of size (2500×50×6)mm in L.V. side of 5 MVA 33/11 KV, power transformer. Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor as well as providing empire tape and H.T. tape etc. for proper insulation work.
Construction of fire wall between Transformer (as per Specification)
Excavation of Earth, Erection of Structure 33 KV CT, Grouting and Plinthing of completed Structure with fabrication work if required.
Erection of Post Insulator on Post Insulator Structure
B.Dayal
Raj Engineers
Vivek Electricals
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .