| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.4 LAccepted-Finance | L1 | Accepted-Finance BEEING FIRST LOWEST | |
| 2 | L2₹36.6 L+₹26,139.20 (0.72%)Rejected-Finance | L2 | Rejected-Finance BEEING SECOND LOWEST | |
| 3 | L3₹36.6 L+₹29,139.20 (0.80%)Rejected-Finance FLAT NO 202 SATYA GANGA APARTMENT SHIVPURI BORING ROAD PATNA BIHAR 800023 | PATNA | BIHAR | 800023 | L3 | Rejected-Finance BEEING THIRD LOWEST | |
| 4 | L4₹43.6 L+₹7.3 L (20.0%)Rejected-Finance | L4 | Rejected-Finance BEEING FOURTH LOWEST | |
| 5 | L5₹48.6 L+₹12.2 L (33.6%)Rejected-Finance | L5 | Rejected-Finance BEEING FIFTH LOWEST |
Tender Value
₹66.3 L
EMD Value
₹1.3 L
Closing Date
28 Aug 2021, 2:00 pmClosed
DE TP Survey
General Manager Core Network Tx East Ground Floor CTTC Building Sanchar Parisar Budh Marg Patna 800001
Rail tail OFC link work at Sasaram, Barh, Bihar Sharif , Bhagalpur and Katihar and anywhere in Bihar
2021_BSNL_84402_1
GM/CNTXE-PT/BSNL/OFC LAYING WORK/e-Tender/21-22/02
Open Tender
OFC Laying Works
Works
90 days
Rail tail OFC link work at Sasaram, Barh, Bihar Sh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Yes
Account Officer (Cash), O/o Dy GM TP
₹1.3 L
Yes
23 Sept 2021
9 Aug 2021
31 Aug 2021
9 Aug 2021
28 Aug 2021
11 Aug 2021
9 Aug 2021 - 10 Aug 2021
Amount
Excavation of trenching to a depth of 165/135cm with 45cm at top and 30cm at bottom with clearance of all obstructions, removal of water if required and reinstatement as per specification and construction of the tender.Normal /soft soil(Normal depth165 cm)
Horizontal Direction Drilling for laying of U/G PLB/HDPE Pipes to a standard depth of 1.65m as specified in laying practices of Cable, by HDD method & pulling up to 2 Pipes
Transporting, laying, jointing and strengthening of PLB HDPE pipes (33/40 mm) in excavated trench including pulling of 4mm dia nylon rope with sealing the section with end plugs as per construction and specification of tender. The rate includes the wooden balloon test for 200mtr pipe and Duct Integrating Test in case of 1000 mtr pipe after reinstatement. Single pipe
Pulling of OF cable to the laid duct including all associated works as per specification. Rate includes transportation of cable drums to the site & the balloon/duct integrating test before pulling OF Cable. (Rs.200/- will be deducted for each empty cable drum). Upto 48 F O F Cable (pulling)
supply and fixing of pre cost RCC joint chember with seize 1.2 mtr inner dia 0.8 meter depth and ring thickness of 40 mm made of standard 1: 2:4 scope includes required exavation back filling with clean sand and all above operrations including supply of materials details as per specification .
Supply & Fixing of RCC Route/Joint indicators of 125mm x 125mm on the top, 250mmx250mm on the bottom & 1200mm height & BSNL Logo engraved on the top portion, painting with yellow synthetic enamel paint & sign writing ‘BSNL Logo’ portion with black synthetic enamel & red for J/I including transport at site.
Splicing of 48 fibres in route
Cost towards transportation of materials incuuding cost of Laoading & Unloading, from store to work site.* See note 1 Charges towards transportation of materials:
Bighnahanta Construction Pvt. Ltd.
TRIJAL CONSTRUCTIONS PRIVATE LIMITED
somya contractor and developer pvt ltd
Dolphin Contractors and Engineers Pvt Ltd
BHUWNESHWAR PATHAK CONSTRUCTION PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .