Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-Finance | L1 | Accepted-Finance Lowest | |
| 2 | L2₹14.4 L+₹4,862 (0.34%)Rejected-Finance 5 E B 607003 | CUDDALORE | TAMIL NADU | 607003 | L2 | Rejected-Finance Higher than lowest | |
| 3 | L2₹14.4 L+₹4,862 (0.34%)Rejected-Finance 2 M S CHIDAMBARAM 608001 | CUDDALORE | TAMIL NADU | 608001 | L2 | Rejected-Finance Higher than lowest | |
| 4 | L3₹14.5 L+₹19,448 (1.36%)Rejected-Finance | L3 | Rejected-Finance Higher than lowest | |
| 5 | L4₹18.5 L+₹4.1 L (28.8%)Rejected-Finance | L4 | Rejected-Finance Higher than lowest |
Tender Value
₹19.4 L
EMD Value
₹19,500
Closing Date
7 Oct 2026, 12:00 pmClosed
DIVISIONAL ENGINEER CUDDALORE
NO.51, BEACH ROAD, PUDUPALAYAM, CUDDALORE
Maintenance works for the Government Roads of Kattumannarkoil Sub Division upto March 2027
2026_HWAY_706234_1
TN 02 MTC KMK
Open Tender
Civil Works - Highways
Percentage
CUDDALORE
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹19,500
Yes
7 Oct 2026
21 Sept 2026
7 Oct 2026
21 Sept 2026
7 Oct 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and Laying Wet Mix Macadam consisting of clean crushed aggregates confirming to the grading given in Table No.400-13, including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver on well prepared surface and compacting with vibratory roller to achieve the desired density, etc., complete as directed by the Engineer. as per MORTH No. 111, 112, 406, 900. | |||||
| 1.01 | Road - E | 50 | Cubic metre | 3,050.32 | ₹1,52,516 |
| 1.02 | Road - F | 68 | Cubic metre | 3,050.32 | ₹2,07,421.76 |
| 2Collection and supply of 13.20mm size IRC HBG metal from approved quarry including cost conveyance and stacking at Cuddalore (H) Sub division store to departmental gauge for premeasurement as directed by departmental officers etc., complete as per standard specifications | |||||
| 2.01 | Road - E | 80 | Cubic metre | 2,617.13 | ₹2,09,370.4 |
| 2.02 | Road - F | 73 | Cubic metre | 2,617.13 | ₹1,91,050.49 |
| 3Providing and applying Tack Coat over existing bituminous surfaces with Bitumen Emulsion (RS-I type) using mechanical sprayer at the rate of 2 kg per 10sqm on the prepared bituminous surface as directed by the Engineer as per MORTH No. 111, 112, 503, 900 | |||||
| - | Road - A | 90 | Square metre | 34.66 | ₹3,119.4 |
| - | Road - B | 130 | Square metre | 34.66 | ₹4,505.8 |
| - | Road - C | 390 | Square metre | 34.66 | ₹13,517.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BiddocumentKmk.pdf
Tender Documents • 0.33 MB
BOQ_848833.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .