| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹69.1 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹70.7 L+₹1.7 L (2.40%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹70.3 L
EMD Value
₹71,000
Closing Date
12 Jul 2022, 3:00 pmClosed
The Project Director DRDA Chengalpattu
O/o The Project Director DRDA Chengalpattu
Improvements to 5 No.of Tank Ponds in Thiruporur Block in Chengalpattu District Having Package No.08
2022_RDTN_238039_1
4683.2022.A10 Dt.24.06.2022
Open Tender
Civil Works
Item Rate
90 days
Thiruporur Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹71,000
O/o The Project Director DRDA Chengalpattu
3 Nov 2022
30 Jun 2022
12 Jul 2022
30 Jun 2022
12 Jul 2022
30 Jun 2022
5 Jul 2022
Amount
PART I: Iprovements to Komannagar Kulam @ Komannagar Village in Thaiyur Panchayat Estimate Amount : Rs.19.15 Lakhs
Clearing the Scrub jungles Including All Cost Of Labour Charges as per standard specifications
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
Sectioning the Bund including Breaking of clouds ,tamping and sectoning etc.complete
Benching of old Embankment slopes etc.
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20B etc.
Filling with good Msand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Gravel Backing for Revetment including cost and Conveyance of all charges etc.
Rough Stone dry Packing for Revetment including cost and Conveyance of all charges etc.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Pointing with CM1:3 including cost and conveyance of all materials to site and cost of labour charges etc,complete
Painting Two coat with best approved Emulsion paint including cost and conveyance of all charges etc.
PART II: Iprovements to Dharga Kulam @ Kovalam Habitation in Kovalam Panchayat Estimate Amount : Rs.13.67 Lakhs
Clearing the Scrub jungles Including All Cost Of Labour Charges as per standard specifications
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
Sectioning the Bund including Breaking of clouds ,tamping and sectoning etc.complete
Benching of old Embankment slopes etc.
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20B etc.
Filling with good Msand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Gravel Backing for Revetment including cost and Conveyance of all charges etc.
Rough Stone dry Packing for Revetment including cost and Conveyance of all charges etc.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Pointing with CM1:3 including cost and conveyance of all materials to site and cost of labour charges etc,complete
Painting Two coat with best approved Emulsion paint including cost and conveyance of all charges etc.
PART III: Iprovements to Nochi Kuttai @ Nemmeli Village in Nemmeli Panchayat Estimate Amount : Rs.10.73 Lakhs
Clearing the Scrub jungles Including All Cost Of Labour Charges as per standard specifications
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
Sectioning the Bund including Breaking of clouds ,tamping and sectoning etc.complete
Benching of old Embankment slopes etc.
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20B etc.
Filling with good Msand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Gravel Backing for Revetment including cost and Conveyance of all charges etc.
Rough Stone dry Packing for Revetment including cost and Conveyance of all charges etc.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Pointing with CM1:3 including cost and conveyance of all materials to site and cost of labour charges etc,complete
Painting Two coat with best approved Emulsion paint including cost and conveyance of all charges etc.
PART IV: Iprovements to Thamarai Kulam Near Samathuva Nagar in Muttukadu Panchayat Estimate Amount : Rs.14.44 Lakhs
Clearing the Scrub jungles Including All Cost Of Labour Charges as per standard specifications
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
Sectioning the Bund including Breaking of clouds ,tamping and sectoning etc.complete
Benching of old Embankment slopes etc.
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20B etc.
Filling with good Msand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Gravel Backing for Revetment including cost and Conveyance of all charges etc.
Rough Stone dry Packing for Revetment including cost and Conveyance of all charges etc.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Pointing with CM1:3 including cost and conveyance of all materials to site and cost of labour charges etc,complete
Painting Two coat with best approved Emulsion paint including cost and conveyance of all charges etc.
PART V: Iprovements to Grama Kulam in Pattipulam village in Pattipulam Panchayat Estimate Amount : Rs.12.33 Lakhs
Clearing the Scrub jungles Including All Cost Of Labour Charges as per standard specifications
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20A
Sectioning the Bund including Breaking of clouds ,tamping and sectoning etc.complete
Benching of old Embankment slopes etc.
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay, stiff black cotton, hard red earth, shales,muram, gravel stoney earth, and earth mixed with small size boulders and hard gravelly soil as per SS 20B etc.
Filling with good Msand including cost and conveyance of all materials to site and all labour charges for filling etc.,complete.
Cement concrete 1 :4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Supply and erection of centring incl all necessary supports and strutting all cross bracings etc complete
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
C.C. 1:3:6mix using 40mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Gravel Backing for Revetment including cost and Conveyance of all charges etc.
Rough Stone dry Packing for Revetment including cost and Conveyance of all charges etc.
C.C. 1:2:4mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and cost of labour charges etc,complete
Pointing with CM1:3 including cost and conveyance of all materials to site and cost of labour charges etc,complete
Painting Two coat with best approved Emulsion paint including cost and conveyance of all charges etc.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
NIRMAL
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .