| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | ₹4.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.3 LRejected-AOC | ₹4.3 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S Santha L2 | R Selvarani L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and Depositing on Bank with in initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard Gravelly soil as per SS 20B Core Wall | 2.47 | cum | 124.64 ₹307.86 | 122.64 ₹302.92 |
| 2.00 | Earthwork excavation and Depositing on Bank with in initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard Gravelly soil as per SS 20B Earth Work | 26.2 | cum | 247.64 ₹6,488.17 | 246.4 ₹6,455.68 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 22.7 | cum | 5,083.66 ₹1.2 L | 5,081.64 ₹1.2 L |
| 4.00 | Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 13.6 | cum | 6,465.97 ₹87,937.19 | 6,464.9 ₹87,922.64 |
| 5.00 | Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyanceof all materials to work site and all labour charges etc. | 11.37 | cum | 5,816.64 ₹66,135.20 | 5,814 ₹66,105.18 |
| 6.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete CORE WALL, LANE OUTER | 19.57 | Cum | 172.66 ₹3,378.96 | 170.64 ₹3,339.42 |
| 7.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete SIDE WALL, DECK BOTTOM,ALL ROUND | 103.65 | cum | 515.64 ₹53,446.09 | 514.21 ₹53,297.87 |
| 8.00 | Supplying and fabricating and placing in position MS or RTS reinforcement works | 127.55 | cum | 90 ₹11,479.50 | 89.9 ₹11,466.75 |
| 9.00 | Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly | 0.82 | cum | 8,777.4 ₹7,197.47 | 8,777.4 ₹7,197.47 |
| 10.00 | Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc | 18.54 | cum | 548.15 ₹10,162.70 | 548.15 ₹10,162.70 |
Tender Value
Refer Docs
EMD Value
₹4,340
Closing Date
19 Jun 2025, 5:00 pmClosed
Block Development officer,Walajah
Block Development office,Walajah
Providing CC Road and Drainage at Jeevanantham Salai 3rd Cross Street H/O Nowlock Panchayat
2025_RDTN_570038_1
A2/1661/2025
Open Tender
Civil Works
30 days
Block Development office, Walajah
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,340
28 Feb 2026
17 Jun 2025
19 Jun 2025
17 Jun 2025
19 Jun 2025
17 Jun 2025
Amount
Earthwork excavation and Depositing on Bank with in initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard Gravelly soil as per SS 20B Core Wall
Earthwork excavation and Depositing on Bank with in initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard Gravelly soil as per SS 20B Earth Work
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete CORE WALL, LANE OUTER
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete SIDE WALL, DECK BOTTOM,ALL ROUND
Supplying and fabricating and placing in position MS or RTS reinforcement works
Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance of all materials to site and all labour charges etc
S Santha (BID ID -1372851)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_680989.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid