| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹82.5 LAccepted-Finance PLOT NO 67 VIMPUR P O NEW BAPUJI NAGAR P S AIRFIELD BHUBANESWAR PIN 751020 KHURDA ODISHA | KHORDHA | ODISHA | 751020 | ₹82.5 L | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹96.2 L+₹13.7 L (16.6%)Rejected-Finance | ₹96.2 L+₹13.7 L (16.6%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹96.3 L+₹13.8 L (16.7%)Rejected-Finance | ₹96.3 L+₹13.8 L (16.7%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹1.1 Cr+₹24.5 L (29.6%)Rejected-Finance D NO 33 15 3A SWAPNA NIVAS KADIYALAVARI STREET SEETHARAPURAM VIJAYAWADA 520002 | VIJAYAWADA | KRISHNA | ANDHRA PRADESH | 520002 | ₹1.1 Cr+₹24.5 L (29.6%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹1.1 Cr+₹24.6 L (29.8%)Rejected-Finance NUAPATANA P O BANGUARI P S BALIANTA KHURDA 751032 | KHORDHA | ODISHA | 751032 | ₹1.1 Cr+₹24.6 L (29.8%) | L-5 | Rejected-Finance L-5 |
| Sl No | Description | Qty | Unit | MD RIYAJUDDIN L1 | BANAMALI ROUT L4 | SUMEET MOHANTY L3 | NARESH KUMAR BEHERA L2 | PRASANTA KUMAR BEURIA L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil | 7,670 | Sqm | 10 ₹76,700 Lowest | 27 ₹2,07,090 | 60 ₹4,60,200 | 100 ₹7,67,000 | 95 ₹7,28,650 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
All kinds of soil | 670 | Cum | 87 ₹58,290 Lowest | 144 ₹96,480 | 100 ₹67,000 | 120 ₹80,400 | 95 ₹63,650 |
| 3.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 40 | Cum | 900 ₹36,000 Lowest | 990 ₹39,600 | 1,400 ₹56,000 | 900 ₹36,000 Lowest | 1,500 ₹60,000 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 Sand : 4 graded stone aggregate 20 mm nominal size) | 790 | Cum | 3,600 ₹28,44,000 Lowest | 4,950 ₹39,10,500 | 3,800 ₹30,02,000 | 4,000 ₹31,60,000 | 3,900 ₹30,81,000 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 810 | Cum | 2,400 ₹19,44,000 Lowest | 3,600 ₹29,16,000 | 3,250 ₹26,32,500 | 3,000 ₹24,30,000 | 4,200 ₹34,02,000 |
| 6.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 50 | Cum | 4,323 ₹2,16,150 Lowest | 5,220 ₹2,61,000 | 4,400 ₹2,20,000 | 7,000 ₹3,50,000 | 4,900 ₹2,45,000 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | 720 | Sqm | 75 ₹54,000 Lowest | 225 ₹1,62,000 | 250 ₹1,80,000 | 150 ₹1,08,000 | 170 ₹1,22,400 |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 50 | Sqm | 399 ₹19,950 | 405 ₹20,250 | 280 ₹14,000 Lowest | 300 ₹15,000 | 350 ₹17,500 |
| 9.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more | 4,000 | Kg | 60 ₹2,40,000 | 75.6 ₹3,02,400 | 74 ₹2,96,000 | 52 ₹2,08,000 Lowest | 100 ₹4,00,000 |
| 10.00 | Supplying and laying Moorum/ Soil in layers of 20cm finished depth, breaking clods/ over size material, removal of stumps/roots and the like & watering, grading/levelling each layer with grader and rolling each layer with vibratory roller of minimum 8 tonnes capacity and dressing to the required grade, camber and slope complete as per specifications and as directed by the Engineer-in-charge.
(The item includes cost of work, payment of necessary royalty, carriage of Moorum/soil upto work site for all leads and lifts involved. Payment to be made for compacted quantity only). | 670 | Cum | 399 ₹2,67,330 | 540 ₹3,61,800 | 400 ₹2,68,000 | 350 ₹2,34,500 Lowest | 820 ₹5,49,400 |
Tender Value
₹1.8 Cr
EMD Value
₹5.4 L
Closing Date
4 Mar 2026, 6:00 pmClosed
Sr. Manager (E-C)
O/o Airport Director, B.P.I Airport, Bhubaneswar
Special Repairs to NAVAID Buildings or Installations and other ancillary buildings in operational area
2026_AAI_266593_1
AAI/BS/ENGG(C)/NIT-16/2025-26
Open Tender
Civil Works
Works
180 days
B.P.I Airport, Bhubaneswar
Please refer Tender documents.
14 documents required · 14 mandatory
₹1,180
₹5.4 L
O/o Airport Director, B.P.I Airport, Bhubaneswar
27 Mar 2026
10 Feb 2026
6 Mar 2026
11 Feb 2026
4 Mar 2026
11 Feb 2026
11 Feb 2026 - 18 Feb 2026
17 Feb 2026
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .