Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-AOC 18 SANKAR BOSE ROAD KOLKATA | L1 | Accepted-AOC Lowest rate | |
| 2 | L2₹13.3 L+₹1,630 (0.12%)Rejected-Finance B 11 1 KALYANI NADIA 741235 | KALYANI | NADIA | WEST BENGAL | 741235 | L2 | Rejected-Finance THE BID IS NOT L1 | |
| 3 | L3₹13.3 L+₹3,260 (0.25%)Rejected-Finance 3 1 SWAMI VIVEKANANDA ROAD KOLKATA 700074 | KOLKATA | KOLKATA | WEST BENGAL | 700074 | L3 | Rejected-Finance THE BID IS NOT L1 |
| Sl No | Description | Qty | Unit | S. Dutta L3 | M S ENTERPRISE L1 | M/S. DILIP MITRA L2 |
|---|---|---|---|---|---|---|
| 1.00PART - A | ||||||
| 1.10Labour charges for 1 (One) Nos. operating personnel for operation of pumping machinery of each pump House by Automatic Panel including operation of valve, disinfection arrangement, internal / external illuminations as per specification and round the clock guarding of the whole installation will all accessories w.e.f 01-03-2024 to 31-12-2024 | ||||||
| 1.11 | For P/H - I (Z-I) | 306 | days | 582 ₹1,78,092 | 580 ₹1,77,480 Lowest | 581 ₹1,77,786 |
| 1.12 | For P/H - II (Z-I) | 306 | days | 582 ₹1,78,092 | 580 ₹1,77,480 Lowest | 581 ₹1,77,786 |
| 1.13 | For P/H - III (Z-I) | 306 | days | 582 ₹1,78,092 | 580 ₹1,77,480 Lowest | 581 ₹1,77,786 |
| 1.14 | For P/H - I (Z-II) | 306 | days | 582 ₹1,78,092 | 580 ₹1,77,480 Lowest | 581 ₹1,77,786 |
| 1.15 | For P/H - II (Z-II) | 306 | days | 582 ₹1,78,092 | 580 ₹1,77,480 Lowest | 581 ₹1,77,786 |
| 2.00PART - B | ||||||
| 2.10Supervision charges for electrical installation by Licensed Electrician as per IE Rules, 1956 read with latest amendments,Overhead Expenditure as per specification & direction of the EIC. w.e.f 01-03-2024 to 31-12-2024 | ||||||
| 2.11 | For P/H - I (Z-I) | 10 | months | 8,769 ₹87,690 | 8,765 ₹87,650 Lowest | 8,767 ₹87,670 |
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
24 Feb 2024, 4:00 pmClosed
Executive Engg., EMD PHE Dte.
P-16 India Exchange Place Extn CIT Annex Bldg Kol
Operation and guarding of the pumping machinery at Paschim Panhberia WS Scheme, Dist-24Pgs(N), under EMD, PHE Dte.
2024_PHED_657632_7
WBPHED/EE/EMD/NIET/39/2023-24
Open Tender
MECHANICAL
Item Rate
306 days
P-16 India Exchange Place Extn CIT Annex Bldg Kol
Please refer Tender documents.
5 documents required · 5 mandatory
₹33,000
Yes
17 Apr 2026
2 Feb 2024
26 Feb 2024
2 Feb 2024
24 Feb 2024
2 Feb 2024
Amount
PART - A
Labour charges for 1 (One) Nos. operating personnel for operation of pumping machinery of each pump House by Automatic Panel including operation of valve, disinfection arrangement, internal / external illuminations as per specification and round the clock guarding of the whole installation will all accessories w.e.f 01-03-2024 to 31-12-2024
For P/H - I (Z-I)
For P/H - II (Z-I)
For P/H - III (Z-I)
For P/H - I (Z-II)
For P/H - II (Z-II)
PART - B
Supervision charges for electrical installation by Licensed Electrician as per IE Rules, 1956 read with latest amendments,Overhead Expenditure as per specification & direction of the EIC. w.e.f 01-03-2024 to 31-12-2024
For P/H - I (Z-I)
For P/H - II (Z-I)
For P/H - III (Z-I)
For P/H - I (Z-II)
For P/H - II (Z-II)
M/S. DILIP MITRA
S. Dutta
stage.html
html • 0.05 MB
technical_1423067.pdf
techsummary_1423067.pdf
finance_1423067.pdf
BOQ Comparative Chart
xlsx
finsummary_1423067.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.60 MB
Tendernotice_2.pdf
PDF • 0.67 MB
Tendernotice_3.pdf
PDF • 0.12 MB
BOQ_1423067.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .