Tender Value
₹48.2 L
EMD Value
₹49,000
Closing Date
28 Feb 2020, 3:00 pmClosed
The Project Director
The Project Director DRDA, Vellore
Renovation of 8 no of Ponds Ooranies,Kulam Kuttai in Katpadi, sholinghur Block of Vellore District under Renovation of Rural Water Bodies SFC Grant 2019-20 Package no -13
2020_RDTN_158121_1
A9/3844/2020
Open Tender
Civil Works - Others
Item Rate
180 days
DRDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹49,000
11 Apr 2020
17 Feb 2020
28 Feb 2020
17 Feb 2020
28 Feb 2020
17 Feb 2020
Amount
1. Improvements to Panathoppu Kulam No 332 in Eranthangal Panchayat
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Sub estimate for bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying of Sand filling including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Providing and laying of interlocking in paver block 60mm thinkness including cost and conveyance of all materials to work site and all labour charges etc.complete
2. Improvements to Nallathaneer Kulam No 191 in Eranthangal Panchayat
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Sub estimate for bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying of Sand filling including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Providing and laying of interlocking in paver block 60mm thinkness including cost and conveyance of all materials to work site and all labour charges etc.complete
3. Improvements to Sudukadu Kulam No57 in Eranthangal Panchayat
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Sub estimate for bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying of Sand filling including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Providing and laying of interlocking in paver block 60mm thinkness including cost and conveyance of all materials to work site and all labour charges etc.complete
4. Improvements to Anai Kullam No 362 in Kandipedu Panchayat
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Sub estimate for bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying of Sand filling including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Providing and laying of interlocking in paver block 60mm thinkness including cost and conveyance of all materials to work site and all labour charges etc.complete
5.Improvements to Pachai Kullam No 421in Kandipedu Panchayat
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Sub estimate for bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying of Sand filling including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and fabrication of steel including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
RCC 1:1.5:3 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Providing and laying of interlocking in paver block 60mm thinkness including cost and conveyance of all materials to work site and all labour charges etc.complete
6. Improvements to Reddy Kullam No 145/1 in Kandipedu Panchayat
Clearing Light Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc., complete.
Earth work in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete.
Sub estimate for bathing ghats & baby pond
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying of Sand filling including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Providing and laying of interlocking in paver block 60mm thinkness including cost and conveyance of all materials to work site and all labour charges etc.complete
7. Rejuvenation of Kalchetti Kulam at Melpadi village in Sholinghur block.
Clearing the scrub jungle, juliflora jungle and depositing of the same as directed by the engineer incharge of works and as per technical specification
Earthwork excation in all soil except hard rock requiring blasting and conveyeing and formation of bund with 0-100 m deploying earthmoving machineries and tippers including benching formation of bunds, breaking clods sectioning, labour and hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete.
Construction of Retaining wall for Baby pond
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
8. Rejuvenation of Throwpathiamman Kulam at Thengal village in Sholinghur block.
Clearing the scrub jungle, juliflora jungle and depositing of the same as directed by the engineer incharge of works and as per technical specification
Earthwork excation in all soil except hard rock requiring blasting and conveyeing and formation of bund with 0-100 m deploying earthmoving machineries and tippers including benching formation of bunds, breaking clods sectioning, labour and hire charges for closing breaches for extra watering and consolidation by power roller including hire charges etc complete.
Construction of Retaining wall for Baby pond
Earth work excavation and depositing on bank with initial lead and lift in all type of soil etc complete as per SS 20B for narrow foundation
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
Supplying and erecting centering shuttering with necessary supports including cost and conveyance and all labour charges etc
Cement concrete 1:3:6 mix using 40mm metal including cost and conveyance of all materials to work site and all labour charges etc
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Thirumalai Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .