Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹46.4 LAccepted-Finance R O VILLAGE P O BAKRAS TEHSIL SHILLAI DISTT SIRMOUR HP | 1 | Accepted-Finance Accpt | |
| 2 | 2₹49.3 L+₹2.8 L (6.12%)Accepted-Finance | 2 | Accepted-Finance Being a 2 lowest |
Tender Value
₹17.9 L
EMD Value
₹34,365
Closing Date
6 Oct 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Chenab Valley Division HP PWD Udipur
EE Chenab Valley Division HP PWD Udipur
C O 30 48 mtr span motorable bridge between salpat
2020_PWD_40940_1
C/O 30.48 mtr. span Motorable bridge
Open Tender
Civil Works
Item Rate
180 days
Udiapur
C O Sub structure salpat I side abutment
5 documents required · 5 mandatory
₹500
Yes
EE Chenab Valley Division HP PWD Udipur
₹34,365
Yes
19 Oct 2020
22 Sept 2020
7 Oct 2020
22 Sept 2020
6 Oct 2020
22 Sept 2020
120 days
Amount
Earth work in excavation for structures i.e in foundation & trenches etc. as per drawing and technical specification clause No. 305.1 in all kinds of soil such as pick, jumper, blasting work by blasting or chiseling or any other intermediate classification of soil in dry or saturated condition in all leads & lifts including timbering or trenches shoring bracing and strutting dewatering pumping or bailing out water caused by rains springs, sub-soil water canal or river seepage etc. as may be necessary stacking the excavated serviceable and unserviceable material separately as directed by the Engineer-in-charge and then returning the stacked soil in fifteen centimeters, layer when required in to plinth and sides of foundation etc. when required in to plinth and sides of foundation etc. consolidation each deposited layer by ramming watering and then disposing of all surplus unserviceable material as per the direction of all surplus unserviceable material as per the direction of the Engineer-in-charge with in all leads and lifts disposed material to be leveled and neatly dressed) including carriage of material in all leads and lifts & as per the direction of Engineer-in-Charge.
P.C.C 1:3:6 (Plain cement concrete 1:3:6 nominal size) in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing 14 days. including carriage of material in all leads and lifts & as per the direction of Engineer-in-Charge.
Plain/reinforced cement concrete in sub-structure complete as per drawing and technical specifications Grade M- 20 (1:2:4) (One Cement: 2Sand: 4 graded stone aggregate) using concrete mixture upto 5.00mtr. height including carriage of material in all leads and lifts & as per the direction of Engineer-in-Charge.
Plain/reinforced cement concrete in sub-structure complete as per drawing and technical specifications Grade M- 20 (1:2:4) (One Cement: 2Sand: 4 graded stone aggregate) using concrete mixture upto 5.00mtr. to 10.00mtr. height including carriage of material in all leads and lifts & as per the direction of Engineer-in-Charge.
Plain/reinforced cement concrete in sub-structure complete as per drawing and technical specifications Grade M- 20 (1:2:4) (One Cement: 2Sand: 4 graded stone aggregate) using concrete mixture Beyond 10.00 mtr. including carriage of material in all leads and lifts & as per the direction of Engineer-in-Charge.
Supplying, fitting and placing HYSD bar reinforcement complete in sub-structure as per drawing and technical specifications including carriage of material in all leads and lifts & as per the direction of Engineer-in-Charge.
Providing and laying filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MORTH specifications to a thickness of not less than 600mm ( Six hundred milimetre ) with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification including carriage of material in all leads and lifts & as per the direction of Engineer-in-Charge.
Reinforced cement concrete in approach slab including reinforcement and form work complete as per drawing and technical specification. including carriage of material in all leads and lifts & as per the direction of Engineer-in-Charge.
PCC M- 15 (Fifteen) Grade leveling course below approach slab complete as per drawing and technical specification including carriage of material in all leads and lifts & as per the direction of Engineer-in-Charge.
PREM JEET
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .