Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.2 LAccepted-Finance H NO 2128 BH SATOSKAR BUILDING DESSAI NAGAR SANQUELIM BICHOLIM GOA | NORTH GOA | GOA | 403001 | ₹18.2 L | L1 | Accepted-Finance being 1st lowest |
| 2 | L2₹18.5 L+₹35,113.02 (1.93%)Rejected-Finance H NO 71 85 B1 WARD NO 7 NR AGRICULTURE OFFICE VALPOI SATTARI GOA | ₹18.5 L+₹35,113.02 (1.93%) | L2 | Rejected-Finance being 2nd lowest |
Tender Value
₹17.6 L
EMD Value
₹35,289
Closing Date
10 Jul 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
DIVISION XVI (BLDGS), P.W.D.
Repairs and Renovation, Upgradation of Ladies and Gents Toilet Block at Dormitory No.1 at Eco-Tourism Site at Bondla.
2026_PWD_30085_1
PWD/DIVISION XVI (BC)/TS/04/2026-2027 Line 04
Open Tender
Civil Works - Buildings
Percentage
180 days
Bondla
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹35,289
11 Aug 2026
4 Jul 2026
13 Jul 2026
4 Jul 2026
10 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling G.I. sheets roofing including ridges, hips valleys and gutters etc. and stacking the material within 50 meters lead. | 63.7 | sq.m | 78 | ₹4,968.6 |
| 2 | Demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. | 3.2 | cu.m | 1,136 | ₹3,635.2 |
| 3 | Dismantling doors, windows and clearestory windows (steel or wood) shutters including chowkhats architrave holdfast etc. complete and staking within 50 mt. Lead a) Of area 3 sq.m. and below | 10 | each | 206 | ₹2,060 |
| 4 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 mts. lead. | 14.3 | sq.m | 27 | ₹386.1 |
| 5 | Removing white or colour wash by scrapping, sand papering and preparing surface smooth including necessary repairs to scratches etc. complete. | 90.7 | sq.m | 19 | ₹1,723.3 |
| 6 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. | 187.8 | sq.m | 330 | ₹61,974 |
| 7 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a) All kinds of soil | 27.6 | cu.m | 291 | ₹8,031.6 |
| 8 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 3.25 | cu.m | 2,211 | ₹7,185.75 |
| 9 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level | 5.4 | cu.m | 6,810 | ₹36,774 |
| 10 | Laterite masonry in neatly dressed stones of size as specified in cement mortar 1: 4 (1 cement : 4 coarse sand) in foundation and basement. | 10.2 | cu.m | 5,186 | ₹52,897.2 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_30499.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .