Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.6 LAccepted-AOC VILLAGE POST PATHOLI AGRA UTTAR PRADESH INDIA | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹36.9 L+₹3.3 L (9.81%)Rejected-Finance 34 35 ASHOKA ESTATE NEAR S S PUBLIC SCHOOL SEWLA SARAI AGRA 282001 | AGRA | UTTAR PRADESH | 282001 | L2 | Rejected-Finance Being other than L1 | |
| 3 | L3₹38.5 L+₹4.8 L (14.4%)Rejected-Finance | L3 | Rejected-Finance Being other than L1 | |
| 4 | L4₹41.0 L+₹7.4 L (21.9%)Rejected-Finance 40 6 UKHARA PO PRATAP PURA AGRA UP 282001 | AGRA | AGRA | UP | 282001 | L4 | Rejected-Finance Being other than L1 | |
| 5 | L5₹43.3 L+₹9.7 L (28.8%)Rejected-Finance | L5 | Rejected-Finance Being other than L1 |
| Sl No | Description | Qty | Unit | Attar Singh and Sons L4 | R.S BUILDERS L6 | M/S SHARADA ASOCIATE L2 | C P Singh and Co L1 | M/S RADHEY GOVIND ENTERPRISES L7 | M/S APOORVA CONSTRUCTION L8 | RAJEEV CONSTRUCTION L3 | CREATIVE CONSTRUCTION L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down of all loose and de-bonded concrete/ screed, loose particles, dirt etc & Debris should be removed from Bldg. Roof substrate must be pressure-washed with water with, a minimum working pressure of 1,400 PSI is to be used to and/or remove all dirt, dust, chalking and waste products, remove algae, mold by using bleach solution or biowash etc complete all as specified & directed. | 3,310 | Sqm | 10 ₹33,100 Lowest | 35 ₹1,15,850 | 50 ₹1,65,500 | 50 ₹1,65,500 | 51 ₹1,68,810 | 30 ₹99,300 | 20 ₹66,200 | 20 ₹66,200 |
| 2.00 | M&L for repair of all visible hairline cracks on concrete roof / screed more than 0.50 mm and not giving hollow sound, should be cut and widen in V shape with mechanical cutter in the size (10mm W x 6mm D). Fill cracks with PU sealant / Hybrid Sealant with suitable gun and smoothed with a putty knife or trowel. Allow sealant to cure a minimum (72 Hrs.) 3 days etc complete all as specified & directed. | 331 | RM | 70 ₹23,170 | 240 ₹79,440 | 270 ₹89,370 | 100 ₹33,100 | 310 ₹1,02,610 | 100 ₹33,100 | 200 ₹66,200 | 50 ₹16,550 Lowest |
| 3.00 | M&L for remove loose and damaged concrete roof screed in pockets with mechanical cutter. Clean the concrete screed with high pressure water jet to remove dirt and loose particles. Brush apply a bond coat of Pidicrete URP mix in the ratio of 1:1 (URP 1: Cement 1) by volume to make it lump free slurry when applied on in the pre wet surface complete all as specified and directed. | 3,310 | Sqm | 220 ₹7,28,200 | 120 ₹3,97,200 | 150 ₹4,96,500 | 150 ₹4,96,500 | 100 ₹3,31,000 | 70 ₹2,31,700 Lowest | 100 ₹3,31,000 | 140 ₹4,63,400 |
| 4.00 | M&L for laid to fall roof screed in correct slope and gradient, mix with water proofing chemical 0.5 ltr kg per 50 kg of cement in (M20) concrete in ratio of 1:1.5:3 i.e., one bag of 50kg cements: 1.5 times volume of sand: 3 times volume of aggregates: 25L water. Level the repair mortar and finish with trowel. Moist cure should be done for 7days. Air cure screed for 7days, before application of roof top coat coating system etc complete all as specified & directed. | 3,310 | Sqm | 320 ₹10,59,200 | 340 ₹11,25,400 | 150 ₹4,96,500 Lowest | 200 ₹6,62,000 | 330 ₹10,92,300 | 300 ₹9,93,000 | 200 ₹6,62,000 | 150 ₹4,96,500 Lowest |
| 5.00 | M&L apply one coat of Cipoxy 16D primer in the ratio 1:1 spreading at the rate of 0.200 kg-0.250 kg /sqm in complete dry condition where moisture contain below 7% (should be checked with moisture meter)Allow the primer coat to dry for 6 to 8 hours. Apply 1st coat of Roofseal Classic without dilution spreading at the rate of 0.70/litre/Sq.mt/Coat until all surface is covered. Lay a 45 GSM Fibre glass mesh as a reinforcing material which is incorporated in the coating when the first coat is still in wet condition. Allow the first coat to dry for approximately 4 to 6 hours. Apply the second of chemical with the same application coverage, but in a direction perpendicular to that of the first and second coats. Allow each coat to air cure for a minimum of 4-6 hours after application. Check to see no void surface is left untreated / uncoated.Allow the system to air cure for 7 days minimum etc complete all as specified & directed. | 3,310 | Sqm | 400 ₹13,24,000 Lowest | 490 ₹16,21,900 | 500 ₹16,55,000 | 400 ₹13,24,000 Lowest | 600 ₹19,86,000 | 650 ₹21,51,500 | 600 ₹19,86,000 | 800 ₹26,48,000 |
| 6.00 | Demolition of brick work or stone masonry including all quoins,arches,pillars etc built in CM complete all as specified & directed. | 3 | Cum | 300 ₹900 | 300 ₹900 | 500 ₹1,500 | 150 ₹450 Lowest | 700 ₹2,100 | 200 ₹600 | 500 ₹1,500 | 150 ₹450 Lowest |
| 7.00 | M&L for brickwork with subclass ‘B’ bricks, straight or curved on plan exc 6m mean radius built in CM 1:6 complete all as specified & directed. | 3 | Cum | 4,800 ₹14,400 | 4,500 ₹13,500 | 4,000 ₹12,000 Lowest | 4,200 ₹12,600 | 5,000 ₹15,000 | 4,500 ₹13,500 | 4,000 ₹12,000 Lowest | 4,500 ₹13,500 |
| 8.00 | Taking down cement plaster on wall/ceiling/roof etc including raking out joints, hacking for key scrubbing down with water etc complete all as specified and as directed. | 1,400 | Sqm | 10 ₹14,000 Lowest | 30 ₹42,000 | 50 ₹70,000 | 20 ₹28,000 | 50 ₹70,000 | 30 ₹42,000 | 25 ₹35,000 | 15 ₹21,000 |
| 9.00 | M&L for 15mm thick smart care ready mix plaster in specially designed ready to use cement base plaster with high quality polymer additives and well graded sand and fillers which can be used for external plastering over bricks, block, stone walls as well as concrete surfaces finished even and smooth without using extra cement upto 11mtr height and providing necessary scaffolding, safety precautions and other requisite arrangements complete all as specified and directed. | 1,400 | Sqm | 450 ₹6,30,000 | 463 ₹6,48,200 | 290 ₹4,06,000 | 290 ₹4,06,000 | 300 ₹4,20,000 | 650 ₹9,10,000 | 300 ₹4,20,000 | 250 ₹3,50,000 Lowest |
| 10.00 | M & L for two coat of cement base paint on new plastered surfaces of wall including preparation of surfaces complete all as specified and directed. | 1,400 | Sqm | 30 ₹42,000 Lowest | 60 ₹84,000 | 60 ₹84,000 | 30 ₹42,000 Lowest | 65 ₹91,000 | 60 ₹84,000 | 45 ₹63,000 | 60 ₹84,000 |
Tender Value
₹46.6 L
EMD Value
₹93,200
Closing Date
30 Sept 2025, 6:00 pmClosed
GE (East) Agra
Garrison Engineer (East) Agra, Military Engineer Services, Gwalior House, 62 Taj Road Agra Cantt-282001
SPL REPAIR TO ROOF TREATMENT ONLY IN BLDG NO P-1, P-2, P-11 TO P-13, P-31 AND P-46 AT 411(I) PARA FD COY UNDER GE (EAST) AGRA
2025_MES_726341_1
9824/E8
Open Tender
Civil Works
Item Rate
180 days
Agra Cantt
Please refer tender documents
10 documents required · 10 mandatory
₹500
GE (East) Agra
₹93,200
Yes
26 Nov 2025
9 Sept 2025
3 Oct 2025
9 Sept 2025
30 Sept 2025
23 Sept 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .