Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹18.0 LAdmitted-Finance | -39.99% | ₹18.0 L | L1 | Admitted-Finance |
| 2 | L2₹18.6 L+₹59,999.78 (3.33%)Admitted-Finance | -37.99% | ₹18.6 L+₹59,999.78 (3.33%) | L2 | Admitted-Finance |
| 3 | L3₹19.2 L+₹1.2 L (6.47%)Admitted-Finance | -36.11% | ₹19.2 L+₹1.2 L (6.47%) | L3 | Admitted-Finance |
| 4 | L4₹19.5 L+₹1.5 L (8.15%)Admitted-Finance | -35.10% | ₹19.5 L+₹1.5 L (8.15%) | L4 | Admitted-Finance |
| 5 | L5₹19.8 L+₹1.8 L (10.00%)Admitted-Finance | -33.99% | ₹19.8 L+₹1.8 L (10.00%) | L5 | Admitted-Finance |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
25 Jun 2026, 4:00 pmClosed
Executive Engineer JKTDC
TRC Srinagar
Construction of front side retaining wall with landscaping and fencing at T.E. Verinag.
2026_Tourm_312391_1
ENIT No. 4 of 2026-27
Open Tender
Civil Works
Percentage
360 days
Srinagar
Construction of front side retaining wall with landscaping and fencing at T.E. Verinag.
3 documents required · 3 mandatory
₹3,000
FA and CAO JKTDC
₹60,000
3 Jul 2026
13 Jun 2026
27 Jun 2026
14 Jun 2026
25 Jun 2026
14 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Demolishing/Dismantling | |||||
| 1.01 | Dismantling of stone work manually /by mechanical means i/c styacking of serviceable material and disposal of unserviceable complete job. | 70 | cum | 1,011 | ₹70,770 |
| 1.02 | Engagement of plumber for carrying various jobs at site sub to actual during execution . | 2 | Nos | 900 | ₹1,800 |
| 1.03 | Engagement of carpenter for carrying various jobs at site sub to actual during execution . | 5 | Nos | 900 | ₹4,500 |
| 1.04 | Engagement of labours for carrying various jobs at site (sub to act during execution) | 20 | Nos | 750 | ₹15,000 |
| 2Earth work | |||||
| 2.01 | Earth work in excavationby mannual means in foundation trenches,drains pipes,cables, trenches , lift up to 3m including getting out the excavated soil and disposal of surplus excavated soil as directed, in all kinds of soils with 25 mtr lead from cutting edge. | 20 | cum | 600 | ₹12,000 |
| 2.02 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming & watering, lead up to 50 m and lift upto 1.5 m. | 16 | cum | 198.7 | ₹3,179.2 |
| 2.03 | Supplying ,providing & filling with RBM/Khak bajri / stones in trenches, plinth ,sides of foundations, paths etc.in layers not exceeding 20 cm in depth,consolidating each deposited layer by ramming & watering . | 15 | cum | 1,100 | ₹16,500 |
| 3Concrete Work | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.06 MB
BOQ_1011111.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .