| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹43.8 L+₹11.6 L (36.0%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical NEW DELHI | - | Rejected-Technical Technicaly disqualified | |
| 4 | Rejected-Technical | - | Rejected-Technical Technicaly disqualified |
| Sl No | Description | Qty | Unit | M/S B.K ASSOCIATES L2 | Madheshiya Marines L1 |
|---|---|---|---|---|---|
| 1.00FJB-II | |||||
| 1.01 | Cropping & renewal of damaged checker plate, deck plates , side plates ,inside manhole along with other fitment to be done with existing thickness of the plate and inspection of all tanks for damaged platings same to be replaced with existing thickness of the plate as required as per direction EIC/ Surveyor. | 500 | KG | 80 ₹40,000 Lowest | 140 ₹70,000 |
| 2.00 | All tank air vent flap and 05 nos. tank air vent pipe missing/ damaged the same has to be rectified/restored as required as per direction of EIC/Surveyor. | 1 | Comp. Job | 30,000 ₹30,000 | 10,000 ₹10,000 Lowest |
| 3.00(i) All tank manhole cover rubber found hardend and damaged, the same has to be replace. (ii) Nut bolts to renew with S.S. as required as per direction of EIC/Surveyor. | |||||
| 3.01 | Labour Charges | 1 | Comp. Job | 1,50,000 ₹1,50,000 | 10,000 ₹10,000 Lowest |
| 3.02Cost of spares/material(Actual +10%) | |||||
| 4.00(i) Servicing of both side (forward and aft) anchor windlass (ii) Chain cable found rusted/ jammed and nonoperational, the same to be rectify (iii) Fwd anchor windlass chain cable found not connected with anchor same to be make operational/ connected as required as per direction of EIC/ Surveyor. | |||||
| 4.01 | Labour Charges | 1 | Comp. Job | 50,000 ₹50,000 Lowest | 50,000 ₹50,000 Lowest |
| 4.02Cost of spares/material(Actual +10%) | |||||
| 5.00 | Manufacturing of 10 nos hook support to tie up truck tyre fender on both side of deck and installation of 10 nos truck tyre fender along with bull dog clamp and wire rope as required as per direction of EIC/Surveyor. | 10 | Comp. Job | 5,000 ₹50,000 | 800 ₹8,000 Lowest |
Tender Value
₹42.5 L
EMD Value
₹85,000
Closing Date
29 Aug 2025, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Director
IWAI, Pandu Port Complex, Pandu, Guwahati
Annual Afloat Repair of FJB-II, IX, XI, FJB-XIII, CPB-V for the year 2025-26
2025_IWAI_872373_1
IWAI/GHY/FJB-II/4(24)/2025-26
Open Tender
Marine Works
Works
45 days
Guwahati (NW-2)
As per tender document
2 documents required · 2 mandatory
₹5,900
Yes
IWAI FUND PLAN
₹85,000
Yes
20 Sept 2025
7 Aug 2025
30 Aug 2025
8 Aug 2025
29 Aug 2025
8 Aug 2025
Amount
FJB-II
Cropping & renewal of damaged checker plate, deck plates , side plates ,inside manhole along with other fitment to be done with existing thickness of the plate and inspection of all tanks for damaged platings same to be replaced with existing thickness of the plate as required as per direction EIC/ Surveyor.
All tank air vent flap and 05 nos. tank air vent pipe missing/ damaged the same has to be rectified/restored as required as per direction of EIC/Surveyor.
(i) All tank manhole cover rubber found hardend and damaged, the same has to be replace. (ii) Nut bolts to renew with S.S. as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
(i) Servicing of both side (forward and aft) anchor windlass (ii) Chain cable found rusted/ jammed and nonoperational, the same to be rectify (iii) Fwd anchor windlass chain cable found not connected with anchor same to be make operational/ connected as required as per direction of EIC/ Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Manufacturing of 10 nos hook support to tie up truck tyre fender on both side of deck and installation of 10 nos truck tyre fender along with bull dog clamp and wire rope as required as per direction of EIC/Surveyor.
Servicing of Two (2) hand operated winches with davit to operate requisite load with renewal of wire rope and checking of pulley as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Checking of entire solar system and requisite items should be rectified/renewed and upgraded as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Works as per site and crew requirement :- Construction of Canopy (12 m x 5.5 m) along with all necessary arrangement including labor charges as per following requirement 1. Steel Post (3 x 2.5) -.4Pcs 2.Steel Post ( 3 x 3 ) - 4 Pcs 3.Purline ( 1.5 x 1 .5) - 32 Pcs 4.Roofing Sheet - LS 5.Other Fittings and accessories,(color etc.)as required as per direction of EIC/surveyor.
Installation of attach bathroom cum toilet with proper drainage/discharge system, overhead tank, pipe line connection, commode, wash basin, tap, shower, flush tank, door, latch, valves, flushing tank pipe, mirror, towel rod, hook hanger, soap stand, water jet, discharge strainer and fitments etc by plate cutting and welding as required as per direction of EIC/Surveyor.
(i) Repairing of crew accomodation window and partition tin and other fitment as per direction of EIC/ Surveyor. (ii) Necessary carpentry, repairing, curtain & upkeeping works to be done in window, bed, cooking table, bench, and rake etc at accommodation cabin as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Chipping, wire brushing and cleaning inside of tanks and space with all interior item like angle & frame etc. to be done with one coat of primer followed by two coats of existing color anti- corrosive marine, as required as per direction of EIC /Surveyor
Installation of tailpost (solid long rod) with proper corrosion paint and handles for stability of pontoon or to avoid grounding as required as per direction of EIC/Surveyor.
FJB-IX
Cropping & renewal of damaged checker plate, deck plates, side plates, side fenders, inside manhole along with other fitment to be done with existing thickness of the plate and inspection of all tanks for damaged platings same to be replaced with existing thickness of the plate as required as per direction EIC/ Surveyor.
All tank (5 nos.) air vent flap and 02 nos. tank air vent pipe missing/ damaged the same has to be rectified/restored as required as per direction of EIC/Surveyor.
Servicing of both side (forward and aft) anchor windlass as per direction of EIC/ Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Manufacturing of 10 nos hook support to tie up truck tyre fender on both side of deck and installation of 10 nos truck tyre fender along with bull dog clamp and wire rope as required as per direction of EIC/Surveyor.
Servicing of Two (2) hand operated davit to operate requisite load with renewal of wire rope and checking of pulley as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Works as per site and crew requirement :- i) Interior of the crew cabin needed to be insulated to restrain transfer of excessive heat during summer with materials like i) Particle board (8'x4')- 14 nos., ii) Glass wool (2" thk)- 1no., iii) Door-1no., iv) Chicken net- 1 roll, v) Mosquito net (35 sqft)-1no., vi) Wood - (3"x1") - 6' - 3nos. vii) Wood(2"x1")= 7'-20nos., 10'-10nos., 13'- 10 nos., 3'-14nos. viii) Wood-(2"x2")- 9'- 2nos. ix) Wood-(3"x2.5") - 6'- 2nos., 2.5' - 2nos. x) Wood Corner Bead - (1.5"x1.5")- 50 feet, xi) Wood Liping Bead- (1.5"x1/4") - 50 feet, xii) Plywood 12mm (7'x3')- 2nos. xiii) Necessary carpentry, repairing, curtain & upkeeping works to be done in window, bed, cooking table, bench, and rake etc at accommodation cabin as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Installation of attach bathroom cum toilet with proper drainage/discharge system, overhead tank, pipe line connection, commode, wash basin, tap, shower, flush tank, door, latch, valves, flushing tank pipe, mirror, towel rod, hook hanger, soap stand, water jet, discharge strainer and fitments etc by plate cutting and welding as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Chipping, wire brushing and cleaning inside of tanks and space with all interior item like angle & frame etc. to be done with one coat of primer followed by two coats of existing color anti- corrosive marine, as required as per direction of EIC /Surveyor
FJB-XI
Cropping & renewal of damaged checker plate, deck plates, side plates, side fenders, inside manhole along with other fitment to be done with existing thickness of the plate and inspection of all tanks for damaged platings same to be replaced with existing thickness of the plate as required as per direction EIC/ Surveyor.
All tank (5 nos.) air vent flap and 5 nos. tank air vent pipe missing/ damaged the same has to be rectified/restored as required as per direction of EIC/Surveyor.
(i) All tank manhole cover rubber found hardend and damaged, the same has to be replace. (ii) Nut bolts to renew with S.S. as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
(i) Servicing of both side (forward and aft) anchor windlass (ii) Chain cable found rusted/ jammed and nonoperational, the same to be rectify and make operational as per direction of EIC/ Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Manufacturing of 10 nos hook support to tie up truck tyre fender on both side of deck and installation of 10 nos truck tyre fender along with bull dog clamp and wire rope as required as per direction of EIC/Surveyor.
Servicing of Two (2) hand operated davit to operate requisite load with renewal of wire rope and checking of pulley as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material(Actual +10%)
Works as per site and crew requirement :- i) Interior of the crew cabin needed to be insulated to restrain transfer of excessive heat during summer with materials like i) Particle board(8'x4')- 14 nos., ii) Glass wool (2" thk)- 1no., iii) Door-1no., iv) Chicken net- 1 roll, v) Mosquito net (35 sqft)-1no., vi) Wood - (3"x1") - 6' - 3nos. vii) Wood(2"x1")= 7'-20nos., 10'-10nos., 13'- 10nos., 3'-14nos. viii) Wood-(2"x2")- 9'- 2nos. ix) Wood-(3"x2.5") - 6'- 2nos., 2.5' - 2nos. x) Wood Corner Bead - (1.5"x1.5")- 50 feet, xi) Wood Liping Bead- (1.5"x1/4") - 50 feet, xii) Plywood 12mm(7'x3')- 2nos. xiii) Necessary carpentry, repairing, curtain & upkeeping works to be done in window, bed, cooking table, bench, and rake etc at accommodation cabin as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Construction of Canopy (12 m x 5.5 m) along with all necessary arrangement including labor charges as per following requirement 1. Steel Post (3 x 2.5) -.4Pcs 2.Steel Post ( 3 x 3 ) - 4 Pcs 3.Purline ( 1.5 x 1 .5) - 32 Pcs 4.Roofing Sheet - LS 5.Other Fittings and accessories,(color etc.)as required as per direction of EIC/surveyor.
Installation of attach bathroom cum toilet with proper drainage/discharge system, overhead tank, pipe line connection, commode, wash basin, tap, shower, flush tank, door, latch, valves, flushing tank pipe, mirror, towel rod, hook hanger, soap stand, water jet, discharge strainer and fitments etc by plate cutting and welding as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Chipping, wire brushing and cleaning inside of tanks and space with all interior item like angle & frame etc. to be done with one coat of primer followed by two coats of existing color anti- corrosive marine, as required as per direction of EIC /Surveyor.
FJB-XIII
Cropping & renewal of damaged checker plate, deck plates , side plates, side fenders, inside manhole along with other fitment to be done with existing thickness of the plate and inspection of all tanks for damaged platings same to be replaced with existing thickness of the plate as required as per direction EIC/ Surveyor.
All tank air vent flap and 11 nos. tank air vent pipe missing/ damaged the same has to be rectified/restored as required as per direction of EIC/Surveyor.
(i) Servicing of both side (forward and aft) anchor windlass (ii) Chain cable found rusted/ jammed and nonoperational, the same to be rectify and make operational as per direction of EIC/ Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Manufacturing of 10 nos hook support to tie up truck tyre fender on both side of deck and installation of 10 nos truck tyre fender along with bull dog clamp and wire rope as required as per direction of EIC/Surveyor.
(i) Servicing of both side (forward and aft) anchor windlass (ii) Chain cable found rusted/ jammed and nonoperational, the same to be rectify and make operational as per direction of EIC/ Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Works as per site and crew requirement :- Installation of attach bathroom cum toilet with proper drainage/discharge system, overhead tank, pipe line connection, commode, wash basin, tap, shower, flush tank, door, latch, valves, flushing tank pipe, mirror, towel rod, hook hanger, soap stand, water jet, discharge strainer and fitments etc by plate cutting and welding as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
i) Interior of the crew cabin needed to be insulated to restrain transfer of excessive heat during summer with materials like i) Particle board(8'x4')- 14 nos., ii) Glass wool (2" thk)- 1no., iii) Door-1no., iv) Chicken net- 1 roll, v) Mosquito net (35 sqft)-1no., vi) Wood - (3"x1") - 6' - 3nos. vii) Wood(2"x1")= 7'-20nos., 10'-10nos., 13'- 10nos., 3'-14nos. viii) Wood-(2"x2")- 9'- 2nos. ix) Wood-(3"x2.5") - 6'- 2nos., 2.5' - 2nos. x) Wood Corner Bead - (1.5"x1.5")- 50 feet, xi) Wood Liping Bead- (1.5"x1/4") - 50 feet, xii) Plywood 12mm (7'x3')- 2nos. xiii) Bathroom door is broken same to be repaired. xiv) Necessary carpentry, repairing, curtain & upkeeping works to be done in window, bed, cooking table, bench, and rake etc at accommodation cabin as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Construction of Canopy (12 m x 5.5 m) along with all necessary arrangement including labor charges as per following requirement 1. Steel Post (3 x 2.5) -.4Pcs 2. Steel Post ( 3 x 3 ) - 4 Pcs 3. Purline ( 1.5 x 1 .5) - 32 Pcs 4. Roofing Sheet - LS 5. Other Fittings and accessories,(color etc.)as required as per direction of EIC/surveyor.
Chipping, wire brushing and cleaning inside of tanks and space with all interior item like angle & frame etc. to be done with one coat of primer followed by two coats of existing color anti- corrosive marine, as required as per direction of EIC /Surveyor.
Seventeen(17) nos. manhole gaskets has damaged and perished; the same has to be renewed with reputed "make in India" material of requisite thickness as required as per direction of EIC/Surveyor.
Servicing of both side hand operated anchor windlass (forward and aft) with repair/renewal of ferule and PB Bush for smooth movement of gear as required. Checking & repair of driving gear unit including calibration & painting of chains as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Servicing of Two (2) hand operated winches with davit to operate requisite load as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Air vents closing plate gaskets to be renewed with reputed "make in India" material and reqisite thickness as required as per direction of EIC/Surveyor.
Two nos. hand operated pump to be serviced/renewed with repairing of supporting angles etc to make fully operational in all respect as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Deck crane foundation bracket and flange found bent the same has to be rectified by plate cutting, renewal and welding etc. as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Forward side P&S two location deck plate found with holes and dent; the same has to be cropped and renewed with minimum of 300 mm x 300 mm plate as required as per direction of surveyor/EIC.
Construction of Canopy (12 m x 5.5 m) along with all necessary arrangement including labor charges as per following requirement 1. Steel Post (3 x 2.5) -.4Pcs 2.Steel Post ( 3 x 3 ) - 4 Pcs 3.Purline ( 1.5 x 1 .5) - 32 Pcs 4.Roofing Sheet - LS 5.Other Fittings and accessories,(color etc.)as required as per direction of EIC/surveyor.
Works as per site and crew requirement :- Chipping, wire brushing and cleaning inside of all man hole/ bulkhead tank with all interior item like angle & frame etc. to be done with one coat of zinc chromate yellow primer followed by two coats of existing colour anti corossive marine standard paints, as required as per direction of EIC.
Spray paint of entire crane apparatus and it's part like boom, inside/outside of operation room, rotation column etc after chipping, wire brushing, cleaning and primer coat. Safety instructions and deptt. logo on operator's cabin should be make with fluorescent sticker as required as per direction of EIC.
Renewal of nut-bolts ( M16 x 40 L ) and washers with S.S. in all manholes as required as per direction of EIC.
Labour Charges
Cost of spares/material(Actual +10%)
Installation of truck tyres fender with bull dog clamp and wire rope as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Checking of entire solar system and requisite items should be rectified/renewed and upgraded as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
Necessary carpentry, repairing, curtain & upkeeping works to be done in window, bed, cooking table, bench, thelpost, crane operator chair and rake etc at accommodation cabin & operator cabin as required as per direction of EIC/Surveyor.
Labour Charges
Cost of spares/material (Actual +10%)
M/S B.K ASSOCIATES (BID ID -3274307)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .