Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.5 LAccepted-AOC | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹25.7 L+₹24,715 (0.97%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN LOWEST BIDDER | |
| 3 | L3₹28.8 L+₹3.3 L (13.0%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN LOWEST BIDDER | |
| 4 | L4₹35.1 L+₹9.6 L (37.8%)Rejected-Finance | L4 | Rejected-Finance OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | MS MOHD RIZWAN KHAN L3 | PADAMSHRI CONSTRUCTION CO L1 | SHIV SHANKAR MISHRA L4 | JYOTI ENTERPRISES L2 |
|---|---|---|---|---|---|---|---|
| 1.00The following precautionary measures shall be ensured by the contractor before and during execution of the work :- (a) The tenderer is instructed to keep in mind while quoting their rates that all the painting procedure to be followed under the scope of work. (b) Contractor shall deposit entire quantity of material in two phases (i.e. 50% in EACH phase) in sealed containers required for painting works covered in this contract under the custody of Engineer-In-Charge/ Office in charge of unit. (c) The materials as required shall be issued to contractor by JE/ Engineer-In-Charge on daily basis and the empty containers/ bags shall be deposited in the store of Engineer -In-Charge by the contractor, for verification as per standard consumption/ coverage prescribed by the manufacturers. (d) After completion of painting work contractor shall remove and clean all the droplets/stain of paint left on the floor, glasses & joinery using professional equipment’s and disinfect complete room as instructed by Engineer-In-Charge. The cost of the same is deemed to be included in tenderer's quoted rates. (e) Recovery @ cost of material shall be done from contractor if any material found lying on site after completion of work as per manufacturer's instruction and quality satisfaction of Engineer-In-Charge. (f) The work shall be executed upto 15 mtr height and cost of suitable scaffolding shall be deemed to be included in quoted rates by the tenderer. (g) OEM for this work will only be branded material manufacturing company i.e. Asian / Berger / Nerolac and all materials of similar make as approved by GE. | |||||||
| 1.10 | M&L for preparation of old decorated surfaces of wall including brooming, scraping down, smoke spot, moss, efflorescent salts, trading oil, grasy spots and stopping nails marks and one coat of white wash on walls complete all as specified and directed. | 5,500 | Sqm | 9 ₹49,500 | 9 ₹49,500 | 15 ₹82,500 | 4.5 ₹24,750 Lowest |
| 2.00 | M&L complete removal of old decorated surface of wall and applying two coats of oil emulsion distemper white/coloured over one coat of white cement based putty (where it is required) all as specified and directed.
Note : putty shall be measured and paid seperately. | 7,000 | Sqm | 38 ₹2,66,000 | 25 ₹1,75,000 Lowest | 50 ₹3,50,000 | 30 ₹2,10,000 |
| 3.00 | M&L for preparation of old decorated surfaces of wall including brooming , scraping down, smoke spot, moss, efflorescent salts, trading oil, grasy spots and stopping nails marks and one coat of oil emulsion distemper all as specified and directed. | 12,000 | Sqm | 26 ₹3,12,000 | 21 ₹2,52,000 | 30 ₹3,60,000 | 18 ₹2,16,000 Lowest |
| 4.00 | M&L for preparation of old decorated surface of wall including brooming, down, scrapping down smoke spot and stopping nails mark by filling white cement putty and applying one coat of coloured cement based paint all as specified. | 3,000 | Sqm | 21 ₹63,000 Lowest | 29 ₹87,000 | 30 ₹90,000 | 25 ₹75,000 |
| 5.00 | All as per item No. 4.00 here-in-bfore but on ceilings. | 1,000 | Sqm | 22 ₹22,000 | 29 ₹29,000 | 30 ₹30,000 | 20 ₹20,000 Lowest |
| 6.00 | M&L for preparing old plastered or unplastered surfaces of walls, removing unnecessary nails including filling of cracks/holes by crack filler and applying two coats cement based paint complete all as specified and directed. | 2,000 | Sqm | 60 ₹1,20,000 | 35 ₹70,000 Lowest | 40 ₹80,000 | 35 ₹70,000 Lowest |
| 7.00 | M&L for preparation of old painted surfaces of wood/wood based materials exc 10cm width or girth and applying one coat of synthetic enamel paint as directed and specified. | 1,000 | Sqm | 30 ₹30,000 Lowest | 40 ₹40,000 | 30 ₹30,000 Lowest | 45 ₹45,000 |
| 8.00 | All as per item No. 7.00 here-in-bfore but on steel surfaces. | 875 | Sqm | 28 ₹24,500 | 40 ₹35,000 | 25 ₹21,875 Lowest | 45 ₹39,375 |
| 9.00 | M&L complete removal of old decorated surface of wall and applying Two or more coats of 100% premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm white/coloured over and all as specified and directed. | 9,500 | Sqm | 42 ₹3,99,000 | 34 ₹3,23,000 Lowest | 70 ₹6,65,000 | 45 ₹4,27,500 |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
23 Feb 2026, 6:00 pmClosed
GE BHOPAL
GE BHOPAL BAIRAGARH BHOPAL
PERIODICAL SERVICES OF CERTAIN BLDGS AND COMPOUND WALLS AT SI LINES UNDER GE BHOPAL
2026_MES_750997_1
8515/E8
Open Tender
Civil Works
Item Rate
180 days
BHOPAL
Please refer tender documents
7 documents required · 7 mandatory
₹500
GE BHOPAL
₹90,000
Yes
15 May 2026
2 Feb 2026
25 Feb 2026
2 Feb 2026
23 Feb 2026
16 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1The following precautionary measures shall be ensured by the contractor before and during execution of the work :- (a) The tenderer is instructed to keep in mind while quoting their rates that all the painting procedure to be followed under the scope of work. (b) Contractor shall deposit entire quantity of material in two phases (i.e. 50% in EACH phase) in sealed containers required for painting works covered in this contract under the custody of Engineer-In-Charge/ Office in charge of unit. (c) The materials as required shall be issued to contractor by JE/ Engineer-In-Charge on daily basis and the empty containers/ bags shall be deposited in the store of Engineer -In-Charge by the contractor, for verification as per standard consumption/ coverage prescribed by the manufacturers. (d) After completion of painting work contractor shall remove and clean all the droplets/stain of paint left on the floor, glasses & joinery using professional equipment’s and disinfect complete room as instructed by Engineer-In-Charge. The cost of the same is deemed to be included in tenderer's quoted rates. (e) Recovery @ cost of material shall be done from contractor if any material found lying on site after completion of work as per manufacturer's instruction and quality satisfaction of Engineer-In-Charge. (f) The work shall be executed upto 15 mtr height and cost of suitable scaffolding shall be deemed to be included in quoted rates by the tenderer. (g) OEM for this work will only be branded material manufacturing company i.e. Asian / Berger / Nerolac and all materials of similar make as approved by GE. | |||||
| 1.1 | M&L for preparation of old decorated surfaces of wall including brooming, scraping down, smoke spot, moss, efflorescent salts, trading oil, grasy spots and stopping nails marks and one coat of white wash on walls complete all as specified and directed. | 5,500 | Sqm | - | - |
| 2 | M&L complete removal of old decorated surface of wall and applying two coats of oil emulsion distemper white/coloured over one coat of white cement based putty (where it is required) all as specified and directed.
Note : putty shall be measured and paid seperately. | 7,000 | Sqm | - | - |
| 3 | M&L for preparation of old decorated surfaces of wall including brooming , scraping down, smoke spot, moss, efflorescent salts, trading oil, grasy spots and stopping nails marks and one coat of oil emulsion distemper all as specified and directed. | 12,000 | Sqm | - | - |
| 4 | M&L for preparation of old decorated surface of wall including brooming, down, scrapping down smoke spot and stopping nails mark by filling white cement putty and applying one coat of coloured cement based paint all as specified. | 3,000 | Sqm | - | - |
| 5 | All as per item No. 4.00 here-in-bfore but on ceilings. | 1,000 | Sqm | - | - |
| 6 | M&L for preparing old plastered or unplastered surfaces of walls, removing unnecessary nails including filling of cracks/holes by crack filler and applying two coats cement based paint complete all as specified and directed. | 2,000 | Sqm | - | - |
| 7 | M&L for preparation of old painted surfaces of wood/wood based materials exc 10cm width or girth and applying one coat of synthetic enamel paint as directed and specified. | 1,000 | Sqm | - | - |
| 8 | All as per item No. 7.00 here-in-bfore but on steel surfaces. | 875 | Sqm | - | - |
| 9 | M&L complete removal of old decorated surface of wall and applying Two or more coats of 100% premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm white/coloured over and all as specified and directed. | 9,500 | Sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
TENDER_DOCU_8515.pdf
Tender Documents • 0.70 MB
BOQ_841109.xls
BOQ • 0.31 MB
CREDIT8515.pdf
Additional Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .