| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-AOC | ₹3.7 Cr | L1 | Accepted-AOC L1 |
| 2 | Not Admitted-Finance A 52 CHANAKYA PLACE NEW DELHI BRANCH OFFICE B 175 NANDGRAM GHAZIABAD PIN CODE 110045 | NEW DELHI | NEW DELHI | DELHI | 110045 | - | - | Not Admitted-Finance Not qualified for AOC |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5.7 Cr
EMD Value
₹11.4 L
Closing Date
21 Feb 2024, 12:00 pmClosed
SE
Office of Superintending Engineer Madhya Ganga Canal Construction Circle 1 Meerut
LOT1
2024_UPIDC_885835_2
05/SE/MRT/2023-24
Open Tender
Civil Works
Item Rate
90 days
BULANDSHAHR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹11.4 L
5 Mar 2024
16 Feb 2024
21 Feb 2024
16 Feb 2024
21 Feb 2024
16 Feb 2024
Amount
Restoration works of Jadol Dy. From Km. 0.000 to 17.400 M.G.C.Project First Stage.
Earth work in silt clearance including lift up to 1.5 M and lead up to 30 M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge.
Earth work in embankment in ordinary soil excavation tobe in the of regular pits and earth work in embankment tobe in 20 cm. layers. Including ramming and dressinig with machenical compaction.the surface to the required levels and slopes and also including 1.50 m. lift and 1.0 Km. lead. as directed by Engineer-in-charge.
CC Lining of Jadol Dy.(Lining of canal)
Earth work in foundation in dry in ordinary soil including ramming and dressing the surface , including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work.
Provide shuttering and centering including all materials and T&P etc for proper complition of work.
C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4 including cost of all material,labour T&P etc. and Shuttering required for proper completion of work.
Supplying /filling Local Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work.
Laying L.D.P.E. film i/c cost of scaffolding labour & t&P etc.
100 MM. Thick Lining in M20 (1:1.5:3) in bed and side slope including cost of all material,labour T&P etc. and Shuttering required for proper completion of work
Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work
CC Lining of Jadol Dy.(Lining in head reach of offtaking canals)
Earth work in foundation in dry in ordinary soil including ramming and dressing the surface , including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work.
Provide shuttering and centering including all materials and T&P etc for proper complition of work.
C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4 including cost of all material,labour T&P etc. and Shuttering required for proper completion of work.
Supplying /filling Local Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work.
Laying L.D.P.E. film i/c cost of scaffolding labour & t&P etc.
100 MM. Thick Lining in M20 (1:1.5:3) in bed and side slope including cost of all material,labour T&P etc. and Shuttering required for proper completion of work
Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work
CC Lining of Jadol Dy.(Lining in U/S & D/S of VRB/DRB)
Earth work in foundation in dry in ordinary soil including ramming and dressing the surface , including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work.
Provide shuttering and centering including all materials and T&P etc for proper complition of work.
C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4 including cost of all material,labour T&P etc. and Shuttering required for proper completion of work.
Supplying /filling Local Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work.
Laying L.D.P.E. film i/c cost of scaffolding labour & t&P etc.
100 MM. Thick Lining in M20 (1:1.5:3) in bed and side slope including cost of all material,labour T&P etc. and Shuttering required for proper completion of work
Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work
Construction of Outlets at Right Bank and left Bank of Jadol Dy. From km 0.00 to km 17.400
Excavation in foundation in ordinary soil (lome,clay or sand) including lift upto 1.50M and lead upto 30M. And including filling watering and ramming of Excavated earth ito trenches or into the space between the building and the side of foundation treches or into the plinth and removal and disposal of surplus earth upto a distence of 30M. from the trenches as ditected by the Engineer-in-Charge.
Providing & Laying cement concrete in foundation 1:3:6 stone grit, sand including supply of all material, labour, tools and plants etc
Brick work in M-150 Brick 1:4 cement and coarse sand f.m of 2.20 (1 cement :4 C/A) mortar in foundation, plinth level & Super structure including supply of all materials,labour and T&P .required for proper complition
Providing and fixing of 150/110 mm Diameter HDPE pressure pipe @6kg/sqm in required length as per site and complete the work all as specified and as directed by Engr-in-Charge.
Struck deep cement pointing in 1:2 CM incl cost of material & labour T&P etc.
Providing & Laying cement conc in floring or copping of wall etc. in proportion of 1:2:4 using 10-20 mm stone grit including cost of all materials, labour, T&p, etc. required for proper completion of work.
Painting work on cemented or brick surface one prime coat and one coat of dry distemper in new surface incl. all material & labour etc.
Construction of Boundary Pillars of Jadol Dy. From km 0.000 to km 17.400 (362 Nos)
Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m.
Providing & Laying cement concrete in foundation (1:2:4) stone grit, incl fixing of poles etc.sand including supply of all material, labour, tools and plants etc
P/F Ordinary centering & shuttering for RCC & CC works including all labour T&P etc.required for proper completion of work.
Providing & Laying R.C.C. M-20 1:1.5:3 nominal mix with cement coarse sand and stone agg i/c all cost of material labour T&P etc.
Steel Reinforcement for RCC work i/c cost of steel, bending,binding,cutting and placing in proper position etc. required for proper completion of work.
Painting of RCC precast boundry pillars of size 250mm x250mm x 900 mm including cost of material & labour and T&P etc. and writing letters including cost of material upto 15 cm height
Construction of Brick soling on service road of Jadol Dy. M.G.C Stage-I
Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with fine sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8") depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work..
Maintanace of Cattle Ghat at km 2.395 of Jadol Dy.
Brick Work with M-15 Bricks in 1:4 CM including cost of material, Labour, T&P etc required for proper complition of work.
Struckdeep cement pointing in 1:2 CM including cost of material, Labour, T&P etc required for proper complition of work.
Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with fine sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8") depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work.
Repair of VRB/DRB of Jadol Dy from km 0.000 to 17.400.
Ist class Brick Work in 1:4 CM M-150 Bricks in 1:4 CM including cost of material, Labour, T&P etc required for proper complition of work.
Struckdeep cement pointing in 1:2 CM including cost of material, Labour, T&P etc required for proper complition of work.
One prime coat and one coat of dry distemper of new work including supply all material labour T&P etc required for proper completion of work
Providing and fixing of Hazard maker including cost of all material labour and T&P etc.
Providing and fixing of Sign board including cost of all material labour and T&P etc.
painting and printing letters upto 30cm height including supply all material labour T&P etc required for proper completion of work at VRB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .