| 1 | L1₹8.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹8.2 L+₹229.39 (0.03%)Rejected-Finance | L2 | Rejected-Finance L2 |
Tender Value
₹8.4 L
EMD Value
₹8,400
Closing Date
11 Mar 2024, 3:00 pmClosed
The Block Development V.Pt ,Thiruppuvanam
The Block Development V.Pt ,Thiruppuvanam
CONSTRUCTION OF WAITING SHED,COMPOUND WALL AND CC ROAD AT MAYANAM IN KALUNGUPATTI VILLAGE AT MADAPURAM PANCHAYAT
2024_RDTN_441447_1
WAITING SHED-KALUNGUPATTI
Open Tender
Civil Works
Item Rate
30 days
Thiruppuvanam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹8,400
The Block Development V.Pt ,Thiruppuvanam
28 Oct 2024
6 Mar 2024
11 Mar 2024
6 Mar 2024
11 Mar 2024
6 Mar 2024
6 Mar 2024
Amount
CONSTRUCTION OF WAITING SHED,COMPOUND WALL AND CC ROAD AT MAYANAM IN KALUNGUPATTI VILLAGE AT MADAPURAM PANCHAYAT
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil as per SS20 B for foundation etc complete
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Refilling the basement with excavated earth other than sand complying the Standard specification
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Brickwork in Cement mortar 1 : 5 mix using country bricks including cost and conveyance of all materials to site and labour charges etc complete.
Supplying and errecting shuttering including necessary support for plane surface in Foundation Basement and Roof slabs strutting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connected with foundations g
Supplying, fabricating and placing in position mild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods
R.C.C. 1:1 1/2:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Ceiling Plastering with C. M 1:3 mix, 10 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including all cost and conveyance etc
Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site
Finishing the top of roof with one course of PRESSED TILES of size 23 cm X 23 cm X 2 cm laid in cement mortar 1:3 (One cement and three sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by we
Emulsion paiting two coats using cement paint two coats including cost and conveyance of all materials to site and labour charges etc complete.
sub estimate(compoundwall)
Earth work excavation and depositing on bank with initial lead and lift in hard gravely soil. In herds tiff clay stiff black cotton soil hard red earth shales murra stoney earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Filling with river sand including cost and conveyance of all materials to work site and all labour charges etc.
Cement concrete 1:4:8 mix using 40mm metal including cost and conveyance all materials to work site and all labour charge etc.
Brick work in Cm 1:5 mix using country brick including cost and conveyance and all labour charges etc.
Supplying and erecting centering for sides and soffits including supports and strutting up to 3.20 m height for plane surface in all floors with all cross bracing using mild steel
Column Upto GRB
Grade Beam Allround
Supply and fabrication of steel for RCC items including cost and conveyance of binding wire, etc., complete
RCC 1:1.5:3 mix using 20 mm ISS size HBG metal including cost and conveyace of all materials and all labour charges, etc.
Plastering with Cement Mortar 1:5 mix 12mm thick
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
sub estimate(cc road)
Earth work excavation for pavement in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete.HARD SOIL
Collection and supply of sand including cost and conveyance to the siteand all labour as per standard speecifications charges for filling
Cement concrete 1:4:8 using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
S ANBALAGAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .