Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹92,857.01Accepted-AOC | 1 | Accepted-AOC L1 |
Tender Value
Refer Docs
Closing Date
14 Jun 2021, 5:00 pmClosed
Executive Egnineer
WS Division No.1 Rewari
Construction of Pipe Culvert at K.M. 8.850 of Daultabad Minor
2021_HRY_175081_6
104/6A dated 04/06/2021
Open Tender
Civil Works
Item-rate/Agreement basic
30 days
XEN WS Division No.1 Rewari
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
19 Oct 2021
9 Jun 2021
15 Jun 2021
9 Jun 2021
14 Jun 2021
9 Jun 2021
Amount
Civil Work
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge (HSR item no. 4.12)
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in cement mortar 1:4 (HSR item no.7.20.1)
12 mm thick cement plaster 1:4 (HSR item no. 11.5.3)
Providing lowering cutting jointing and testing RCC pipe class NP-3 800mm dia as per 18-458-2003 with spigot & socketed joints manufactured with ISi marked sulphate resistance cement as per ISi 12330 with rubber rings ISi marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1 :3/2 cement sand mortar and with end dowels filled with 1 :3/2. cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No . 21.38, item 21.44, item 21.45, & item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being (HSR item No. 21.95.7)
Providing and laying cement concrete 1:2:4 in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor four level, excluding the cost of centering, shuttering and finishing (HSR item no. 6.2.2)
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m (HSR item no. 4.14.1)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .