| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 CrAccepted-AOC 65 MODEL TOWN 136026 | KAITHAL | HARYANA | 136026 | ₹6.0 Cr | L1 | Accepted-AOC Agreement Done |
| 2 | L2₹6.4 CrRejected-Finance HOUSE NO 535 SECTOR 18 HUDA KAITHAL 136027 | KAITHAL | KAITHAL | HARYANA | 136027 | ₹6.4 Cr | L2 | Rejected-Finance Reject |
| 3 | L3₹6.4 CrRejected-Finance RAM NAGAR NEW BUS STAND NARWANA 126116 | NARWANA | JIND | HARYANA | 126116 | ₹6.4 Cr | L3 | Rejected-Finance Reject |
| 4 | L4₹7.1 CrRejected-Finance NEAR WARD NO 15 CHHABRA COLONY NEAR NEW BYE PASS ASANDH 132039 HARYANA | KARNAL | HARYANA | 132039 | ₹7.1 Cr | L4 | Rejected-Finance Reject |
| 5 | L5₹7.1 CrRejected-Finance C O SURESH KUMAR VPO LOHANI TEHSIL DISTRICT BHIWANI 127029 | BHIWANI | BHIWANI | HARYANA | 127029 | ₹7.1 Cr | L5 | Rejected-Finance Reject |
Updated dates
Tender Value
₹8.1 Cr
EMD Value
₹16.2 L
Closing Date
6 Jan 2026, 2:00 pmClosed
GURVINDER SINGH
Kaithal W.S Divn. Kaithal
Estimate for laying pipeline and construction of other intervening structure of Geong Link Drain between RD 21000 to 14100
2025_HRY_492005_1
2025CF80BA74 AF9E 4C20 B3E1 CEAF24E874E0113IRR
Open Tender
Civil Works
240 days
Kaithal
Estimate for laying pipeline and construction of other intervening structure of Geong Link Drain between RD 21000 to 14100
3 documents required · 3 mandatory
₹20,000
₹16.2 L
Yes
Canal Colony Kaithal
3 Apr 2026
20 Dec 2025
6 Jan 2026
20 Dec 2025
6 Jan 2026
20 Dec 2025
2 Jan 2026
HSR Items
[11.5.2]12 mm cement plaster of mix : 2. 1:3 (1 cement: 3 fine sand) [Through Rate]
[14.71]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km . [Through Rate]
[21.28]Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, re-handling etc., complete in all respect to the satisfaction of Engineer-in-charge [Through Rate]
[21.95.12]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 12. 1600 mm [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.5]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 5. 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns [Through Rate]
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
[6.44]Providing, hoisting and fixing up to floor four level precast reinforced cement concrete in small lintels not exceeding 1.5m clear span up to floor four level, including the cost of required centering, shuttering but , excluding the cost of reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[7.21.3]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 3. Cement mortar 1:3 (1 cement : 3 coarse sand) [Through Rate]
[9.57.2]Providing and fixing on wall face Unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 2. 110 mm diameter [Through Rate]
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_570333.xls
BOQ • 0.35 MB
Other Document
Other Document • 1.08 MB
Download all tender documents and submit your bid