| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 CrAccepted-AOC | ₹8.2 Cr | L1 | Accepted-AOC accepted |
| 2 | L2₹8.5 CrRejected-AOC | ₹8.5 Cr | L2 | Rejected-AOC not accepted |
| Sl No | Description | Qty | Unit | R SABEER ALI L1 | A P CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 7,655 | m3 | 216.5 ₹16.6 L | 226 ₹17.3 L |
| 2.01 | Supplying and filling in foundation and basement with filling Stone Dust in layers of not more than 15cm.thick well rammed watered and compacted -1m3 etc., complete complying with standard specification.(TNBP No . 24 & 25) | 286 | m3 | 518 ₹1.5 L | 540 ₹1.5 L |
| 3.01 | CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 286 | m3 | 5,628 ₹16.1 L | 5,855 ₹16.7 L |
| 4.01 | Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Odai MAT CONCRETE | 1,321.4 | m3 | 9,364 ₹1.2 Cr | 9,740 ₹1.3 Cr |
| 5.01 | Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for odai SIDE WALL | 1,904 | m3 | 12,318 ₹2.3 Cr | 12,812 ₹2.4 Cr |
| 6.01 | Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for DECK SLAB | 55.8 | m3 | 12,967 ₹7.2 L | 13,486 ₹7.5 L |
| 7.01 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.TNBP-spl | 3,11,714 | kg | 92.97 ₹2.9 Cr | 97 ₹3.0 Cr |
| 8.01 | Removal of Excavated Excess Earth away from the site to 3K.M including loading and transportation charges etc, complete as per standard specification. For 1M3 | 7,655 | m3 | 80 ₹6.1 L | 83 ₹6.4 L |
| 9.01 | Provision for GST 18% | 1 | No | 1,25,20,464.17 ₹1.3 Cr | 1,30,40,572.64 ₹1.3 Cr |
Tender Value
₹8.3 Cr
EMD Value
₹8.3 L
Closing Date
24 Feb 2026, 3:00 pmClosed
The Commissioner, Gudalur Municipality
The Commissioner, Gudalur Municipality
KNMT-2025-2026 Construction of Storm Water Drain at Canal (Sullakarai Odai) at Gudalur Municipality
2026_MAWS_656494_1
302/2025/E1
Open Tender
Civil Works - Water Works
180 days
Gudalur Municipality
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8.3 L
Gudalur Municipality
6 Mar 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
24 Feb 2026
13 Feb 2026
17 Feb 2026
Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.
Supplying and filling in foundation and basement with filling Stone Dust in layers of not more than 15cm.thick well rammed watered and compacted -1m3 etc., complete complying with standard specification.(TNBP No . 24 & 25)
CEMENT CONCRETE - M7.5 (1:4:8) (one part of cement, four part of Crushed Stone Sand (M- Sand) and eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for Odai MAT CONCRETE
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for odai SIDE WALL
Vibrated Reinforced Cement Concrete M25 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for DECK SLAB
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.TNBP-spl
Removal of Excavated Excess Earth away from the site to 3K.M including loading and transportation charges etc, complete as per standard specification. For 1M3
Provision for GST 18%
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
bidodai.pdf
Tender Documents • 1.27 MB
BOQ_787269.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid