| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.1 LAccepted-AOC | ₹25.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹26.5 LRejected-AOC | ₹26.5 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | S R B CONSTRUCTION L1 | BASKARAN T L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 146 | M3 | 258.6 ₹37,755.60 | 273.1 ₹39,872.60 |
| 2.01 | Supplying and filling in foundation and basement with filling Quarry Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification. | 8 | M3 | 418.5 ₹3,348 | 441.9 ₹3,535.20 |
| 3.01 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 12 | M3 | 5,669.9 ₹68,038.80 | 5,987.4 ₹71,848.80 |
| 4.01 | Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.00 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) Centering For Vertical Portion | 245 | M2 | 1,347.6 ₹3.3 L | 1,423.1 ₹3.5 L |
| 5.01 | Centering For Bottom only | 68 | M2 | 1,123 ₹76,364 | 1,185.9 ₹80,641.20 |
| 6.01 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 73 | M3 | 9,448.9 ₹6.9 L | 9,978 ₹7.3 L |
| 7.01 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 8,760 | Kg | 93.8 ₹8.2 L | 99.1 ₹8.7 L |
| 8.01 | Charges towards finishing the concrete surface with power traveler machine rate shall include the cost of fule charges hire for manchine and labour charges for operation etc.,, | 70 | M2 | 50 ₹3,500 | 52.8 ₹3,696 |
| 9.01 | Dewatering using 3HP to 70HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete. (Hire charges for Diesel Pump set for 10 HP) | 80 | Hrs | 617.2 ₹49,376 | 651.8 ₹52,144 |
| 10.01 | Supply of FRC Manhole 600mm size dia cover with frame including cost of conveyance loading fixing the same etc complete | 3 | Nos | 2,672.3 ₹8,016.90 | 2,821.9 ₹8,465.70 |
Tender Value
₹25.1 L
EMD Value
₹25,128
Closing Date
18 Dec 2025, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai , Thallakulam , Madurai
New construction of RCC storm water Drain for Kondagai channel at Arul Avenue Ganesh Nagar in ward no. 41
2025_MAWS_628843_1
E8 / EST 355 / 2025-26 (NNT)
Open Tender
Civil Works
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹25,128
15 Jun 2026
4 Dec 2025
18 Dec 2025
4 Dec 2025
18 Dec 2025
4 Dec 2025
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Supplying and filling in foundation and basement with filling Quarry Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specification.
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.00 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) Centering For Vertical Portion
Centering For Bottom only
Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Charges towards finishing the concrete surface with power traveler machine rate shall include the cost of fule charges hire for manchine and labour charges for operation etc.,,
Dewatering using 3HP to 70HP diesel engine pumpset including Hire charges, cost of Diesel, Engine oil, pump operator, labour charges, conveyance of pumpset and fuel to site and back, loading, unloading and any other incidental charges etc., complete. (Hire charges for Diesel Pump set for 10 HP)
Supply of FRC Manhole 600mm size dia cover with frame including cost of conveyance loading fixing the same etc complete
Supply and Delivery of RCC non pressure spun pipe with socket and spigot ends as per IS 458/2003 manufactured with sulphate resistant cement with 12 mm HI -alumina lining with rubber ring joints. 600 mm dia
Lowering RCC pipes and specials into the trenches and laying to proper grade and alignment 600 mm dia
Jointing RCC pipes with cement using necessary collars including the cost of jointing materials. 600 mm dia
Add GST 18%
BASKARAN T (BID ID -1535274)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
Doc.pdf
Tender Documents • 0.93 MB
BOQ_751974.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid