Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance SANTOBI MATA GALI MURSAN HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | Admitted-Finance |
| 2 | Admitted-Finance NAYA MILL MURSAN GATE HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | Admitted-Finance |
| 3 | Admitted-Finance NAGLA SADAK HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
23 Feb 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE
EDC Hathras
Deeposit Work
2023_DVVNL_773280_1
EDCH-120/2022-23
Open Tender
Electrical Works
Item Rate
180 days
Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL Website
₹5,000
21 Mar 2023
14 Feb 2023
23 Feb 2023
14 Feb 2023
23 Feb 2023
14 Feb 2023
Amount
Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)
8.5 Mtr. long PCC Poles.
9/11 Mtr Long STP Poles.
3*120 sqmm AB cable
11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps Abc Bunch and other required line material, if any.
Safe Carriage of following from Electricty Store center Hathras to Pit Site of Work through the Kacha and Pakka road loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-70 Kms.)
100 KVA T/F
250 KVA T/F
Errection of following Poles with grouting including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
PCC poles 8.5/9 Mtr.
9/11 Mtr Long STP Poles.
Double pole complet fitting
Fixing & Jumphering of CT/PT unit/ 11 KV & 33 KV metering qubical box cable jointing kit
Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
ACSR Weasal conductor
3*120 sqmm AB cable
Errection of LT dustribution boxes & fixing of New at already/Newly errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement.
Providing & Fixing of Following Clamps
11 KV X Arms Clamps for STP/PCC Pole
11 KV V Type X Arms Clamps for STP/PCC Pole
11 KV DP Clamps for STP/PCC Pole
11 KV F Clamp for STP/PCC Pole
Fixing of Following Accessirious
Top Channel
Dropper Channel
11 KV Pin Insulator
11 KV Disc Insulator
11 KV TPMO
Danger Board
Fuse Set
Installation of following T/F on newly constructed double pole in proper alignment direction & making HT/LT connection.
100 KVA T/F
250 KVA T/F
Construction of plinth for 250 KVA T/F of size 5' * 5 * 4' above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand.
Pipe earthing of 250 KVA medium Power Transformers
Earthing of 100 KVA medium Power Transformers
Net Fencing Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm for 250 KVA T/F duly steftened by MS flat by an 8 SWG dia bolt & nut
Installation of extra ''T'' on the erected poles wherever required alongwith all fitting as per direction of supervising engineer including the cost of labour, T&P etc, required for proper completion of work. The "T" pole shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 including the cost of material.
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Construction of round pole plinth around the STP/PCC will be done Cement, sand and concrete in rasio 1:3:6 Rasio of size 450 mm dia and 600 mm hight (300 mm under the ground + 300mm over the ground). The plinth shoudbe plastered with 1/2 inch thick cement and sand of Rasio 1/4 and taper rounding the uper most part of the plinth the rate will include all cost of meterial labour and T&P ETC. for complition of work.
Krishna Agency Hathras
GOSWAMI ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .