Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.9 LAccepted-AOC F 16 PROFESSOR COLONY KAMLA NAGAR AGRA UTTAR PRADESH 282004 | AGRA | UTTAR PRADESH | 282004 | 1 | Accepted-AOC L1 | |
| 2 | 2₹16.3 L+₹1.4 L (9.31%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹16.8 L+₹1.9 L (12.8%)Rejected-AOC | 3 | Rejected-AOC L3 | |
| 4 | 4₹17.0 L+₹2.1 L (14.4%)Rejected-AOC | 4 | Rejected-AOC L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Not fulfil all Documents as per NIT (Mentioned in Annexure) |
Tender Value
₹21.8 L
EMD Value
₹54,534
Closing Date
22 Feb 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Archaeologist
Office of The Superintending Archaeologist ASI, The 22, Mall Road, Agra Circle
AS PER TENDER DOCUMENT
2024_ASI_793141_1
03/AGF/38/2023-2024/W
Open Tender
Civil Works
Works
120 days
AGRA FORT
AS PER TENDER DOCUMENT
8 documents required · 8 mandatory
₹0
₹54,534
Yes
18 Mar 2024
1 Feb 2024
23 Feb 2024
1 Feb 2024
22 Feb 2024
1 Feb 2024
Amount
Demolishing brick work manually for removal of vegetation roots and small trees from the wall and structure with very carefully to avoid the damage of joining structure including stacking of serviceable material and disposal of unserviceable material and Masonry work with departmental bricks with lime mortar 1:1:1 ratio (1 U. lime: 1 coarse sand : 1 surkhi of 1st class bricks). (Rate Including GST).
Taking out and uprooting of vegetation growth with adjacent masonry and underpinnig with Lakhauri brick of required size matching to the site in Lime mortar 1:1:1(one unslacked lime, one surkhi, one coarse sand) matching to the original including adhesive materials. (Rate Including GST).
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (Rate Including GST).
Providing and laying in position cement concrete 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). of specified grade excluding the cost of centering and shuttering. as per direction of Engineer in- charge. (Rate Including GST).
Random rubble masonry with hard stone in foundation and up to plinth including leveling up with lime mortar 1:1:1 (1Lime, 1C.Sand, 1Surkhi) including supply of all materials, T&P etc. required for completion of work. (Rate Including GST).
Providing & laying position lime concrete with graded brick aggregate 20 to 25 mm size and 50% composite lime mortar 1:1:1 ratio (1 lime, 1 surkhi, 1 c. sand) including supply of all materials labour, scaffolding, T. & P. etc required for proper completion of work. (Rate Including GST).
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : 6.4.1 Cement mortar 1:4 (1 cement : 4 coarse sand). (Rate Including GST).
50 mm thick fine dressed red sand stone flooring over 20 mm (average) thick base of lime mortar 1:1:1 ratio (1 lime, 1 surkhi, 1 c. sand) including pointing with same mortar. (Rate Including GST).
Providing and fixing rough red sand stone 12cm thick curved veneering stone including chiseling out the old and decayed veneering stone as and where required approximate 60% with 1:1:1 ratio mortar (1 Lime, 1 Surkhi of 1st class bricks,1 C. Sand) and S.S. clamp including supply of all materials, pointing, labour T.& P. etc. required for proper completion of work . (Rate Including GST).
Providing and fixing rough red sand stone 15cm thick curved Dab stone including chiseling out old and decayed Dab stone with 1:1:1 ratio mortar (1 Lime, 1 Surkhi of 1st class bricks,1 C. Sand) and S.S. clamp including supply of all materials, pointing, labour T.& P. etc. required for proper completion of work.(Rate Including GST).
Providing and fixing rough red sand stone for Drain Cover including with 1:1:1 ratio mortar (1 Lime, 1 Surkhi of 1st class bricks,1 C. Sand) including supply of all materials, pointing, labour T.& P. etc. required for proper completion of work. (Rate Including GST).
Flush pointing on Red Sand stone veneering with 1:1:1 ratio mortar (1 Lime, 1 Surkhi of 1st class bricks,1 C. Sand) including supply of all materials, labour T.& P. etc. required for proper completion of work up to height 7 mtr. (Rate Including GST).
Providing and applying lime plaster 30 mm thick in ratio of 1:1:1 (1 unslacked lime, 1 surkhi, 1 sand ) in two coats, 1st of 18 mm thick and top coat of 12 mm thick mixed with binding material such as San, or Jute, belgiri, gur, Gum, including supply of all materials, labours, curing , cleaning the surface , etc. (Rate Including GST).
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m center to center, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineerin- charge .The elevation area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding up to height 7mtr. (Rate Including GST).
Desilting / Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by manual labour from baoli to out side of boali through staircase including excavating, loading, ransporting, unloading in pits and leveling in low level area around 50 m ( additional Lead)of site for all lifts, complete as per directions of Engineer-in-charge. (Rate Including GST).
12 mm cement plaster of 1:4 ratio ( 1 Cement and 4 Coarse Sand ). (Rate Including GST).
POOJA CONSTRUCTION
ANAND INFRAWORKS PRIVATE LIMITED
PAPPAN ELECTRIC AND GAS WELDING WORKS
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .