Loading…
Loading…
Tender Value
₹46.6 L
EMD Value
₹93,300
Closing Date
18 Aug 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
63 days
Expenditure
Capital (Works)
WORKS
11 conditions · 8 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1) Tenderer should attach self attested copy of PAN CARD and photo identification in support of their Identity. 2) The documents attached to the tender document should be clear and legible for evaluation of tenders. Proper care to be taken in this regard
A copy of document to be uploaded containing the following details: Name of the tenderer/ contractor, Validity of DSC, Complete address with pincode, Contact No.
Scanned copy of PAN card has to be enclosed
Scanned copy of TIN card has to be enclosed
A copy of NEFT form duly filled in the details as necessary along with a cancelled Cheque to be uploaded. (The tenderer/ contractor not having NEFT form may down load the empty NEFT form available in documents site)
Information/ certificates required as per Tender document for partnership deed, Article of association, MOU, JV AGREEMENT, Proprietary firm etc.
Self Attested copy of Experience Certificate of Previous Work Done -The bidder should submit documents related to completed/on-going similar service contracts during the last three previous financial years and the current financial year along with the details of payments received and percentage penalties imposed therein, to classify the completed/ on-going similar service contracts.
For materials of purchase value Rs.5 lakhs and above, inspection shall be done by third party i.e. M/s. RITES and all expenditure in connection with the inspection shall be borne by the tenderer/Contractor. For ISI marked products, if the order is placed on ISI certified manufacturers, the materials can be accepted on firm's WTC
Name of the work: -Chennai Division-Electrical arrangements for various works as per (List of Works Enclosed)
ME-29-II-1103-2026
ME-29-II-1103-2026
Open
Works - General
120 Days
Chennai, Tamil Nadu
₹0
₹93,300
18 Aug 2026
28 Jul 2026
4 Aug 2026
154 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 46,63,279 | ||
| — | — | — | Above/ 276420.00 Below/P | ||
| Excavation of Cable trench in all kinds of soils duly removing all obstructions in the way of cable trench, dumping at embankment site within railway land complete as per specification enclosed and in a manner as directed by the Section Engineer in charge at site. NOTE: The Section Engineer, in charge at site, will indicate the route of cable trench. b)Re-filling of trench with excavated earth, ramming, consolidation and bringing back the surface to original condition complete in a manner as directed by the Section Engineer in charge at site. | — | 1084.00 | — | — | |
| — | — | — | Above/ 57200.00 Below/P | ||
| Demolishing plain cement concrete in platform or elsewhere, disposal of material at least 6m away from track centre within railway land by saw cutting/breaker as per site conditions to avoid any damage to nearby site complete in a manner as directed by the Section Engineer in charge at site. | — | 110.00 | — | — | |
| — | — | — | Above/ 622160.00 Below/P | ||
| Supply and provision of mass concrete for platforms or elsewhere with 1:2:4 ratio using 20mm graded blue metal complete in a manner as directed by the Section Engineer in charge at site. NOTE: i)Cement shall be Ordinary Portland Cement, 43 grade, conforming to IS: 456 or latest. ii)Proper compaction of cement concrete shall be ensured as per standard industrial practices. iii)The finished level should match with surface level properly | — | 110.00 | — | — | |
| — | — | — | Above/ 82500.00 Below/P | ||
| Laying/leading of 4 core 25 sq.mm LTUG Aluminium cable in the excavated trench, threading through pipe, clamping on walls and terminating in as many ends using suitable single compression cable glands, lugs , sockets and other items required complete as per site conditions in a manner complete as directed by Section Engineer in charge at site. Note:- 4Cx25 sq.mm LTUG Aluminium Cable alone will be supplied departmentally. | — | 2750.00 | — | — | |
| — | — | — | Above/ 31000.00 Below/P | ||
| Laying/leading of 4 core 35 sq.mm LTUG Aluminium cable in the excavated trench, threading through pipe, clamping on walls and terminating in as many ends using suitable single compression cable glands, lugs , sockets and other items required complete as per site conditions in a manner complete as directed by Section Engineer in charge at site. Note:- 4Cx35 sq.mm LTUG Aluminium Cable alone will be supplied departmentally. | — | 1000.00 | — | — | |
| — | — | — | Above/ 15000.00 Below/P | ||
| Laying/leading of 4 core 50 sq.mm LTUG Aluminium cable in the excavated trench, threading through pipe, clamping on walls and terminating in as many ends using suitable single compression cable glands, lugs , sockets and other items required complete as per site conditions in a manner complete as directed by Section Engineer in charge at site. Note:- 4Cx50 sq.mm LTUG Aluminium Cable alone will be supplied departmentally. | — | 500.00 | — | — | |
| — | — | — | Above/ 27300.00 Below/P | ||
| Laying/leading of 4 core 70 sq.mm LTUG Aluminium cable in the excavated trench, threading through pipe, clamping on walls and terminating in as many ends using suitable single compression cable glands, lugs , sockets and other items required complete as per site conditions in a manner complete as directed by Section Engineer in charge at site. Note:- 4Cx70 sq.mm LTUG Aluminium Cable alone will be supplied departmentally. | — | 700.00 | — | — | |
| — | — | — | Above/ 88200.00 Below/P | ||
| Laying of 50 mm dia High Density Polyethylene pipes in the excavated trench, clamping on walls / Steel members of platform shelter or elsewhere using suitable GI fixing arrangements and couplers and other accessories required at appropriate locations as per site conditions so that cable can be easily inserted and removed wherever need arises complete in a manner as directed by Senior Section Engineer-in-charge at site. Note: 50mm dia HDPE pipe alone will be supplied departmentally. | — | 3150.00 | — | — | |
| — | — | — | Above/ 43400.00 Below/P | ||
| Laying of 63 mm dia High Density Polyethylene pipes in the excavated trench, clamping on walls / Steel members of platform shelter or elsewhere using suitable GI fixing arrangements and couplers and other accessories required at appropriate locations as per site conditions so that cable can be easily inserted and removed wherever need arises complete in a manner as directed by Senior Section Engineer-in-charge at site. Note: 63mm dia HDPE pipe alone will be supplied departmentally. | — | 1400.00 | — | — | |
| — | — | — | Above/ 20500.00 Below/P | ||
| Laying of 75 mm dia High Density Polyethylene pipes in the excavated trench, clamping on walls / Steel members of platform shelter or elsewhere using suitable GI fixing arrangements and couplers and other accessories required at appropriate locations as per site conditions so that cable can be easily inserted and removed wherever need arises complete in a manner as directed by Senior Section Engineer-in-charge at site. Note: 75mm dia HDPE pipe alone will be supplied departmentally. | — | 500.00 | — | — | |
| — | — | — | Above/ 42480.00 Below/P | ||
| Installation, Testing and Commissioning of the LT Earthing arrangements duly by excavating/ auguring of earth pit in all kinds of soil/concrete surface or elsewhere, construction of masonry earth pit enclosure, provision of cover etc, complete including supply / leading / laying / burying and concealing of GI strip 32 X 6 mm along with proper sleeve from earth electrode to proposed MDB / SDB or elsewhere and in a manner as directed by Senior Section Engineer in charge at site. N o t e : 1) Masonry earth pit enclosure and cover shall be as per drawing number EL/P/TYPE/1022. 2) LT Earthing Electrode alone will be supplied Departmentally. | — | 36.00 | — | — | |
| — | — | — | Above/ 2880.00 Below/P | ||
| Drawing of inside mains using 4 runs of 10 sq. mm [from MCB DB to switch boards and from switch boards to switch boards / or elsewhere] multistranded copper conductor cables duly inside the PVC conduit concealed / laid vide item No. 18 below complete as per the specification enclosed and in a manner as directed by Senior Section Engineer in charge at site. Note: - 4 runs of 10 sq. mm copper cable are taken as 1m for quantity purpose and will be supplied Departmentally | — | 90.00 | — | — | |
| — | — | — | Above/ 5200.00 Below/P | ||
| Drawing of inside mains using 2 runs of 6 sq. mm [from MCB DB to switch boards and from switch boards to switch boards / or elsewhere] multistranded copper conductor cables duly inside the PVC conduit concealed / laid vide item No. 17 below complete as per the specification enclosed and in a manner as directed by Senior Section Engineer in charge at site. Note: - 2 runs of 6 sq. mm copper cable are taken as 1m for quantity purpose and will be supplied Departmentally | — | 400.00 | — | — | |
| — | — | — | Above/ 37700.00 Below/P | ||
| Drawing of inside mains using 2 runs of 4 sq. mm [from MCB DB to switch boards and from switch boards to switch boards / or elsewhere] multistranded copper conductor cables duly inside the PVC conduit concealed / laid vide item No. 17 below complete as per the specification enclosed and in a manner as directed by Senior Section Engineer in charge at site. Note: - 2 runs of 4 sq. mm copper cable are taken as 1m for quantity purpose and will be supplied Departmentally | — | 2900.00 | — | — | |
| — | — | — | Above/ 17680.00 Below/P | ||
| Drawing of inside mains using 2 runs of 2.5 sq. mm [from MCB DB to switch boards and from switch boards to switch boards / modular furniture or elsewhere] multistranded copper conductor cables duly inside the PVC conduit concealed / laid vide item No. 17 below complete as per the specification enclosed and in a manner as directed by Senior Section Engineer in charge at site. Note: - 2 runs of 2.5 sq. mm copper cable are taken as 1m for quantity purpose and will be supplied Departmentally | — | 1360.00 | — | — | |
| — | — | — | Above/ 45500.00 Below/P | ||
| Drawing of inside mains using 2 runs of 1.5 sq. mm [from MCB DB to switch boards and from switch boards to switch boards / modular furniture or elsewhere] multistranded copper conductor cables duly inside the PVC conduit concealed / laid vide item No. 17 below complete as per the specification enclosed and in a manner as directed by Senior Section Engineer in charge at site. Note: - 2 runs of 1.5 sq. mm copper cable are taken as 1m for quantity purpose and will be supplied Departmentally | — | 3500.00 | — | — | |
| — | — | — | Above/ 144984.00 Below/P | ||
| Concealing of 25mm dia rigid PVC conduits along with all accessories and includingcutting/ chipping the wall/ceiling or elsewhere and making good the same including replastering and painting wall to original condition /clamped at regular intervals, not exceeding 500 mm in a manner as directed by Section Engineer in charge at site and as per specification for wiring/ rewiring enclosed. [Approximate length of PVC conduit] Note:25mm dia PVC conduit pipe, Bends, Junction Boxes alone will be supplied Departmentally | — | 5178.00 | — | — | |
| — | — | — | Above/ 2700.00 Below/P | ||
| Concealing of 32mm dia rigid PVC conduits along with all accessories and including cutting/ chipping the wall/ceiling or elsewhere and making good the same including replastering and painting wall to original condition /clamped at regular intervals, not exceeding 500 mm in a manner as directed by Section Engineer in charge at site and as per specification for wiring/ rewiring enclosed. [Approximate length of PVC conduit] Note:32mm dia PVC conduit pipe, Bends, Junction Boxes alone will be supplied Departmentally | — | 90.00 | — | — | |
| — | — | — | Above/ 43776.00 Below/P | ||
| Drawing of earth wire using 1.5 sq.mm PVC insulated copper conductor cables duly along wires vide item No's 13,14,15 and 16 above and light and fan points vide item No's 20,21 and 22 below or elsewhere complete in a manner as directed by Senior Section Engineer in charge at site. Note: 1.5 sq.mm copper cable alone will be supplied departmentally. | — | 5472.00 | — | — | |
| — | — | — | Above/ 12950.00 Below/P | ||
| Wiring to light, fan, exhaust fan points [Short point i.e. length upto 3 mtr] by supply and drawing of 2 runs of 1.5 sq. mm Fire Retardant Low Smoke PVC insulated copper multi-stranded copper cables of 1100 V grade [conforming to IS: 694/1990 or latest] duly inside the PVC conduit concealed vide item No. 17 above complete with provision of 6A Modular switch conforming to IS: 3854/2023 or latest, 1 No. 3 plate ceiling rose conforming to IS: 371/1999 or latest and with all standard accessories complete and in a manner as directed by Section Engineer in charge at site. | — | 74.00 | — | — | |
| — | — | — | Above/ 62565.00 Below/P | ||
| Wiring to light, fan, exhaust fan points [Medium point i.e. length between 3 to 6 mtr] by supply and drawing of 2 runs of 1.5 sq. mm Fire Retardant Low Smoke PVC insulated copper multi-stranded copper cables of 1100 V grade [conforming to IS: 694/1990 or latest] duly inside the PVC conduit concealed vide item No. 17 above complete with provision of 6A Modular switch conforming to IS: 3854/2023 or latest, 1 No. 3 plate ceiling rose conforming to IS: 371/1999 or latest and with all standard accessories complete and in a manner as directed by Section Engineer in charge at site. | — | 215.00 | — | — | |
| — | — | — | Above/ 38850.00 Below/P | ||
| Wiring to light, fan, exhaust fan points [Long point i.e. length between 6 to 9 mtr] by supply and drawing of 2 runs of 1.5 sq. mm Fire Retardant Low Smoke PVC insulated copper multi stranded copper cables of 1100 V grade [conforming to IS: 694/1990 or latest] duly inside the PVC conduit concealed vide item No. 17 above complete with provision of 6A Modular switch conforming to IS: 3854/2023 or latest, 1 No. 3 plate ceiling rose conforming to IS: 371/1999 or latest and with all standard accessories complete and in a manner as directed by Section Engineer in charge at site | — | 111.00 | — | — | |
| — | — | — | Above/ 5670.00 Below/P | ||
| Installation ,Testing and commissioning of modular frame plate with matching cover plate including and suitable for 12 modules, switches, sockets, blank plates etc. duly accommodated onto suitable modular switch board box complete and recess mounting/ concealing the same onto the wall using suitable fixing arrangements including cutting/ chipping/ making recess on the wall or elsewhere including all wiring works complete including replastering painting etc. complete and in a manner as directed by Senior Section Engineer in charge at site. Note: -12 module Frame plate with matching cover plate, switch, socket and Modular GI box alone will be Supplied Departmentally. | — | 30.00 | — | — | |
| — | — | — | Above/ 6510.00 Below/P | ||
| Installation ,Testing and commissioning of modular frame plate with matching cover plate including and suitable for 8 modules, switches, sockets, blank plates etc. duly accommodated onto suitable modular switch board box complete and recess mounting/ concealing the same onto the wall using suitable fixing arrangements including cutting/ chipping/ making recess on the wall or elsewhere including all wiring works complete including replastering painting etc. complete and in a manner as directed by Senior Section Engineer in charge at site. Note: -8 module Frame plate with matching cover plate, switch, socket and Modular GI box alone will be Supplied Departmentally. | — | 35.00 | — | — | |
| — | — | — | Above/ 3420.00 Below/P | ||
| Installation ,Testing and commissioning of modular frame plate with matching cover plate including and suitable for 4 modules, switches, sockets, blank plates etc. duly accommodated onto suitable modular switch board box complete and recess mounting/ concealing the same onto the wall using suitable fixing arrangements including cutting/ chipping/ making recess on the wall or elsewhere including all wiring works complete including replastering painting etc. complete and in a manner as directed by Senior Section Engineer in charge at site. Note: -4 module Frame plate with matching cover plate, switch, socket and Modular GI box alone will be Supplied Departmentally. | — | 36.00 | — | — | |
| — | — | — | Above/ 3330.00 Below/P | ||
| Installation, Testing and commissioning of the 300mm sweep BLDC Exhaust fan onto the buildings or elsewhere using suitable clamping and fixing arrangement complete as per industrial practices including supply connection from ceiling rose by using 3 core 1.5 sq. mm fire retardant Low smoke PVC insulated, PVC round sheathed copper [White / Ivory colour] conductor flexible pendant chord conforming to IS:694/1990 or latest complete as per industrial standards and in a manner as directed by Senior Section Engineer in charge at site. Note: 300mm sweep BLDC Exhaust fan alone will be supplied departmentally. | — | 18.00 | — | — | |
| — | — | — | Above/ 14839.00 Below/P | ||
| Installation, Testing and commissioning of 1200mm sweep BLDC ceiling fan onto the buildings or elsewhere using suitable clamping and fixing arrangement complete as per industrial practices including supply connection from ceiling rose by using 3 core 1.5 sq. mm fire retardant Low smoke PVC insulated, PVC round sheathed copper [White / Ivory colour] conductor flexible pendant chord conforming to IS:694/1990 or latest complete as per industrial standards and in a manner as directed by Senior Section Engineer in charge at site. Note: 1200mm sweep BLDC Ceiling fan alone will be supplied departmentally. | — | 71.00 | — | — | |
| — | — | — | Above/ 26705.00 Below/P | ||
| Installation, Testing and commissioning of 4 feet 20W LED light fitting Batten type suitable to work on 240V single phase 50 Hz AC with lamp and all standard accessories using suitable mounting and fixing arrangement as per industrial practices including supply connection from ceiling rose by using 3 core 1.5 sq. mm Fire Retardant Low Smoke PVC insulated, PVC round sheathed copper [White/Ivory colour] conductor flexible pendant chord conforming to IS:694/1990 or latest complete as per industrial standards and in a manner as directed by Senior Section Engineer in charge at site. Note: 4 feet LED 20W light fitting Batten Type with lamp alone will be supplied Departmentally | — | 245.00 | — | — | |
| — | — | — | Above/ 14484.00 Below/P | ||
| Installation, Testing and commissioning of 600mm sweep BLDC Air circulators onto wall / stanchion / rail post or elsewhere using suitable clamping arrangement made of 40mm X 6mm MS flat and MS plate of size of 300mm X 300mm X 6mm complete in a manner as per standard industrial standards and in a manner as directed by Section Engineer in charge at site.Note: 600mm sweep BLDC Air circulators alone will be supplied Departmentally. | — | 12.00 | — | — | |
| — | — | — | Above/ 2800.00 Below/P | ||
| Stringing of over head mains beneath platform shelters using 5 runs of 35 sq. mm PVC insulated and PVC sheathed multi stranded aluminium conductor cable duly by binding onto insulators of brackets provided vide item No. 31 below complete in a manner as directed by Section Engineer in charge at Site. Note: 5 runs of 35 sq.mm cable are taken as 1m for unit purpose and will be supplied Departmentally. | — | 280.00 | — | — | |
| — | — | — | Above/ 2240.00 Below/P | ||
| Provision of MS brackets, fabricated as per sketch enclosed ,for supporting OH wire beneath platform shelters, mounted with 4 Nos. of porcelain vertical reel / shackle insulators and earth stud / bolt, finished with 2 coats of red plete with fixing arrangements as per drawing enclosed and in a manner as directed by Section Engineer in charges at site Note: MS bracket alone will be supplied Departmentally. | — | 28.00 | — | — | |
| — | — | — | Above/ 69072.00 Below/P | ||
| Erection, testing and commissioning of 4 meter single arm octagonal pole assembly onto the suitable RCC foundation and coping by using modern engineering practice including installation, testing and commissioning of LED luminaries including all wiring works from nearby junction box as per industrial standards complete in a manner as directed by Section Engineer in charge at site. Note: 1) The foundation design and drawing along with supporting IS specifications suitable for Octagonal poles supplied by Railways and as per site conditions should be submitted for approval before starting the work 2) Four metre single arm Octagonal pole and accessories along with luminaries alone will be supplied departmentally. | — | 24.00 | — | — | |
| — | — | — | Above/ 115120.00 Below/P | ||
| Erection, testing and commissioning of 4 meter Double arm octagonal pole assembly onto the suitable RCC foundation and coping by using modern engineering practice including installation, testing and commissioning of LED luminaries including all wiring works from nearby junction box as per industrial standards complete in a manner as directed by Section Engineer in charge at site. Note: 1) The foundation design and drawing along with supporting IS specifications suitable for Octagonal poles supplied by Railways and as per site conditions should be submitted for approval before starting the work 2) Four metre double arm Octagonal pole and accessories along with luminaries alone will be supplied departmentally. | — | 40.00 | — | — | |
| — | — | — | Above/ 43170.00 Below/P | ||
| Erection, testing and commissioning of 5 meter single arm octagonal pole assembly onto the suitable RCC foundation and coping by using modern engineering practice including installation, testing and commissioning of LED luminaries including all wiring works from nearby junction box as per industrial standards complete in a manner as directed by Section Engineer in charge at site. Note: 1) The foundation design and drawing along with supporting IS specifications suitable for Octagonal poles supplied by Railways and as per site conditions should be submitted for approval before starting the work . 2) Five metre single arm Octagonal pole and accessories along with luminaries alone will be supplied departmentally | — | 15.00 | — | — | |
| — | — | — | Above/ 92096.00 Below/P | ||
| Erection, testing and commissioning of 5 meter Double arm octagonal pole assembly onto the suitable RCC foundation and coping by using modern engineering practice including installation, testing and commissioning of LED luminaries including all wiring works from nearby junction box as per industrial standards complete in a manner as directed by Section Engineer in charge at site. Note: 1) The foundation design and drawing along with supporting IS specifications suitable for Octagonal poles supplied by Railways and as per site conditions should be submitted for approval before starting the work . 2) Five metre double arm Octagonal pole and accessories along with luminaries alone will be supplied departmentally. | — | 32.00 | — | — | |
| — | — | — | Above/ 7020.00 Below/P | ||
| — | 10.00 | — | — | ||
| Testing as adaptor box and re-plastering condition ends complete in charge at | : - Installation, 40A/63A/100A,FP,RCBO/MCCB/RCCB with Cable cutting/chipping walls to original and outgoing Engineer Departmentally | and Incomer along on to the and complete and as site. Note: MCB | DB's with as feeder frame work condition including termination works manner as directed box etc alone | ||
| — | — | — | Above/ 354.00 Below/P | ||
| Installation, Testing and commissioning of 0-60A CT operated Multifunction Energy Meter with Enclosure onto wall or elsewhere using suitable angle iron frame work and mounting and fixing arrangements complete including all wiring,cabling connection and termination works at both incoming and outgoing ends complete as per industrial standards and in a manner as directed by Section Engineer in charge at site. Note: 0-60A CT operated Multi Function Meter with Enclosure alone will be supplied Departmentally. | — | 1.00 | — | — | |
| — | — | — | Above/ 630.00 Below/P | ||
| Erection, Testing and commissioning of 63 kVA SMC DT Metering Box of dimension H=700mm,W=480mm,D=210mm including all cabling and wiring terminations at both incoming and outgoing ends and using suitable fixing and mounting arrangements complete as per industrial standards as per site conditions is a manner as directed by Section Engineer in charge at site Note: SMC DT Metering box alone will be supplied Departmentally | — | 1.00 | — | — | |
| — | — | — | Above/ 2320.00 Below/P | ||
| Installation,Testing and commissioning of 80 W LED street fittings using suitable GI tubular mounting arm bent to act as tubular support for anchoring arrangement onto walls including supply connection from ceiling rose/junction box or elsewhere by using 3 core 1.5 sq. mm Fire retardant low smoke PVC insulated, PVC round sheathed copper [White/Ivory colour] conductor flexible chord conforming to IS:694/1990 or latest as per industrial standards in a manner as directed by Section Engineer in charge at site. Note: 80W LED street light fittings alone will be supplied departmentally. | — | 10.00 | — | — | |
| — | — | — | Above/ 2072.00 Below/P | ||
| Installation, Testing and commissioning of 90 W LED street fittings using suitable GI tubular mounting arm bent to act as tubular support for anchoring arrangement onto walls including supply connection from ceiling rose/junction box or elsewhere by using 3 core 1.5 sq. mm Fire retardant low smoke PVC insulated, PVC round sheathed copper [White/Ivory colour] conductor flexible chord conforming to IS:694/1990 or latest as per industrial standards in a manner as directed by Section Engineer in charge at site. Note: 90W LED street light fittings alone will be supplied departmentally. | — | 8.00 | — | — | |
| — | — | — | Above/ 2590.00 Below/P | ||
| Installation, Testing and commissioning of 200 W LED Flood light fittings using suitable GI tubular mounting arm bent to act as tubular support for anchoring arrangement onto walls including supply connection from ceiling rose/junction box or elsewhere by using 3 core 1.5 sq. mm Fire retardant low smoke PVC insulated ,PVC round sheathed copper[White/Ivory colour] conductor flexible chord conforming to IS:694/1990 or latest as per industrial standards in a manner as directed by Section Engineer in charge at site. Note: 200W LED Flood light fittings alone will be supplied departmentally | — | 10.00 | — | — | |
| — | — | — | Above/ 2815.00 Below/P | ||
| Installation, assembly comprising of : - a)1 No. timer switch with daily setting similar to L&T catalogue reference J648B1 [FM1 Quartz]. b)1 No. 3 pole 25A power contactor conforming to IS: 13947/P4/1993 or latest, c)1 No. 40A DP [MCB type] isolator conforming to IS: 13947/P3/1993 or latest, d)1 No. Neutral link etc. e)1 No. Earth link etc. f) Suitable rated control fuses all duly pre-wired and mounted on an appropriate sized well-seasoned wooden plank of thickness not less than 12 mm and duly housed into and powder coat finished enclosure of size not less than 300mm X 450mm X 300mm and made of 2mm thick Sheet Steel complete and provision of the same onto the wall or elsewhere using suitable fixing arrangements complete and in a manner as directed by Section Engineer in charge at site. Note: Timer switch, Power contactor, MCB, Neutral Link, Earth link, fuses, wooden box, Enclosures alone will be supplied Departmentally. | — | 5.00 | — | — | |
| — | — | — | Above/ 2170.00 Below/P | ||
| Installation, Testing and commissioning of 45 W LED street fittings using suitable GI tubular mounting arm bent to act as tubular support for anchoring arrangement onto walls including supply connection from ceiling rose/junction box or elsewhere by using 3 core 1.5 sq. mm Fire retardant low smoke PVC insulated, PVC round sheathed copper [White/Ivory colour] conductor flexible chord conforming to IS:694/1990 or latest as per industrial standards in a manner as directed by Section Engineer in charge at site. Note: 45W LED street light fittings alone will be supplied departmentally. | — | 14.00 | — | — | |
| — | — | — | Above/ 1251.00 Below/P | ||
| Installation, Testing and commissioning of 100A , FP,MCCB with Enclosure onto wall o r elsewhere using suitable angle iron frame work and mounting and fixing arrangements as per industrial standards including all wiring and cable termination works at both Incoming and outgoing sides complete in a manner as directed by Section Engineer in charge at site. Note: 100A, FP, MCCB with Enclosure alone will be supplied Departmentally. | — | 3.00 | — | — | |
| — | — | — | Above/ 128.00 Below/P | ||
| Installation, Testing and commissioning of 40A , FP,RCBO with Enclosure onto wall or elsewhere using suitable angle iron frame work and mounting and fixing arrangements as per industrial standards including all wiring and cable termination works at both Incoming and outgoing sides complete in a manner as directed by Section Engineer in charge at site. Note: 40A, FP, RCBO with Enclosure alone will be supplied Departmentally. | — | 4.00 | — | — | |
| — | — | — | Above/ 19680.00 Below/P | ||
| Installation, Testing and commissioning of SMC box assembly similar to Sintex Catalogue reference No.GSJB- 1414 along with strip connector block, Neutral link, fuse bases and carriers onto lamp posts or elsewhere suing suitable clamping arrangements complete and in a manner as directed by Section Engineer incharge at site Note: SMC GSJB-1414 box, strip connector , neutral link, Earth link ,Fuse bases and fuse carriers, MS clamping arrangements alone will be supplied Departmentally. | — | 160.00 | — | — | |
| — | — | — | Above/ 4608.00 Below/P | ||
| Installation, Testing and commissioning of SMC box assembly similar to Sintex Catalogue reference No.GSJB- 3020 along with strip connector block, Neutral link, fuse bases and carriers onto lamp posts or elsewhere suing suitable clamping arrangements complete and in a manner as directed by Section Engineer incharge at site Note: SMC GSJB-3020 box, strip connector , neutral link, Earth link ,Fuse bases and fuse carriers, MS clamping arrangements alone will be supplied Departmentally. | — | 36.00 | — | — | |
| — | — | — | Above/ 232800.00 Below/P | ||
| Supply and laying of RCC pipe of 150mm internal diameter and 25mm thick with suitable collar conforming to NP2 class as per IS No:458 including jointing using gunny bag and cement grouting complete including all works and materials required for successful commissioning as per site conditions and in a manner as directed by Section Engineer Incharge at site. | — | 600.00 | — | — | |
| — | — | — | Above/ 3684.00 Below/P | ||
| Erection, Testing and commissioning of 5HP Non clog submersible sewage pump Set complete with control panel suitable for operation on three phase AC supply along with all accessories including fixing and mounting arrangements and other items required for successful commissioning of pump complete as per site conditions and as per industrial standards in a manner as directed by Section engineer in charge at site. Pipes required as per site conditions upto length of 5m is covered under contractor's scope. Note:5 HP Non Clog Submersible Sewage pump with Control panel assembly alone will be supplied Departmentally | — | 2.00 | — | — | |
| — | — | — | Above/ 3600.00 Below/P | ||
| Installation, testing and commissioning of 16W three dimensional type LED light fittings for pit lighting/catwalk lighting using suitable mounting and fixing arrangements as per industrial standards including power supply connection from ceiling rose by using 3 core 1.5 sq. mm Fire retardant low smoke PVC insulated, PVC round sheathed copper conductor flexible chord conforming to IS:694/1990 or latest in a manner as directed by Section Engineer in charge at site. Note: 16W 3D LED light fittings alone will besupplied departmentally. | — | 18.00 | — | — | |
| — | — | — | Above/ 2112.00 Below/P | ||
| Installation, testing and commissioning of Control panel unit containing 3 Nos SMPS Power supply units enclosed in Polycarbonate enclosure with all connected safety accessories, indication& controls ,dedicated for the High power LED based 16W LED Pit/Catwalk lights as per standard industrial practices including power supply connections complete in a manner as directed by Section Engineer in charge at site. Note: Control panel assembly alone will be supplied Departmentally. | — | 3.00 | — | — | |
| — | — | — | Above/ 2770.00 Below/P | ||
| Installation, Testing and commissioning of 200W LED HighBay light fittings using suitable mounting and fixing arrangements as per industrial standards including supply connection from ceiling rose/junction box or elsewhere by using 3 core 1.5 sq. mm Fire retardant low smoke PVC insulated, PVC round sheathed copper [White/Ivory colour] conductor flexible chord conforming to IS:694/1190 or latest complete in a manner and as per industrial standards as directed by Section Engineer in charge at site. Note: 200W LED HighBay light fitting alone will be supplied departmentally. | — | 10.00 | — | — | |
| — | — | — | Above/ 740.00 Below/P | ||
| InstaIIation , Testing and commissioning of the 400mm sweep BLDC Wall Mounting fan onto the buildings or elsewhere using suitable clamping and fixing arrangement complete as per industrial practices including supply connection from ceiling rose by using 3 core 1.5 sq. mm fire retardant Low smoke PVC insulated, PVC round sheathed copper [White/ Ivory colour] conductor flexible pendant chord conforming to IS:694/1990 or latest complete as per industrial standards and in a manner as directed by Senior Section Engineer in charge at site. Note: 400mm sweep BLDC Wall Mounting fan alone will be supplied departmentally | — | 4.00 | — | — | |
| — | — | — | Above/ 512.00 Below/P | ||
| Installation, Testing and commissioning of Mobile charging assembly of size (360x300x100 mm) made of CRCA sheet with minimum thickness 1.2mm consisting of 6A 1 way switch and 6A sockets along with 25A,30 mA, DP,RCCB with suitable fixing arrangements complete in a suitable manner as directed by Section Engineer in-charge at site Note: Mobile charging assembly alone will be supplied Departmentally | — | 8.00 | — | — | |
| — | — | — | Above/ 2121980.00 Below/P | ||
| Design, manufacture, supply (at site) of 20 metre high mast system of hot tip galvanized complete with head frame assembly, lantern carriage, double drum winch, stainless steel wire rope, suitable control panel, timer switch, twin dome aviation obstructing fittings suitable for high mast including lamps, electrical cable, 9 Nos of 200w high efficient LED flood light fittings with 9 Numbers of Arms and (as per specification enclosed) etc., and other standard accessories as per specification enclosed including integrated power tool with reversible electric motor and foundation bolts manufactures from special steel along with nuts, washers of suitable size of anchor plate and template and erection, testing and commissioning of the above high mast as per specification enclosed on the RCC foundation by using modern engineering practice by crane / derrick system complete as per industrial standards in a manner as directed by Section Engineer in charge at site. Note: 1)200w flood light fittings and accessories shall be as per specification enclosed. 2)High Mast Foundation Drawing is enclosed for reference purpose only .Original High Mast Drawing should be submitted by Contractor along with Soil test Report 3)Ten percentage of overall quoted Bid Rate for each High Mast is considered as cost of LED fixtures. Warranty/Guarantee/Deferred Payment clause for LED fixtures will be dealt accordingly as mentioned in Tender Document 4)Remaining Ninety percentage of overall quoted Bid Rate for each High Mast is considered as High Mast cost .Warranty/Guarantee clause for High Mast will be dealt accordingly as mentioned in Tender Document | — | 4.00 | — | — | |
| — | — | — | Above/ 2920.00 Below/P | ||
| Installation, Testing and commissioning of 18W Recess LED light fitting suitable to work on 240V single phase 50 Hz AC with lamp and all standard accessories using suitable mounting and fixing arrangement as per industrial practices including supply connection from ceiling rose by using 3 core 1.5 sq. mm Fire Retardant Low Smoke PVC insulated, PVC round sheathed copper [White/Ivory colour] conductor flexible pendant chord conforming to IS:694/1990 or latest in a manner as directed by Senior Section Engineer in charge at site. Note: 18W Recess LED light fitting with lamp alone will be supplied Departmentally | — | 20.00 | — | — | |
| — | — | — | Above/ 7344.00 Below/P | ||
| Installation, Testing and commissioning of Storage Drinking Water Cooler, 150 Litre Capacity, Power factor 0.85, Stainless Steel Water Tank with PUF insulation, Eco Friendly Refrigerant, water tank cover GI sheet with Epoxy painted conforming to Is 1475 Latest into the gage using suitable fixing and mounting arrangements complete as per industrial standards using contactors men and materials including transportation in a manner complete as directed by Section Engineer in charge at site. Note: Water cooler alone will be supplied Departmentally. | — | 3.00 | — | — | |
| — | — | — | Above/ 5204.00 Below/P | ||
| Erection, Testing and commissioning of 8 way Floor Mounting Type MCCB DB with 100A/200A,FP,MCCB's as Incomer along with 32A/63A/100A,FP,combination of MCCB's as outgoing including all cable termination at both Incoming and Outgoing sides complete and as per industrial practices complete in a manner as directed by Senior Section Engineer in charge at site. Note: MCCB DB, ,MCCB alone will be supplied Departmentally | — | 2.00 | — | — | |
| — | — | — | Above/ 13020.00 Below/P | ||
| Installation, Testing and commissioning of SMC box assembly similar to Sintex Catalogue reference No.GSJB- 7450 along with strip connector block, Neutral link, fuse bases and carriers onto lamp posts or elsewhere suing suitable clamping arrangements complete and in a manner as directed by Section Engineer incharge at site Note: SMC GSJB-7450 box, strip connector , neutral link, Earth link ,Fuse bases and fuse carriers, MS clamping arrangements alone will be supplied Departmentally. | — | 30.00 | — | — | |
| — | — | — | Above/ 1260.00 Below/P | ||
| Erection and commissioning of Cable encasing pipe of 'B' class GI pipes 50mm Dia including one number of clamp made out of MS flat of 40mm x6mm size, one per meter length of pipe and cable sealing compound units open end where ever required and as directed by Engineer in charge at site.Note: 50mm Dia 'B' class GI Pipe alone will be supplied Departmentally. | — | 70.00 | — | — | |
| — | — | — | Above/ 9000.00 Below/P | ||
| Laying/leading of 4 core 16 sq.mm LTUG Aluminium cable in the excavated trench, threading through pipe, clamping on walls and terminating in as many ends using suitable single compression cable glands, lugs , sockets and other items required complete as per site conditions in a manner complete as directed by Section Engineer in charge at site. Note:- 4Cx16 sq.mm LTUG Aluminium Cable alone will be supplied departmentally | — | 300.00 | — | — | |
| — | — | — | Above/ 30000.00 Below/P | ||
| Laying/leading of 4 core 120 sq.mm LTUG Aluminium cable in the excavated trench, threading through pipe, clamping on walls and terminating in as many ends using suitable single compression cable glands, lugs , sockets and other items required complete as per site conditions in a manner complete as directed by Section Engineer in charge at site. Note:- 4Cx120 sq.mm LTUG Aluminium Cable alone will be supplied departmentally | — | 600.00 | — | — | |
| — | — | — | Above/ 28200.00 Below/P | ||
| Laying of 110 mm dia High Density Polyethylene pipes in the excavated trench, clamping on walls / Steel members of platform shelter or elsewhere using suitable GI fixing arrangements and couplers and other accessories required at appropriate locations as per site conditions so that cable can be easily inserted and removed wherever need arises complete in a manner as directed by Senior Section Engineer-in-charge at site. Note: 110mm dia HDPE pipe alone will be supplied departmentally. | — | 600.00 | — | — | |
| — | — | — | Above/ 1660.00 Below/P | ||
| Installation ,Testing and commissioning of modular frame plate with matching Cover plate including and suitable for 3 modules, switches, sockets, blank plates etc. and 1 No DP modular type Miniature Circuit Breaker duly accommodated onto suitable modular switch board box complete and recess mounting/ concealing the same onto the wall using suitable fixing arrangements including cutting/ chipping/ making recess on the wall or elsewhere including all wiring works complete ,replastering painting etc., complete and in a manner as directed by Senior Section Engineer in charge at site. Note: -3 module Frame plate with matching cover plate, DP modular type MCB, switch, socket and Modular GI box alone will be Supplied Departmentally. | — | 20.00 | — | — | |
| — | — | — | Above/ 1826.00 Below/P | ||
| Installation ,Testing and commissioning of modular frame plate with matching Cover plate including and suitable for 2 modules, switches, sockets, blank plates etc. and 1 No DP modular type Miniature Circuit Breaker duly accommodated onto suitable modular switch board box complete and recess mounting/ concealing the same onto the wall using suitable fixing arrangements including cutting/ chipping/ making recess on the wall or elsewhere including all wiring works complete ,replastering painting etc., complete and in a manner as directed by Senior Section Engineer in charge at site. Note: -2 module Frame plate with matching cover plate, DP modular type MCB, switch, socket and Modular GI box alone will be Supplied Departmentally. | — | 22.00 | — | — | |
| — | — | — | Above/ 3744.00 Below/P | ||
| Installation, Testing and commissioning of metal junction box(switch board of size 200mmx150mmx50mm fabricated with 16 gauge steel an provided with 3mm thick decolam sheet top, knockout, and recess mounting/ concealing the same onto the wall using suitable fixing arrangements including cutting/ chipping/ making recess on the wall or elsewhere including including all wiring works complete replastering painting etc., complete and in a manner as directed by Senior Section Engineer in charge at site Note: Metal junction box alone will be Supplied Departmentally. | — | 72.00 | — | — | |
| — | — | — | Above/ 738.00 Below/P | ||
| Installation, Testing and commissioning of the 10W range LED Reading Light onto walls elsewhere including supply connection from ceiling rose by using 3 core 1.5 sq. mm fire retardant Low smoke PVC insulated, PVC round sheathed copper [White / Ivory colour] conductor flexible pendant chord conforming to IS:694/1990 or latest complete including cutting/chipping and replastering and bringing back walls to original condition including painting in a manner as directed by section engineer in charge at site Note: 10W range Reading light alone will be supplied departmentally. | — | 18.00 | — | — | |
| — | — | — | Above/ 738.00 Below/P | ||
| Installation, Testing and commissioning of the 3W LED Foot Light onto walls elsewhere including supply connection from ceiling rose by using 3 core 1.5 sq. mm fire retardant Low smoke PVC insulated, PVC round sheathed copper [White / Ivory colour] conductor flexible pendant chord conforming to IS:694/1990 or latest complete including cutting/chipping and replastering and bringing back walls to original condition including painting in a manner as directed by section engineer in charge at site. Note: 3W LED Foot light alone will be supplied departmentally. | — | 18.00 | — | — | |
| — | — | — | Above/ 1260.00 Below/P | ||
| Installation, Testing and commissioning of 9W Recess LED light fitting suitable to work on 240V single phase 50 Hz AC with lamp and all standard accessories using suitable mounting and fixing arrangement as per industrial practices including supply connection from ceiling rose by using 3 core 1.5 sq. mm Fire Retardant Low Smoke PVC insulated, PVC round sheathed copper [White/Ivory colour] conductor flexible pendant chord conforming to IS:694/1990 or latest in a manner as directed by Senior Section Engineer in charge at site. Note: 9W Recess LED light fitting with lamp alone will be supplied Departmentally | — | 18.00 | — | — | |
| — | — | — | Above/ 1260.00 Below/P | ||
| Installation, Testing and commissioning of 12W Recess LED light fitting suitable to work on 240V single phase 50 Hz AC with lampand all standard accessories using suitable mounting and fixing arrangement as per industrial practices including supply connection from ceiling rose by using 3 core 1.5 sq. mm Fire Retardant Low Smoke PVC insulated, PVC round sheathed copper [White/Ivory colour] conductor flexible pendant chord conforming to IS:694/1990 or latest in a manner as directed by Senior Section Engineer in charge at site. Note: 12W Recess LED light fitting with lamp alone will be supplied Departmentally | — | 18.00 | — | — | |
| — | — | — | Above/ 3040.00 Below/P | ||
| Installation, Testing and commissioning of 36W Recess LED light fitting suitable to work on 240V single phase 50 Hz AC with lampand all standard accessories using suitable mounting and fixing arrangement as per industrial practices including supply connection from ceiling rose by using 3 core 1.5 sq. mm Fire Retardant Low Smoke PVC insulated, PVC round sheathed copper [White/Ivory colour] conductor flexible pendant chord conforming to IS:694/1990 or latest in a manner as directed by Senior Section Engineer in charge at site. Note: 36W Recess LED light fitting with lamp alone will be supplied Departmentally | — | 16.00 | — | — | |
| — | — | — | Above/ 576.00 Below/P | ||
| Installation, Testing and commissioning of 5-8W Mirror LED light fitting as per specification enclosed suitable to work on 240V single phase 50 Hz AC with lamp and all standard accessories using suitable mounting and fixing arrangements complete as per industrial practices including supply connection from ceiling rose by using 3 core 1.5 sq. mm Fire Retardant Low Smoke PVC insulated, PVC round sheathed copper [White/Ivory colour] conductor flexible pendant conforming to IS:694/1990 or latest in a manner as directed by Senior Section Engineer in charge at site. Note: 5-8W Mirror light alone will be supplied Departmentally | — | 18.00 | — | — | |
| — | — | — | Above/ 270.00 Below/P | ||
| Installation, Testing and Commissioning including concealing work along with metal clad plug and socket unit in sheet steel enclosure conforming to IS: 8623/1993 or latest complete as per industrial practices with 1 No. 25 A,DP, RCBO onto the walls including cutting/chipping and replastering and bringing back walls to original condition including painting in a manner as directed by section engineer in charge at site. Note: Metal clad plug and socket with Enclosure and RCBO alone will be supplied Departmentally. | — | 5.00 | — | — | |
| — | — | — | Above/ 2602.00 Below/P | ||
| Erection, Testing and commissioning of 6 way Floor Mounting Type MCCB DB with125A,FP,MCCB as Incomer along with 6 No's 63A/32A,FP,combination of MCCB's as outgoing including all cable termination at both Incoming and Outgoing sides complete and as per industrial practices completein a manner as directed by Senior Section Engineer in charge at site. Note: MCCB DB, ,MCCB alone will be supplied Departmentally | — | 1.00 | — | — | |
| — | — | — | Above/ 12240.00 Below/P | ||
| Drawing of inside mains using 4 runs of 6 sq. mm [from MCB DB to switch boards and from switch boards to switch boards / modular furniture or elsewhere] multi stranded copper conductor cables duly inside the PVC conduit concealed / laid vide item No. 17 above complete as per the specification enclosed and in a manner as directed by Senior Section Engineer in charge at site. Note: - 4 runs of 6 sq. mm copper cable are taken as 1m for quantity purpose and will be supplied Departmentally. | — | 360.00 | — | — | |
| — | — | — | Above/ 2140.00 Below/P | ||
| Erection, testing and commissioning of Electric water heater-Geyser with Tank capacity 25 litres including all mounting accessories and other items required complete as per site conditions and as per industrial standards in an approved manner and as directed by Engineer in charge at site. Note: 25 Litres Electric water heater only will be supplied Departmentally Erection, testing and commissioning of Electric water heater-Geyser with Tank capacity 25 litres including all mounting accessories and other items required complete as per site conditions and as per industrial standards in an approved manner and as directed by Engineer in charge at site. Note: 25 Litres Electric water heater only will be supplied Departmentally | — | 5.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Checklist.pdf
ATTACHMENT
GCC2022.pdf
ATTACHMENT
GCCIRSGCC1-11_compressed12.pdf
ATTACHMENT
ImportantinstructionstoTenderers.pdf
ATTACHMENT
NEFTFORM.pdf
ATTACHMENT
Undertakings.pdf
ATTACHMENT
Earthing6.pdf
ATTACHMENT
EarthingType10326.pdf
ATTACHMENT
HighMastDrawing4.pdf
ATTACHMENT
HighMastSpecification8.pdf
ATTACHMENT
LEDspecification-SELSpecPower2-20156.pdf
ATTACHMENT
LocationsList3.pdf
ATTACHMENT
MCBDrawing6.pdf
ATTACHMENT
MSBracketsDiagram4.pdf
ATTACHMENT
SpecificationforlayingUndergroundcable6.pdf
ATTACHMENT
specificationforwiringandrewiring6.pdf
ATTACHMENT
TSQtyBreakupDetails.pdf
ATTACHMENT
GeneralinstructionstoTenderers601224_1.pdf
ATTACHMENT
SpecialconditionsofContractElectrical601224_1.pdf SPL CON for CONTRACT ELECRICAL
ATTACHMENT
Paymentclauseasper2026.pdf
ATTACHMENT
SpecialconditionsofContractElectrical601224_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .