Tender Value
₹86.1 L
EMD Value
₹1.7 L
Closing Date
11 Sept 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TENDER
15 conditions · 4 needing a document upload
Financial Eligibility Criteria : The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Similar nature of work: - "Works of wiring /cabling or installation and commissioning of electrical items (other than on coaches) such as lights, fans, pumps, charging arrangements earthings etc. (with or without supply of items/equipments) for 230 V, 1 phase or 415 V, 3 phase system or higher voltages." (Ref: Hqrs Lr.No:E.29/P/Similar nature of works Dt: 30.12.2014.)
Technical Eligibility Criteria: (a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender.
Eligibility Criteria: For Electrical Works up to 650 V : The tenderer shall possess a valid Electrical Contractor License, issued by any State Government or Union Territory Administration, authorizing execution of electrical works up to 650 V. The contractor shall have in his employment or shall engage a person holding a valid certificate of competency issued by any State Government or Union Territory Administration for supervision of electrical works up to 650 V. Offers not accompanied by a valid Electrical Contractor License and requisite Supervisor competency for works up to 650 V shall be summarily rejected. (Ref: Hqrs Lr.No:E.29/P/Similar nature of works Dt: 07.05.2026.)
37 conditions · 4 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The General Conditions of Contract governing the performance of the works covered by this tender are the Indian Railway Standard General Conditions of Contract as amended from time to time up to date. A soft copy of the Indian Railway Standard General conditions of Contract is uploaded in the annexed documents to the tender. Hard copy may be perused in the office of the Senior Divisional Electrical Engineer/Maintenance/ Secunderabad Division/ South Central Railway / Secunderabad - 500025. In submitting the tender it would be deemed that the tenderer has kept himself fully Informed of the provision of the Indian Railways Standard General Conditions of Contract including all corrections and Amendments issued upto date and claim that he is not aware of any amendment or correction slip to the IRSGCC shall not be entertained.(As per IRGCC April 2022 or latest with amendments).
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Senior Divisional Electrical Engineer/Maintenance/ Secunderabad Division/ South Central Railway/ Secunderabad - 500025. It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.(As per IRGCC April 2022 or latest with amendments).
DRAWINGS FOR WORKS: The percentage rates for the schedule items and itemized rates for the non-scheduled items quoted by the tenderer as may be accepted by the railways will, hold good irrespective of any changes, modifications, alterations, additions, omissions in the locations of structures and detailed drawings, specifications and/or the manner of executing the work. It should be specifically noted that some of the detailed drawings may not have been finalised by the Railway and will, therefore, be supplied to the contractor as and when they are finalised on demand. No compensation whatsoever on this account shall be payable by the Railway Administration. No claim whatsoever will be entertained by the Railway on account of any delay or hold up of the works arising out of delay in approval of drawings, changes, modifications, alterations, additions, omission and the site layout plans or detailed drawings and design and/or late supply of such material as are required to be arranged by the Railway or due to any other factor on Railway Accounts.(As per IRGCC April 2022 or latest with amendments).
Manual tenders sent by Post/FAX/Courier or in Person SHALL NOT BE ACCEPTED (As per IRGCC April 2022 or latest with amendments).
If the Bid of a Tenderer is seriously unbalanced in relation to the Engineer's estimate of the cost of work to be performed under the contract, the Railways may require the tenderer to produce detailed price analysis for any or all items of the Tender Schedule, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed. (As per IRGCC April 2022 or latest with amendments).
CORRIGENDUM NOTICE ON IREPS: [I] Railway may modify the tender document by issuing online corrigendum through www.ireps.gov.in [II] Prospective Bidders shall keep watch for CORRIGENDUM upto 15 days prior to the deadline for submission of bids. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer. [III] To give prospective bidders a reasonable time on account of CORRIGENDUM in preparing their bids, the Railways may at their discretion extend as necessary, the deadline for submission of Tender document. Railways decision will be final and no correspondence will be entertained from prospective bidders. (As per IRGCC April 2022 or latest with amendments).
E-Tender shall be rejected if it is not accompanied by the prescribed: [1] Cost of tender document [2] EMD [3] Certificate(s) in support of technical eligibility criteria [4] Certificate(s) in support of financial eligibility criteria [5] Copy of documents in support of Proprietary concern/ Partnership firm / Pvt.Ltd.company / Limited Company / JV firm / Valid MOU for JV firms as detailed in COMMERCIAL COMPLIANCE. (As per IRGCC April 2022 or latest with amendments).
The bidders/tenderers should ensure that they are GST compliant. Quoted rates are inclusive of applicable GST as per GST ACT -2017 amended from time to time and as detailed in Special Conditions - General (under TAXES clause). (As per IRGCC April 2022 or latest with amendments).
The tenderer[s] may also upload the following documents alongwith his/their tender: The tenderer may upload method statement, which shall contain organizational set up and working systems to be adopted by the successful tenderers during the operation of the contract. It shall contain the details of man power and machineries in the prescribed format and details of methodology for planning, execution, monitoring and completion of the project. The methodology so adopted shall suit to the nature of work and shall also comply fully with best practice and current regulations. A comprehensive detailing for each activity like setting-up organization, safety plan, execution plan, quality assurance plan, sequence of work to achieve the mile stones, ensure targeted progress and quality and inturn deployment of resources, risk analysis and its mitigation strategy shall be given communication arrangement within his organization and with the railways for decisions, progress or any other matter connected with this project to ensure full information about the project including progress of work at different time scale shall also be furnished. (As per IRGCC April 2022 or latest with amendments).
Tenderer shall adhere to the time frame as mentioned in mile stone chart prescribed in the tender. (As per IRGCC April 2022 or latest with amendments).
Tenderer shall engage the personnel with requisite qualification as per Special Conditions of Contract. (As per IRGCC April 2022 or latest with amendments).
Tenderer shall deploy adequate number of plant and equipment for the execution of subject contract works to achieve progress as per mile stone chart. (As per IRGCC April 2022 or latest with amendments).
List of works completed in the last seven financial years giving description of work, organization for whom executed, approximate value of contract at the time of award, date of award and date of scheduled completion of work. Date of actual start, actual completion and final value of contract should also be given. (As per IRGCC April 2022 or latest with amendments).
List of works on hand indicating description of work, contract value, and approximate value of balance work yet to be done and date of award. (As per IRGCC April 2022 or latest with amendments).
Supportive documents/certificates from the organizations with whom they worked/are working as list of works completed and list of works on hand should be enclosed. (As per IRGCC April 2022 or latest with amendments).
[1] I/We have read the various conditions of the tender attached hereto and hereby agree to abide by the said conditions. I/We also agree to keep this tender open for acceptance for the period mentioned in the tender document [NIT HEADER] from the date fixed for opening the same and in default thereof, I/We will be liable for forfeiture of my/our Earnest Money Deposit submitted. [2] I/We offer to do the work at the percentage rates quoted by me/us in the attached schedule and bind myself/ourselves to complete the work within the period of completion given in this tender document [NIT HEADER] from the date of issue of letter of acceptance of this tender. I/We also hereby agree to abide by the IRS GCC and Special Conditions of contract in carryingout the works laid down by South Central Railway for the present contract. [3] The full value of the earnest money paid shall stand forfeited without prejudice to any other rights or remedies of the railway if [a]I/We do not execute the contract document within seven days after receipt of notice issued by the Railway that such documents are ready: OR [b] I/We do not commence the work within fifteen days after receipt of orders to that effect. [4] Until a formal agreement is prepared and executed, acceptance of this tender shall constitute a binding contract between us subject to modifications, as may be mutually agreed to between us and indicated in the letter of acceptance of my/our offer for this work. (As per IRGCC April 2022 or latest with amendments).
I/We fail to submit the requisite Performance Guarantee [P.G] in the prescribed format within the time limit as prescribed in GCC (as amended from time to time) from the date of issue of Letter of Acceptance, we are aware that the contract shall be terminated duly forfeiting EMD and other dues, if any payable against the contract. Also, I/We shall be debarred from participating in the retender for the work. (As per IRGCC April 2022 or latest with amendments).
I/We understand that no post-tender correspondence will be entertained, however, if any clarification is required by the Railway, the same will be sought from the tenderer. Also, I/We are aware that any Certificate/ Documents offered after the tender opening shall not be given any credit and shall not be considered. (As per IRGCC April 2022 or latest with amendments).
I/we do hereby solemnly affirm and state on behalf of the tenderer including its constituents as under: (As per IRGCC April 2022 or latest with amendments).
[i] I/We the tenderer(s) am/are signing this document after carefully reading the contents. [ii] I/We declare and certify that I/We have not made any misleading or false representation in the documents, forms, statements attached in proof of the qualification requirements. [iii] I/We also understand that my/our offer will be evaluated based on the documents/credentials uploaded alongwith the offer and the same shall be binding upon me/us. [iv] I/We declare that the information and the documents attached alongwith the tender by me/us are correct and I/We are fully responsible for the correctness of the information and the documents submitted by us. (As per IRGCC April 2022 or latest with amendments).
[i] I/We do hereby undertake that, if any of the certificates regarding eligibility criteria submitted by us are found to be forged/false/incorrect at any time during the process of evaluation of the tenders, it shall lead to forfeiture of the tender EMD. Further, I/We and all my/our constituents understand that my/our offer shall be summarily rejected. [ii] I/We also understand that, if the certificates submitted by us are found to be false/forged/ incorrect at any time after the award of the contract, it will lead to termination of the contract besides suspending of business for 5 years, with the tenderer and with all the partners in case of partnership firm and with all the members of a JV in case of a Joint Venture, forfeiture of EMD/SD and Performance Guarantee and any other action provided in the contract. (As per IRGCC April 2022 or latest with amendments).
It is certified that I/We have not been blacklisted or debarred by railways or any other ministry/ department/public sector undertaking of the government of India/State Government from participation in tenders/contract on the date of tender opening of bids, either in individual capacity or as a member of JV firm in which I/We were/are members. (As per IRGCC April 2022 or latest with amendments).
I/We indemnify and save harmless the Railway from and against all actions, suit proceedings losses, costs, damages, charges, claims and demands of every nature and description brought or recovered against the Railways by reason of any act or omission of the Contractor, his agents or employees, in the execution of the works or in his guarding of the same. All sums payable by way of compensation under any of these conditions shall be considered as reasonable compensation to be applied to the actual loss or damage sustained, and whether or not any damage shall have been sustained. (As per IRGCC April 2022 or latest with amendments).
The prices are inclusive of GST
Secunderabad Division Electrical Maintenance Department - Provision of longer loop line, RBG Building & Goompty at RMY station -Electrical Arrangements.
E-M-SC-31-OT-2026-27~SCR
E-M-SC-31-OT-2026-27
Open
Works - General
6 Months
Hyderabad, Telangana
₹0
₹1.7 L
13 Aug 2026
13 Aug 2026
28 Aug 2026
173 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 86,06,118.5 | ||
| — | 5000.00 | — | — | ||
| Excavation of cable trench in all types of soils for LT cable as per the directions of engineer at site. | — | — | — | 6,50,000 | |
| — | 50.00 | — | — | ||
| Excavation of cable trench incement concrete bed flooring as per the Rly specification No:C/E/UGC/1/92& Drg No:SC/A3/STD/1288 Alt-I | — | — | — | 20,250 | |
| — | 3.00 | — | — | ||
| Concrete for foundations and plinth in hard soil. | — | — | — | 12,876 | |
| — | 100.00 | — | — | ||
| Horizontal drilling of bores for LT cables | — | — | — | 1,26,900 | |
| — | 2000.00 | — | — | ||
| Supply and erection of 4 core x 150 Sqmm LTUG XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or(latest amendments ) along with end terminations | — | — | — | 20,15,860 | |
| — | 2000.00 | — | — | ||
| Supply and erection of 4 core x70 Sqmm LTUG XLPE Aluminum armored cable as per BIS specification IS 7098 Part I or (latest amendments ) along with end terminations | — | — | — | 11,14,000 | |
| — | 2000.00 | — | — | ||
| Supply and erection of 4 core x16 Sqmm LTUG XLPE Aluminium armoured cable as per BIS specification IS 7098 Part I or (latest ammendements ) along with end terminations | — | — | — | 3,52,000 | |
| — | 1500.00 | — | — | ||
| Cutting and chipping the wall for laying the PVC conduit pipe and plastering after laying the PVC conduit pipe with cement and sand mortar mixed with 1:8 ratio, but without laying PVC conduit pipe. | — | — | — | 58,500 | |
| — | 6000.00 | — | — | ||
| Supply and erection of 8 SWG GI wire | — | — | — | 60,000 | |
| — | 20.00 | — | — | ||
| Supply and erection of Earthing arrangements | — | — | — | 69,960 | |
| — | 20.00 | — | — | ||
| Supply and Erection Provision of RCC earth pit hollow box of size 300 mm x 300 mm x 300mm with 50 mm wall thickness as per Drg. no. SDO/RDSO/E&B/001 by using M20 Grade precast RCC. It includes fixing of earth pits at various locations (All the required men, material and transportation are to be arranged by contractor) | — | — | — | 14,720 | |
| — | 20.00 | — | — | ||
| Supply and Erection of RCC precast slabs with hook to cover Earth pits of dimensions as shown in IRSEM drg no 19-D6. All the required materials for this work i.e. stones, cement, iron and sand etc. are to be supplied by contractor.) | — | — | — | 3,120 | |
| — | 2.00 | — | — | ||
| Design,fabrication,supply,erection,testing,Commissioning of Sheet Steel Enclosure indoor typer LT panel board (Powder coated RAL 7032 ) with suitable Busbar capacity including supply and fixing of digital votmeter, digitalammeter with CTS, indication lamps complete with all accossories, for housing of 2X250A FP MCCB-02 Nos , 2X200 FP MCCB, 4x100A 4P MCCBs, ,6x63A 4P MCCBs, 1x200Ax4 FP onload COS and Digital Multi functional panel metert etc. Note: Before fabrication drawing approval is to be taken from Sr.DEE/M/SC. All cables terminations to be done along with double compression glands and required lugs. as per the direction of Engineer at site. (Each panel is of 2CuM-01No) | — | — | — | 2,26,788 | |
| — | 2.00 | — | — | ||
| Supply and erection of 250A 4 pole MCCB with 36KA breaking capacity with LSIG Micro processor based release with extended Rotary handle, spereder links(4 nos-02 sets), phase barriers | — | — | — | 59,396 | |
| — | 2.00 | — | — | ||
| Supply and fixing of microprocessor type 200A 4P MCCB, 35kA breaking capacity with adjustable thermal release with extended Rotary handle, spereder links(4 nos-02 sets), phase barriers | — | — | — | 31,850 | |
| — | 2.00 | — | — | ||
| Supply and erection of 100A 4 pole MCCB with 25KA breaking capacity with Adjustable thermal magnetic release with extended Rotary handle, spereder links(4 nos-02 sets), phase barriers | — | — | — | 12,378 | |
| — | 4.00 | — | — | ||
| Supply and erection of 63A 4 pole MCCBs with 16 KA breaking capacity with Adjustable thermal magnetic release extended Rotary handle, spereder links(4 nos-02 sets), phase barriers | — | — | — | 16,140 | |
| — | 1.00 | — | — | ||
| Supply and erection of 200A 4P On-load Change over switch in open execution with complete with accessories etc. | — | — | — | 14,560 | |
| — | 1000.00 | — | — | ||
| Supply and erection of 110mm of HDPE pipesof Grade PE-100, PN 6(6Kg/Cm2 Capacity) withaccessories as per IS 4984 -2016 (SDR-21) | — | — | — | 4,19,000 | |
| — | 200.00 | — | — | ||
| Supply and erection of 63 mm of HDPE pipes ofGrade PE-100, PN 16 (6Kg/Cm2 Capacity) withaccessories as per IS 4984 - 1995 | — | — | — | 26,600 | |
| — | 2500.00 | — | — | ||
| Supply & Erection of 25mm PVC rigid conduit pipes of 2mm thickness as per BIS- 9537 (latest) along with accessories. | — | — | — | 72,500 | |
| — | 400.00 | — | — | ||
| Supply & Erection of 32mm PVC casing and capping on wall along with accessories. | — | — | — | 11,600 | |
| — | 3500.00 | — | — | ||
| Supply and Laying of 3Nos.. of 1.5 Sq.mm, of FRLS PVC insulated flexible multistrand copper wire including earth continuity wire . | — | — | — | 1,92,500 | |
| — | 2000.00 | — | — | ||
| Supply and Laying of 2 Nos.. of 2.5 Sq.mm, 1No. 1.5 sq.mm of FRLS PVC insulated flexible multistrand copper wire including earth continuity wire . | — | — | — | 1,44,000 | |
| — | 2000.00 | — | — | ||
| Supply and erection of 2Nos.. of 4.0 Sq.mm, 1No. 2.5 sq.mm of FRLS PVC insulated flexible multistrand copper wire including earth continuity wire . | — | — | — | 2,16,000 | |
| — | 500.00 | — | — | ||
| Supply and erection of 4No.s of 4.0 sq. mm, 1No. 2.5 sq.mm of FRLS PVC insulated flexible multistrand copper wire including earth continuity wire . | — | — | — | 82,500 | |
| — | 250.00 | — | — | ||
| Supply and erection of 4No.s of 10 sq. mm, 1No. 6 sq.mm of FRLS PVC insulated flexible multistrand copper wire including earth continuity wire . | — | — | — | 1,04,500 | |
| — | 6.00 | — | — | ||
| Supply & Erection of 1 or 2 module GI concealed sheet metal boxes | — | — | — | 222 | |
| — | 9.00 | — | — | ||
| Supply & Erection of 3 module GI concealed sheet metal boxes | — | — | — | 468 | |
| — | 10.00 | — | — | ||
| Supply & Erection of 6 module GI concealed sheet metal boxes | — | — | — | 850 | |
| — | 30.00 | — | — | ||
| Supply & Erection of 8 or 9 module GI concealed sheet metal boxes | — | — | — | 3,330 | |
| — | 30.00 | — | — | ||
| Supply & Erection of 12 module GI concealed sheet metal boxes | — | — | — | 4,110 | |
| — | 6.00 | — | — | ||
| Supply & Erection of 1 or 2 module modular plates with frame | — | — | — | 318 | |
| — | 9.00 | — | — | ||
| Supply & Erection of 3 module modular plates with frame | — | — | — | 594 | |
| — | 10.00 | — | — | ||
| Supply & Erection of 6 module modular plates with frame | — | — | — | 1,240 | |
| — | 30.00 | — | — | ||
| Supply & Erection of 8 or 9 module modular plates with frame | — | — | — | 4,770 | |
| — | 30.00 | — | — | ||
| Supply & Erection of 12 module modular plates with frame | — | — | — | 5,940 | |
| — | 1000.00 | — | — | ||
| Supply and erection of 10A 1-way switch | — | — | — | 44,000 | |
| — | 20.00 | — | — | ||
| Supply & Erection of 20A one way modular switch | — | — | — | 2,020 | |
| — | 100.00 | — | — | ||
| Supply & Erection of 10A multi socket for cell phone pin or 2pin +3 pin with safety shutter | — | — | — | 10,300 | |
| — | 20.00 | — | — | ||
| Supply & Erection of 6&20A twin socket heavy duty socket with safety shutter | — | — | — | 3,520 | |
| — | 50.00 | — | — | ||
| Supply and erection of BLDC fans with remote | — | — | — | 1,23,000 | |
| — | 10.00 | — | — | ||
| Supply and Erection of Modular type exhaust fan 300mm/380mm | — | — | — | 15,550 | |
| — | 200.00 | — | — | ||
| Supply and erection of Three terminal Ceiling rose. | — | — | — | 5,000 | |
| — | 65.00 | — | — | ||
| Supply & Erection of 6/10/16/20/25/32A, C-curve SP MCBs with 10KA breaking capacity | — | — | — | 9,035 | |
| — | 15.00 | — | — | ||
| Supply & Erection of 6/10/16/20/25/32A, C-curve DP MCBs with 10KA breaking capacity | — | — | — | 6,780 | |
| — | 50.00 | — | — | ||
| Supply and erection of 6/10/16/20/25/32A, C-curve TP MCBs with 10KA breaking capacity | — | — | — | 46,200 | |
| — | 6.00 | — | — | ||
| Supply and erection of 40A FP RCCB with 100/300mA sensitivity | — | — | — | 11,958 | |
| — | 8.00 | — | — | ||
| Supply & Erection of 25A DP RCCB with 30mAsensitivity | — | — | — | 17,304 | |
| — | 30.00 | — | — | ||
| Supply and erection of 50/63A, C-curve FP MCB with 10KA breaking capacity | — | — | — | 42,900 | |
| — | 10.00 | — | — | ||
| Supply & Erection of SMC 4 terminal junction Box with Accessories | — | — | — | 6,710 | |
| — | 8.00 | — | — | ||
| Supply and Erection of SPN 12 way Double door DB IP 54 protection. | — | — | — | 13,816 | |
| — | 30.00 | — | — | ||
| Supply and erection of 8 way Double door (SPN) distribution boards (Sleek type) | — | — | — | 27,360 | |
| — | 6.00 | — | — | ||
| Supply and Erection of 40A, C-curve FP MCB with10KA breaking capacity | — | — | — | 6,660 | |
| — | 20.00 | — | — | ||
| Supply, erection, connecting,testing and commissioning of 100W LED flood light fixture complete with necessary mounting accessories,clamps and hardware etc as per specification enclosed. | — | — | — | 79,100 | |
| — | 200.00 | — | — | ||
| Supply, erection, connecting, testing and commissioning of recess 15-18 W LED Round Down lighters with diffuser and electronic driver complete with necessary mounting accessories, clamps and hardware etcas per specification. | — | — | — | 1,27,600 | |
| — | 300.00 | — | — | ||
| Supply, erection,connecting, testing andcommissioning of integrated T8 20W LED (indoortype) tube light fixture complete with necessarymounting accessories, clamps and hardware etc. aspec specification | — | — | — | 1,23,600 | |
| — | 60.00 | — | — | ||
| Supply, erection, connecting, testing andcommissioning of 40W LED Street light luminariemade up of pressure die cast aluminum housingwith high efficiency LED as lighting source and lenswith toughened glass having bottom openingseparate driver compartment with IP 66 protectionsuitable to operate with necessary mountingaccessories, clamps and hardware etc as per specification | — | — | — | 94,500 | |
| — | 25.00 | — | — | ||
| Supply, erection,connecting, testing and commissioning of 60 W LED Street light luminarie made up of pressure die cast aluminum housing with high efficiency LED as lighting source and lens with toughened glass having bottom opening separate driver compartment with IP 66 protection suitable to operate with necessary mounting accessories, clamps and hardware etc as per specification | — | — | — | 70,250 | |
| — | 2.00 | — | — | ||
| Supply, fixing and connecting and commissioning of Weather proof terminal box with Bimetallicbus bar with clamp bolts nuts including all accessories etc. (For 25KVA As pervDRG No:E.252/ TrD/C/AT-JB/2024-02.Dated:16.07.2024 or latest Drawing enclosed. | — | — | — | 21,622 | |
| — | 2.00 | — | — | ||
| Supply and installation of 63A 2P MCB ,10 KA C curve obove Outdoor junction box | — | — | — | 2,978 | |
| — | 1.00 | — | — | ||
| Supply, fixing and connecting and commissioning of Weather proof terminal box with Bimetallicbus bar with clamp bolts nuts including all accessories etc. (for 10KVA AT as per DRG No:E.252/ TrD/C/AT-JB/2024-02. Dt :16.07.2024 or latest Drawing enclosed. | — | — | — | 10,811 | |
| — | 1.00 | — | — | ||
| Supply and installation of 160A 2P MCCB,10 KA C curve i n obove Outdoor junction box | — | — | — | 10,248 | |
| — | 15.00 | — | — | ||
| Erection of Railway poles | — | — | — | 6,930 | |
| — | 30.00 | — | — | ||
| Supply and erection of Sheet iron Junction Box for 4Core120/150/180 Sqmm Cable termination with 250Asuitable copper busbar capacity JB of size18x18"X12" | — | — | — | 2,34,000 | |
| — | 20.00 | — | — | ||
| Supply and erection of following sizes of 5 mtr hot dip galvanised double arm Conicle poles with foundation bolts, base plate, MCB & brackets. | — | — | — | 2,37,380 | |
| — | 100.00 | — | — | ||
| Supply and erection of 100 mm, 'B' class GI pipes as per IS:1239 along with accessories. | — | — | — | 78,200 | |
| — | 3.00 | — | — | ||
| Supply, fixing and connecting and commissioning of bimetalic junctionBox for CLS panel tosuit 10/25 KVA | — | — | — | 36,000 | |
| — | 2.00 | — | — | ||
| Design,Supply,Erection, testing and commissioing of 10KVA/240V/60A Automatic change overcontrol panel for color light signaling, 3 independent single phase 240V AC supplies with all related accessories -rotary selector switch with air break contactors,MCCBs, MCBs, LEDs,alarm buzzer, alarm reset micro switch etc,. As per RDSO latest specTI/SPC/CLS/0020 (12/02)( with A&C Slip no:l to 4)or latest if any | — | — | — | 96,020 | |
| — | 1.00 | — | — | ||
| Design,Supply,Erection, testing and commissioing of Automaticchange over control and distribution panel for CLS for 25 KVA capacity/ 150Amp RDSO latest specTI/SPC/CLS/0020 (12/02)( with A&C Slip no:1 to 4)or latest if any. | — | — | — | 1,47,572 | |
| — | 4.00 | — | — | ||
| Supply, installation, testing and comissioning of 5 star inverter type 2 Ton capacity split type Air conditioning unit complete, conforming to IS: 1391(Part-2)-1992 with amdts No.1 to 4 fitted with rotary compressor suitable for using HCFC refrigerant (R-22) for wall mounting as per specification enclosed. | — | — | — | 2,62,860 | |
| — | 20.00 | — | — | ||
| Supply of copper pipe 1/4" & 1/2" of 20 SWG along with 9 mm thickness insulation | — | — | — | 21,060 | |
| — | 20.00 | — | — | ||
| Supply of 1" CPVC Drain pipe with all connected accessories as per site requirement. | — | — | — | 2,900 | |
| — | 40.00 | — | — | ||
| Supply and fixing of ISI 38/40mm width and 12.5mm height PVC pipe/Casing and Caping, with necessary screws including joints bends and all necessary accessories complete. | — | — | — | 2,520 | |
| — | 40.00 | — | — | ||
| Supply and run of 2 nos, 6.0 sqmm, 1100 V PVC(FRLS) insulated flexible copper conductor wiresand one run of 2.5 sqmm PVC (FRLS) insulatedflexible copper cable for earthing in existing PVCconduit/Casing and capping pipe. | — | — | — | 2,520 | |
| — | 4.00 | — | — | ||
| Supply & fixing of Modular MCB DP 20/25Acapacity similar to GM make as per the directionsofengineer at site(for ac units) | — | — | — | 1,740 | |
| — | 10.00 | — | — | ||
| Supply, fixing, testing of remote control BLDC Wall mounted fan of 35W; input voltage of 165- 285 V ; 400mm sweep, air delivery 76 cu.mm; speed 1500RPM; with all connecting accessories. | — | — | — | 32,500 | |
| — | 10.00 | — | — | ||
| Supply & erection of heavy duty wall mounting type air circulator fan 600mm sweep complete with guard with out regulator | — | — | — | 64,580 | |
| — | 5.00 | — | — | ||
| Supply, fixing, testing of remote control BLDC pedestal fan of 35W on higher speed run continuously at same speed of input voltage of 145- 285 V dynamically designed 400mm sweep, air delivery 72 cu.mm; speed 1500RPM metal finished with all connecting accessories | — | — | — | 21,495 | |
| — | 5.00 | — | — | ||
| Supply and erection of FM1 Quartz Timer daily operating type | — | — | — | 11,130 | |
| — | 5.00 | — | — | ||
| Supply and erection of Power contactor 25A capacity 2 NO type | — | — | — | 8,550 | |
| — | 1.00 | — | — | ||
| Supply and erection of Rubbermat | — | — | — | 3,000 | |
| — | 10.00 | — | — | ||
| Supply of portable Fire Extinguishers dry chemical type 9/10 Kgs. Capacity fitted with gun metal cap. Drychemical powder 9/10 Kgs conform to IS:4303 and carbondioxide conform to IS4947. | — | — | — | 1,28,520 | |
| — | 0.10 | — | — | ||
| Supply and erection of fabricated small parts steel (Galavanised). | — | — | — | 9,199.5 | |
| — | 70.00 | — | — | ||
| Supply, transporting and installation of Concrete (RCC) Route Indicators at intervals of 50 meters as per instructions of engineer in charge as per drawing no. SK 12/10. They should be of standard RCC with letters "SCR S&T cable" as per type of cable laid to drawing, In case of telecom quad cable joint locations it shall be painted with GREEN and ORANGE colour for normal indication of cable path | — | — | — | 84,280 | |
| — | 3.00 | — | — | ||
| Preparation and submission ofcompletion drawings in A3size with all relevant detailsand measurements of executed installations, cableroutings, lighting arrangements etc. Thedrawings shall be submitted in1 (Soft Copy)+ 3 (Hard Copy)duly signed by the concernedSupervisor, contractor, controlling officer and to befurnished along with bills. | — | — | — | 30,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
1_Tender_Booklet_E_M_SC_31_TF_OT_2026_27.pdf Tender Booklet
ATTACHMENT
2_GCC_April-2022_withcorrectionslips.pdf
ATTACHMENT
1_Tender_Booklet_E_M_SC_31_TF_OT_2026_27.pdf
ATTACHMENT
3_earthing_RDSO_SPEC.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].