| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹19.8 Laccepted-aoc | accepted-aoc |
Tender Value
₹20.9 L
EMD Value
₹50,000
Closing Date
2 Sept 2026, 10:30 pmClosed
Rural Development and Panchayat Raj Department
EE OFFICE
Construction of CC Road from Kanavihalli to Kodihalli village (Ch 0.00 to 0.30) in Harapanahalli Taluk Vijayanagara Dist (5054 SCP TSP)
RDPR/2026-27/RD/WORK_INDENT28569
RDPR/2026-27/RD/WORK_INDENT28569
Open
Roads
Electronic Documents, First(One Cover)
RDPR Division Office Vijayanagara
₹530
₹50,000
2 Sept 2026
18 Aug 2026
1 Sept 2026
General Conditions for this Tender
1 Tenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2 : Instructions to Tenderers (ITT), will only be considered for evaluation.
2 The tenderer should quote his rates With all leads and lifts loading and un loading, including cost of Labour, hire charges of Machinery and other incidental charges etc complete as per the directions of the engineer incharge of the work specifications.
3 Defect liability period of 1 year and 1 year for major repairs to be considered.(Maintenance date starts from the date of completion period.) All the items included in the estimate are inclusive of lead and lift charges.
4 The work will be inspected by the third party & the bill will be admitted only after the satisfactory quality report from third party.
5 It is to be noted that any false documentation is found to be uploaded, the action may attract punitive measures such as blacklisting, cancellation of registration etc.
6 Contractor should made an agreement within 20 days from the date of LOA. work should be commence within 2 weeks time from the date of work order. If not tender will be cancelled at the contractors own risk and cost.
7 All materials shall be of good quality as per specification, quality certificate for the same should be obtained from the concerned authority at their own cost.
8 The Information on litigation in which the tender is involved are to be furnished
9 Financial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive)
10 Tenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 Qualification of the Tenderer in Section 2 Instructions to Tenderers will only be considered for evaluation
11 The rates of all the items appeared in Bill of Quantities are inclusive of all leads and lifts
12 Bidders are advised to note that, 18% GST will be added to the contract amount.
13 The Increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time
14 The bidder should mention the UDIN No on the turnover certificate failing which bid is rejected
15 If the bidder uploaded the false document while participating in the tender, the bidder will be responsible and action will be initiated as per the tender clause.
16 Financial turnover of previous years shall be given a weight of 10per per year to bring them to the price level of the 2023 24 in the Technical Qualification Criteria mentioned in the next section
17 Financial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).
18 List of existing commitments and ongoing works
19 The Employer reserves the right to reject any or all Tenders without assigning any reason.
20 Corrigendum modifications correction, if any, will be published in the website only,
21 Defect liability period will be one year
22 To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e 2019-20 to 2023-24 a. Achieved in at least ONE financial years a minimum financial turnover in all classes of civil engineering construction works only of Amount Put Tender (Turn over With compulsory UDIN Number)
23 To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e 2019-20 to 2023-24 b. Satisfactorily completed, as prime contractor, at least one similar work of value not less than 25% of the amount put tender (Workdone with indent No)
24 If the tenderer has quoted below the schedule-B amount the difference amount should be paid in the form of F.D.R or D.D (As per G.O) in the name of Executive Engineer, PRE Division, Vijayanagara Hosapete from Nationalized Bank only and Upload the scanned copy of the same in e-portal at the time of applying the tender The Same Scanned copy for Different work will be liable for Rejection
25 Work completion period will be 4 months
26 This work Reserved for SC Bidders only
27 All other conditions and requirements has to be fulfilled as per the standard bid document and attached General conditions
The bidders are instructed to visit the site before submitting the bid and copy of the site visit certificate has to be obtained by the concerned AEE and the same has to be uploaded in Karnataka Public Procurement Portal (KPPP) If not submitting the site visiting letter otherwise bid will be not considered
General Conditions for this Tender
1 Tenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2 : Instructions to Tenderers (ITT), will only be considered for evaluation.
2 The tenderer should quote his rates With all leads and lifts loading and un loading, including cost of Labour, hire charges of Machinery and other incidental charges etc complete as per the directions of the engineer incharge of the work specifications.
3 Defect liability period of 1 year and 1 year for major repairs to be considered.(Maintenance date starts from the date of completion period.) All the items included in the estimate are inclusive of lead and lift charges.
4 The work will be inspected by the third party & the bill will be admitted only after the satisfactory quality report from third party.
5 It is to be noted that any false documentation is found to be uploaded, the action may attract punitive measures such as blacklisting, cancellation of registration etc.
6 Contractor should made an agreement within 20 days from the date of LOA. work should be commence within 2 weeks time from the date of work order. If not tender will be cancelled at the contractors own risk and cost.
7 All materials shall be of good quality as per specification, quality certificate for the same should be obtained from the concerned authority at their own cost.
8 The Information on litigation in which the tender is involved are to be furnished
9 Financial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive)
11 Tenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 Qualification of the Tenderer in Section 2 Instructions to Tenderers will only be considered for evaluation
12 The rates of all the items appeared in Bill of Quantities are inclusive of all leads and lifts
13 Bidders are advised to note that, 18% GST will be added to the contract amount.
14 The Increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time
15 The bidder should mention the UDIN No on the turnover certificate failing which bid is rejected
16 If the bidder uploaded the false document while participating in the tender, the bidder will be responsible and action will be initiated as per the tender clause.
17 Financial turnover of previous years shall be given a weight of 10per per year to bring them to the price level of the 2023 24 in the Technical Qualification Criteria mentioned in the next section
18 Financial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).
19 List of existing commitments and ongoing works
10 The Employer reserves the right to reject any or all Tenders without assigning any reason.
21 Corrigendum, modifications, correction if any, will be published in the website only
22 Defect liability period will be one year
23 To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e 2019-20 to 2023-24 a. Achieved in at least two financial years a minimum financial turnover in all classes of civil engineering construction works only of Amount Put Tender (Turn over With compulsory UDIN Number)
24 To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e 2019-20 to 2023-24 b. Satisfactorily completed, as prime contractor, at least one similar work of value not less than 50% of the amount put tender (Workdone with indent No)
25 If the tenderer has quoted below the schedule-B amount the difference amount should be paid in the form of F.D.R or D.D (As per G.O) in the name of Executive Engineer, PRE Division, Vijayanagara Hosapete from Nationalized Bank only and upload the scanned copy of the same in e-portal at the time of applying the tender The Same Scanned copy for Different work will be liable for Rejection
27 Work completion period will be 6 months (IMP) 1658780.46
28 All other conditions and requirements has to be fulfilled as per the standard bid document and attached General conditions 41469.5115
The bidders are instructed to visit the site before submitting the bid and copy of the site visit certificate has to be obtained by the concerned AEE and the same has to be uploaded in Karnataka Public Procurement Portal (KPPP) If not submitting the site visiting letter otherwise bid will be not considered
ValidPWD Registration copy
Last 5 years Audit Report with UDIN No 2077586.88
Similar Nature Work done certificate with eproc Indent No
Difference Amount DD or FDR Scanned copy 41551.7376
Ongoing commitments and other standerd bid documents
Reserved Category certificate with RD No
General Conditions for this Tender
1 Tenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2 : Instructions to Tenderers (ITT), will only be considered for evaluation.
2 The tenderer should quote his rates With all leads and lifts loading and un loading, including cost of Labour, hire charges of Machinery and other incidental charges etc complete as per the directions of the engineer incharge of the work specifications.
3 Defect liability period of 1 year and 1 year for major repairs to be considered.(Maintenance date starts from the date of completion period.) All the items included in the estimate are inclusive of lead and lift charges.
4 The work will be inspected by the third party & the bill will be admitted only after the satisfactory quality report from third party.
5 It is to be noted that any false documentation is found to be uploaded, the action may attract punitive measures such as blacklisting, cancellation of registration etc.
6 Contractor should made an agreement within 20 days from the date of LOA. work should be commence within 2 weeks time from the date of work order. If not tender will be cancelled at the contractors own risk and cost.
7 All materials shall be of good quality as per specification, quality certificate for the same should be obtained from the concerned authority at their own cost.
8 The Information on litigation in which the tender is involved are to be furnished
9 Financial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive)
11 Tenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 Qualification of the Tenderer in Section 2 Instructions to Tenderers will only be considered for evaluation
12 The rates of all the items appeared in Bill of Quantities are inclusive of all leads and lifts
13 Bidders are advised to note that, 18% GST will be added to the contract amount.
14 The Increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time
15 The bidder should mention the UDIN No on the turnover certificate failing which bid is rejected
16 If the bidder uploaded the false document while participating in the tender, the bidder will be responsible and action will be initiated as per the tender clause.
17 Financial turnover of previous years shall be given a weight of 10per per year to bring them to the price level of the 2023 24 in the Technical Qualification Criteria mentioned in the next section
18 Financial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).
19 List of existing commitments and ongoing works
10 The Employer reserves the right to reject any or all Tenders without assigning any reason.
21 Corrigendum modifications correction, if any, will be published in the website only,
22 Defect liability period will be one year
23 To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e 2018-19 to 2022-23 a. Achieved in at least two financial years a minimum financial turnover in all classes of civil engineering construction works only of Amount Put Tender (Turn over With compulsory UDIN Number)
24 To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e 2018-19 to 2022-23 b. Satisfactorily completed, as prime contractor, at least one similar work of value not less than 50% of the amount put tender (Workdone with indent No)
25 If the tenderer has quoted below the schedule-B amount the difference amount should be paid in the form of F.D.R or D.D (As per G.O) in the name of Executive Engineer, PRE Division, Vijayanagara Hosapete from Nationalized Bank only and upload the scanned copy of the same in e-portal at the time of applying the tender The Same Scanned copy for Different work will be liable for Rejection
25 If the tenderer has quoted 10% or above (Less quoted Rates) Below the schedule-B amount please submit the Rate Analyses copy with concerned bidder letter head, other wise bid will be Rejected.
26 Liquid assets or availability of credit facilities of no less than 30% of the estimated cost (unconditionable Credit lines or letter of credit or certificates from nationalized banks for meeting the fund requirement etc.)
27 All other conditions and requirements has to be fulfilled as per the standard bid document and attached General conditions
28 Work completion period will be 4 months (IMP)
The bidders are instructed to visit the site before submitting the bid and copy of the site visit certificate has to be obtained by the concerned AEE and the same has to be uploaded in Karnataka Public Procurement Portal (KPPP) If not submitting the site visiting letter otherwise bid will be not considered 843298
Submit the Site visiting letter from concerned AEE, other wise bid will be not considered 6000
The bidders are instructed to visit the site before submitting the bid and copy of the site visit certificate has to be obtained by the concerned AEE and the same has to be uploaded in Karnataka Public Procurement Portal (KPPP) If not submitting the site visiting letter otherwise bid will be not considered
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
New conditions.xlsx
Instructions to Tenderers • 0.02 MB
KW II Standered Bid Document.doc
Tender Document • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .