| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.7 LAccepted-AOC C 9 53 IIND FLOOR SECTOR 08 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | L1 | Accepted-AOC L1 accepted | |
| 2 | L2₹1.0 Cr+₹6.9 L (7.08%)Rejected-Finance 1 204 LOWER GROUND FLOOR SADAR BAZAR DELHI CANTT 110010 | NEW DELHI | DELHI | 110010 | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹1.2 Cr+₹24.5 L (25.2%)Rejected-Finance N A | NA | NA | 121004 | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹1.3 Cr+₹32.1 L (33.0%)Rejected-Finance 1ST FLOOR H NO 165 GALI NO 16 S B S COLONY KARAWAL NAGAR DELHI EAST DELHI DELHI 110094 | NORTH EAST DELHI | DELHI | 110094 | L4 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | L G BUILDERS L1 | R. S. Associates L4 | Vipul Construction L3 | LAXMI GROUP L2 |
|---|---|---|---|---|---|---|---|
| 1.00NOTES (READ CAREFULLY BEFORE QUOTING RATE):- 1. Work will be executed in multy storey buildings(G+8). 2. Rates included for any necessary services for ease of work in multistory bldg like mechanical tools, mechanical suspended platform & Scaffolding for demolition and safety net if required any as directed by Engr-in Charge. 3. During the execution of work, In case of any damages such as the GAS PIPE LINE or water supply pipe, cable etc., the contractor will have to got it repaired/replaced at his own cost and nothing will be paid extra on account and all these items will be removed/repaired by contractor at their own cost. 4. All the demolished bldg material will be removed outside MOD land by the contractor at his own expenses. The rate of removal is deemed to be included in unit rate quoted. 5.The contractor shall provide all safety equipments as per IS standards to labours. | |||||||
| 2.00 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles, complete all as specified and directed. | 209 | Cum | 150 ₹31,350 | 800 ₹1,67,200 | 450 ₹94,050 | 148 ₹30,932 Lowest |
| 3.00 | Taking up or down 15mm dia bore of galvanized Iron steel tubing and connections including cutting/chasing in wall/floor, complete all as specified and directed. | 2,700 | RM | 15 ₹40,500 | 10 ₹27,000 Lowest | 55 ₹1,48,500 | 19 ₹51,300 |
| 4.00 | Taking up or down 20mm dia bore of galvanized Iron steel tubing and connections including cutting/chasing in wall/floor complete, complete all as specified and directed. | 2,250 | RM | 20 ₹45,000 | 12 ₹27,000 Lowest | 65 ₹1,46,250 | 24 ₹54,000 |
| 5.00 | S&F 15mm bore dia of medium grade galvanized steel tubing with all fittings and fixed complete to wall or laid in floor, complete all as specified and directed. | 2,700 | RM | 195 ₹5,26,500 Lowest | 290 ₹7,83,000 | 345 ₹9,31,500 | 205 ₹5,53,500 |
| 6.00 | S&F 20mm bore dia of medium grade galvanized steel tubing with all fittings and fixed complete to wall or laid in floor, complete all as specified and directed. | 2,250 | RM | 235 ₹5,28,750 | 355 ₹7,98,750 | 445 ₹10,01,250 | 134 ₹3,01,500 Lowest |
| 7.00 | S&F 20mm bore gun matel globe or gate valves with iron wheel, screwed both ends for iron pipes fixed complete, complete all as specified and directed. | 196 | Each | 850 ₹1,66,600 | 860 ₹1,68,560 | 850 ₹1,66,600 | 740 ₹1,45,040 Lowest |
| 8.00 | Dismantling of brick tiles or terracing tiles single layer on roof complete all as spd & directed. | 4,400 | Sqm | 50 ₹2,20,000 | 90 ₹3,96,000 | 55 ₹2,42,000 | 48 ₹2,11,200 Lowest |
| 9.00 | Demolition of mud phuska on roof slabs, any thickness including cleaning of roof surfaces and removing the debris outside the MoD land exc 1.00 Km but n.exc 1.50 km, complete all as specified and directed. | 600 | Cum | 200 ₹1,20,000 Lowest | 950 ₹5,70,000 | 500 ₹3,00,000 | 228 ₹1,36,800 |
| 10.00 | M&L for wire brushing and cleaning (old APP/Tar felt membrane) top surface of existing roof surface, including flashings and junction of parapets, etc. Complete all as specified and directed. | 4,400 | Sqm | 50 ₹2,20,000 | 20 ₹88,000 Lowest | 45 ₹1,98,000 | 57 ₹2,50,800 |
Tender Value
₹1.2 Cr
EMD Value
₹1.9 L
Closing Date
3 Jul 2026, 6:00 pmClosed
CWE NO 2 DELHI CANTT
HQ CWE NO 2 DELHI CANTT 110010
SPL REPAIR OF ROOF TREATMENT AND SEEPAGE TREATMENT IN CARIAPA VIHAR IN THE AREA OF AGE B/R-II UNDER GE (WEST) DELHI CANTT-10
2026_MES_769652_1
8662/WEST/TOKEN-05/2026-27
Open Tender
Civil Works
Item Rate
180 days
DELHI CANTT
All as per tender documents
8 documents required · 8 mandatory
₹1,000
GE WEST DELHI CANTT
₹1.9 L
8 Aug 2026
5 Jun 2026
4 Jul 2026
5 Jun 2026
3 Jul 2026
26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Demolition of Brickwork or stone/ boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles, complete all as specified and directed. | - | Cum | - | - |
| 3 | Taking up or down 15mm dia bore of galvanized Iron steel tubing and connections including cleaning for refixing, cutting/chasing in wall/floor, complete all as specified and directed. | 2,700 | RM | - | - |
| 4 | Taking up or down 20mm dia bore of galvanized Iron steel tubing and connections including cleaning for refixing, cutting/chasing in wall/floor complete, complete all as specified and directed. | 2,250 | RM | - | - |
| 5 | S&F 15mm bore dia of medium grade galvanized steel tubing with all fittings and fixed complete to wall or laid in floor, complete all as specified and directed. | - | RM | - | - |
| 6 | S&F 20mm bore dia of medium grade galvanized steel tubing with all fittings and fixed complete to wall or laid in floor, complete all as specified and directed. | - | RM | - | - |
| 7 | S&F 20mm bore gun matel globe or gate valves with iron wheel, screwed both ends for iron pipes fixed complete, complete all as specified and directed. | 196 | Each | - | - |
| 8 | Dismantling of brick tiles or terracing tiles single layer on roof complete all as spd & directed. | 4,400 | Sqm | - | - |
| 9 | Demolition of mud phuska on roof slabs, any thickness including cleaning of roof surfaces and removing the debris outside the MoD land exc 1.00 Km but n.exc 1.50 km, complete all as specified and directed. | 600 | Cum | - | - |
| 10 | M&L for wire brushing and cleaning (old APP/Tar felt membrane) top surface of existing roof surface, including flashings and junction of parapets, etc. Complete all as specified and directed. | 4,400 | Sqm | - | - |
| 11 | M&L PCC 1:2:4 type B1 (using 20mm graded stone agg) cement concrete as in roof padding etc. Complete all as specified and directed. | 160 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_861909.xls
BOQ • 0.95 MB
05.pdf
Tender Documents • 1.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .