GE 861 EWS
GE 861 EWS
PROVN OF 04 X TOILET BLOCK, 04 X BATHROOM, 01 X COY STORAGE SHED PARKING SHED ALONGWITH HARDSTANDING OF 04 X LORRY AMB VEH AT MT AREA AND PROVN OF CLEAN UTILITY STORE AND SCRUB UP ROOM FOR OPERATION THEATRE AT AWANTIPUR GRN UNDER GE 861 EWS
2026_MES_784517_1
GE 861 EWS-50(T)/2026-27
Open Tender
Civil Works
Item Rate
180 days
GE 861 EWS
As per NIT
8 documents required · 8 mandatory
₹500
GE 861 EWS
₹97,000
GE 861 EWS
9 Sept 2026
14 Aug 2026
12 Sept 2026
14 Aug 2026
9 Sept 2026
2 Sept 2026
20 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, cable, pipes etc. not exceeding 10 sqm on plan and not exceeding 1.5 m in depth and getting out in Soft/ Loose soil complete all as specified and as directed by Engineer-in- charge. | 214.54 | Cum | - | - |
| 2 | Excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, cable, pipes etc. not exceeding 10 sqm on plan and not exceeding 1.5 m in depth and getting out in any type of soil complete all as specified and directed by Engineer-in-Charge | 6 | Cum | - | - |
| 3 | Material and Labour for Excavating in post holes (or similar holes)each not exceeding 0.5 cum.getting out in hard/ dense soil,returning, filling in and ramming earth or broken rubble mixed with earth around,in layers not exceeding 25 cm in hard/dense soil complete all as specified and as directed by Engineer-in-Charge. | 15 | Each | - | - |
| 4 | Surface excavation not exceeding 30 cm deep and averaging 15cm deep and getting out in Hard/Dense soil complete all as specified and as directed by Engineer-in-Charge. | 115.96 | Sqm | - | - |
| 5 | Material & Labour for PCC 1:4:8 , Type - D2, using 40mm graded stone aggregates as in foundations, filling and mass concrete complete all as specified and directed by Engineer-in-Charge. | 11.27 | Cum | - | - |
| 6 | Material & Labour for Reinforced cement concrete (Design Mix) M-30 as in foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed by Engineer-in-Charge.NOTE :- Form work and Steel reinforcement shall be measured and paid seperately under appropriate items of Schedule 'A' BoQ.seperate items. | 22.26 | Cum | - | - |
| 7 | Material & Labour for Reinforced cement concrete (Design Mix) M-30as in Columns, pillars, piers, posts and struts complete all as specified and directed by Engineer-in-Charge.NOTE :- Form work and Steel reinforcement shall be measured and paid seperately under appropriate items of Schedule 'A' BoQ.seperate items. | 6.11 | Cum | - | - |
| 8 | Material & Labour for Reinforced cement concrete (Design Mix) M-30 as in Beams, cantilevers, bressummers, lintels over 1.5m span complete all as specified and directed by Engineer-in-Charge.NOTE :- Form work and Steel reinforcement shall be measured and paid seperately under appropriate items of Schedule 'A' BoQ.seperate items. | 6.73 | Cum | - | - |
| 9 | Material & Labour for Reinforced cement concrete (Design Mix) M-30 as in Chajjas complete all as specified and directed by Engineer-in-Charge.NOTE :- Form work and Steel reinforcement shall be measured and paid seperately under appropriate items of Schedule 'A' BoQ.seperate items. | 0.84 | Cum | - | - |
| 10 | Material & Labour for Reinforced cement concrete (Design Mix) M-30 as in Slabs supported on walls,beams and columns infloors,roofs, landings, balconies,canopies, deck slabs and inshelves and the like Slabs supported on walls,beams andcolumns in floors,roofs, landings, balconies,canopies, deck slabs and inshelves and the like complete all as specified and directed by Engineer-in-Charge.NOTE :- Form work and Steel reinforcement shall be measured and paid seperately under appropriate items of Schedule 'A' BoQ.seperate items. | 3.17 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_879064.xls
BOQ • 13.82 MB
Tender50T.pdf
Tender Documents • 1.38 MB
Dateamdtcorrigendum.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].