Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC | ₹24.9 L | L1 | Accepted-AOC Lowest value |
| Sl No | Description | Qty | Unit | Vino Industry L1 |
|---|---|---|---|---|
| 1.00Excavation of Pole/Stay Pit | ||||
| 2.00 | Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual | 200 | Each | 450 ₹90,000 |
| 3.00 | Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual | 150 | Each | 550 ₹82,500 |
| 4.00 | Hard rock without blasting (where houses are located) | 10 | Each | 1,500 ₹15,000 |
| 5.00 | Stay pit 4.5' to 5' depth by using JCB or manual | 120 | Each | 450 ₹54,000 |
| 6.00Erection of poles. | ||||
| 7.00 | PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual | 200 | Each | 550 ₹1.1 L |
| 8.00 | PSC/ RCC poles/Metal poles above 8.00m by using JCB or manual | 150 | Each | 650 ₹97,500 |
| 9.00 | Metal supports above 9.00m/ RSJ/ Rail pole/ Fabricated poles/ Tubular pole by using JCB or manual | 10 | Each | 650 ₹6,500 |
| 10.00 | Erection of stay set complete | 120 | Each | 240 ₹28,800 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
23 Feb 2026, 2:30 pmClosed
SE/SEDC/SLM
o/o of the SE/SEDC/SLM
Short Tender for Works contract for Execution of extension Improvement DCW and various works in respect of East Division
2026_EB_659516_1
SE/SEDC/WC.057/25-26dt.17.2.26
Open Tender
Electrical and Maintenance Works
365 days
East division
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
11 Jun 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
Excavation of Pole/Stay Pit
Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual
Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual
Hard rock without blasting (where houses are located)
Stay pit 4.5' to 5' depth by using JCB or manual
Erection of poles.
PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
PSC/ RCC poles/Metal poles above 8.00m by using JCB or manual
Metal supports above 9.00m/ RSJ/ Rail pole/ Fabricated poles/ Tubular pole by using JCB or manual
Erection of stay set complete
Transport of Poles road side to pole pit including loading and unloading
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100m
Transport of poles/Materials/ conductors and other materials (excluding loading and unloading charges.)
Below 8 Kms (Plains)
Above 8 Kms. For additional Km (Irrespective of weight in tonnage)
Loading and unloading of poles:
Loading of poles upto 8.0 M/ 27
Unloading of poles upto 8.0 M/27
Loading of poles above 8.0 M
Unloading of Poles above 8.0 M
Loading of metal poles (All sizes)
Unloading of metal poles (All sizes)
Loading of materials
Unloading of materials
Leading and stacking of materials
Fixing of Cross Arms
HT "V" cross arms (all types) / Channel cross arms/ Guarding Cross arms
Double Channel X-arm
Guarding Cross arm
Tapping Channel Cross Arm
LT 3 phase cross arms
LT Single phase cross arms
HT/LT TI Fittings
Fixing of Aluminium Knob
Fixing of HT pin Insulators 22 KV
Fixing of HT 11 KV strain disc.
Fixing of HT 22 KV strain disc
Fixing of LT Pin Insulator
Fixing of LT shackle
Paving of Conductor, stringing etc., complete with ACSR/ AAAC for both HT/LT lines.
ACSR 7/4.09 mm Raccoon conductor
ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm Conductor
Cable sizes of 4x25 Sq.mm
Cable sizes of 4x120 Sq.mm
Guarding arrangements:
Flat guarding including fixing of 2 Nos. cross arms
HT Guarding
Concreting of poles:
Mass concreting including materials (Cement + River sand/ M sand and Blue metals and watering)
Sleeve concreting including materials (Cement + River Sand/ M sand and Blue metals and watering)
Earthing of pole with coil earthing including burying looping and binding
Painting
Painting of metal poles including cross arms (excluding cost of paint)
Numbering of pole with paint and with base painting.
Painting of Transformer (Double coat)
Erection of Transformer
Loading of Transformer upto 100 KVA
Unloading of Transformer upto 100 KVA
Loading of Transformer above 100 and upto 200 KVA
Unloading of Transformer above 100 and upto 200 KVA
Loading of Transformer above 200 KVA
unloading of Transformer above 200 KVA
Erection of New Transformer all capacities (with jumpering)
Replacement of failed Transformers all capacities (with jumpering)
Erection of HT Metering set
Loading of HT Metering set
Unloading of HT Metering set
Lathe Works
Labour charges for alteration of Back Clamps/ Stay Clamps to suit for the works
Drilling of hole in channel only 3/4" & 1"
Cutting of channel
Cutting of RSJ pole
RSJ pole welding
Re-sagging of HT/LT lines
Re-sagging ACSR 7/4.09 mm Raccoon conductor
Re-sagging ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
Re-sagging ACSR 7/2.59 mm / AAAC 2.50 mm Weasel and ACSR 7/2.11 mm conductor
Releasing of ACSR/AAAC conductors from conductor drum and coiling 7/2.59, AAAC 7/2.50, ACSR 7/3.35, 7/3.15 MM
Service Erected:
Erection of street light including fixure fitting
Erection of street light service
Fixing of new SV/MV lamp fittings
Agricultural service fixing
Releasing of single phase service and re-fixing.
Releasing of 3 phase service and (upto 50 HP) re-fixing.
Releasing of 3 phase service and (above 50 HP) re-fixing.
Releasing of grills from RCC Poles
Tree cutting works
Cutting of coconut leaves (per tree)
Clearing of branches of trees
DT/ DP erection
Erection of Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pits with collar including painting of metal parts, structure poles, fixing of top channel, seating channel, belting angle including concreting (Except erection of Transformer)
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
Feeding arrangements with open type fuse unit
Dismantling of Line Materials
Dismantling of Transformer structure Complete
Dismantling of Single pole Transformer Structure complete
Dismantling of D.P Structure complete
Dismantling of pole from pole pit (9.0m and above)
Dismantling of pole from pole pit (7.5mtr & 8mtr)
Dismantling of pole (9.0m and above)
Dismantling of pole (7.5mtr & 8mtr)
Dismantling of HT 22 KV Pin Insulator
Dismantling of HT TI Fitting
Dismantling of11 KV disc
Dismantling of 22 KV disc
Dismantling of 3 PH X arm
Dismantling of V X arm
Dismantling of Tapping X arm, V X arm & Guarding X arm
Dismantling of 1 PH X arm
Dismantling of Alu Knob
Dismantling of LT pin Insulator
Dismantling of LT Shackle Insulator
Stay set complete Dismantling
Dismantling of 7/4.09 mm ACSR conductor
Dismantling of 7/3.35 mm ACSR conductor
Dismantling of 7/2.59 & 7/2.11 mm ACSR conductor
Dismantling of Guarding
Dismantling of St light fitting
Dismantling of st light SC
G.S.T. @18% should be Entered by the Bidder
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_791295.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid