| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 01₹16.1 LAccepted-AOC | 01 | Accepted-AOC Awarded | |
| 2 | 02₹16.9 L+₹73,600.10 (4.56%)Rejected-Finance AMBEDKAR PURAM 6 140 AWAS VIKAS SECTOT 6 KANPUR NAGAR | 02 | Rejected-Finance 2nd lowest rate |
Tender Value
₹21.6 L
EMD Value
₹2.2 L
Closing Date
24 Jul 2024, 11:00 amClosed
Executive Engineer
Office of the Executive Engineer Irrigation Division Kanpur Dehat
Extensioning and Repairing of VRB on W.A.B km 70.179 at Jaitpur Scape Had
2024_UPIDC_938108_5
01/EE/2024-25
Open Tender
Civil Works
Item Rate
90 days
Irrigation Division Kanpur Dehat
As Tender Condition
2 documents required · 2 mandatory
₹2,714
₹2.2 L
26 Nov 2024
19 Jul 2024
24 Jul 2024
19 Jul 2024
24 Jul 2024
19 Jul 2024
Amount
Earth work in Foundation in dry ordinary soil (Loam,clay or sand)includin lift upto 1.50 M lead up to 30 M and including filling,watering and ramming of excavated earth into the trench or into the space between the structure and the side of foundation trenches or into the plinth with removel and disposal of surplus earth as directed by the Engineer-in-charge
Laying of Cement Concrete 1:3:6 in foundation with cement, c.sand & 10 to 20 mm Stone Grit including all labour and T&P etc complete.
Ist Class 150 Brick Work 1:4 With Cement & C-Sand including all labour material and t&p
S/L Local sand including cast of all labour metarial and T&P etc.
Plain cement concrete 1:2:4 with cement course sand and stone grit
Centering and shuttering for R.C.C. work for bridge slab up to 3 met span including cost of labour material and T&P etc. required for completion of the work.
Centering and shuttering for C.C. and including rent of material labour and T&P etc.
Steel Reinforcement per MT.
Reinforced cement concrete (R.C.C.)1:1.5:3 with cement, c.sand & 10 to 20 mm Stone Grit
Cement concrete in wearing coat in C.C. 1:1.5:3 with cement coarse sand and aggregate 10 to 20 mm. stone grit including all material labour and t&p
Cement pointing 1:3 (stuck deep) on brick masonary including all material labour and t&p
Finishing walls with water proofing cement paint of approved manufacturers of required shade on uncoated wall over one coat white cement primer including curing and cost of material in two coats complete. As per I.D. S.O.R ch-12 item 15(i)
suppyingand fixing 110mm dia P.V.C. pipe
Supplying and fixing of R.C.C wheelgaurd incld all cost of material labour and t&p etc.
S/F of sign board at site in 90X60 cm. size of mild steel or iron in plain work to req. shape of angle 40X40X6 mm and 2.50 mm thick plate as necessary for welding and bending incld. Painting and writing in both sides with supply of steel and its wastage as req. for completion of work.
M/S VINOD KUMAR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .