Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.1 CrAccepted-AOC NO 5 2 28B RAMAN NAGAR SALEM MAIN ROAD METTUR DAM SALEM DISTRICT 636 403 | SALEM | TAMIL NADU | 636403 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹29.5 Cr+₹28.0 L (0.96%)Rejected-AOC 9 A PONGALIVALASU KODUMUDI POST ERODE 638 151 | ERODE | ERODE | TAMIL NADU | 638151 | L2 | Rejected-AOC Other than lowest bidder | |
| 3 | L3₹30.1 Cr+₹79.8 L (2.73%)Rejected-AOC NO 167 1 MUTHUGOUNDENPALAYAM RING ROAD KUMARAPALAYAM ERODE 638 104 | ERODE | TAMIL NADU | 638104 | L3 | Rejected-AOC Highest bidder |
| Sl No | Description | Qty | Unit | Rajam Engineering Contractors L1 | Sri Balaji Constructions L2 | BLUELEAF PROJECTS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00Civil works | ||||||
| 1.01 | Clearing light jungle including cutting and removing grass, weeds, bushes, shrubs, creepers, and small trees , grubbing up roots, and disposal of debris,etc., complete complying with standard specification and as directed by the departmental officers. | 15,600 | sqm | 10 ₹1,84,080 | 7 ₹1,28,856 Lowest | 8 ₹1,47,264 |
| 2.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. | 8,825 | cum | 375 ₹39,05,062.5 Lowest | 385 ₹40,09,197.5 | 400 ₹41,65,400 |
| 3.00 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 55 | cum | 200 ₹12,980 Lowest | 210 ₹13,629 | 200 ₹12,980 Lowest |
| 4.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 5,492 | cum | 525 ₹34,02,294 | 510 ₹33,05,085.6 | 500 ₹32,40,280 Lowest |
| 5.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 1,737 | cum | 1,750 ₹35,86,905 Lowest | 1,800 ₹36,89,388 | 1,800 ₹36,89,388 |
| 6.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental
officers. | 2,793 | cum | 175 ₹5,76,754.5 | 170 ₹5,60,275.8 Lowest | 170 ₹5,60,275.8 Lowest |
| 7.00 | Providing Anti-termite treatment | 3,000 | sqm | 120 ₹4,24,800 Lowest | 125 ₹4,42,500 | 130 ₹4,60,200 |
| 7.01Stage:2 Spraying anti-termite chemicals solution to the grade beams level spraying has to be done for the grade beams brick masonry in the superstructure in contact with back fill earth. Stage:3 Spraying anti-termite chemicals solution on M-Sand for the flooring before laying the flooring concrete. The treatment has to be carried out on the M-Sand filling the basement after leveling operation is over. Stage:4 Spraying anti-termite chemicals solution around the building outside of the building by making crow bar holes at an intervel of 12" to a depth of 8" around the building before laying the plinth projection. This holes has to be be closed after the treatment. | ||||||
| 8.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 925 | cum | 6,000 ₹65,49,000 | 5,700 ₹62,21,550 Lowest | 5,800 ₹63,30,700 |
Tender Value
₹28.1 Cr
EMD Value
₹28.1 L
Closing Date
6 Feb 2026, 3:00 pmClosed
Superintending Engineer,HBC
O/o Superintending Engineer, PWD, Heritage Buildings Circle, Chepauk, Chennai -05
Formation of Noyyal Archaeological Museum at Perundurai in Erode District
2026_PWD_649741_2
87/HBC/2025-26
Open Tender
Civil Works - Buildings
Lump-sum
455 days
Erode
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹28.1 L
8 Mar 2026
2 Feb 2026
6 Feb 2026
2 Feb 2026
6 Feb 2026
2 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil works | |||||
| 1.01 | Clearing light jungle including cutting and removing grass, weeds, bushes, shrubs, creepers, and small trees , grubbing up roots, and disposal of debris,etc., complete complying with standard specification and as directed by the departmental officers. | 15,600 | sqm | - | - |
| 2 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. | 8,825 | cum | - | - |
| 3 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. | 55 | cum | - | - |
| 4 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 5,492 | cum | - | - |
| 5 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 1,737 | cum | - | - |
| 6 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental
officers. | 2,793 | cum | - | - |
| 7 | Providing Anti-termite treatment | 3,000 | sqm | - | - |
| 7.01 | Stage:2 Spraying anti-termite chemicals solution to the grade beams level spraying has to be done for the grade beams brick masonry in the superstructure in contact with back fill earth.
Stage:3 Spraying anti-termite chemicals solution on M-Sand for the flooring before laying the flooring concrete. The treatment has to be carried out on the M-Sand filling the basement after leveling operation is over.
Stage:4 Spraying anti-termite chemicals solution around the building outside of the building by making crow bar holes at an intervel of 12" to a depth of 8" around the building before laying the plinth projection. This holes has to be be closed after the treatment. | - | - | - | - |
| 8 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 925 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Pricetendernoyyal.pdf
Additional Documents • 1.15 MB
PQconditionnoyyal.pdf
Tender Documents • 0.43 MB
BOQ_779522.xls
BOQ • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .