Loading…
Loading…
Tender Value
₹50 L
EMD Value
₹37,500
Closing Date
9 Jul 2026, 5:30 pm
Similar tender results from the same govt authority in the past 3 years.
MR SE DURG 3 KUSUM DEWANGAN
CE,DURG
SURVEY , D.P.R & LAND ACQUISION WORK FOR WIDENING & UPGRADATION OF BALOD -DURG-BEMETARA-NAVAGARH-MUNGELI-LORMI-KOTA-RATNPUR ROAD OF DURG ZONE OF DURG DIVISION
193849
NIT NO. 161/Durg(Durg)/2026
RESTRICTED TENDER
WORKS
CE
Required Past Technical Experience: As Per NIT
Required Financial Turnover (in INR): AS PER NIT
Required Bid Capacity (in INR): AS PER NIT
6 documents required · 6 mandatory
Public Works Department (PWD)
WORKS
MR SE DURG 3 KUSUM DEWANGAN
RESTRICTED TENDER
PERCENTAGE
A B C D
CE,DURG
DURG,CIRCLE
DIVISION DURG
120
No
1
7137000
12012023
193849
9 Jul, 2026 5:30:38 PM IST
14 Jul, 2026 11:30:14 AM IST
22 Jun, 2026 7:30:24 PM IST
15062026
NIT NO. 161/Durg(Durg)/2026
SURVEY , D.P.R & LAND ACQUISION WORK FOR WIDENING & UPGRADATION OF BALOD -DURG-BEMETARA-NAVAGARH-MUNGELI-LORMI-KOTA-RATNPUR ROAD OF DURG ZONE OF DURG DIVISION
37500.00 INR
RTGS/CHALLAN (ONLINE) Internet Banking (ONLINE)
5000000.00
2
13 Jul, 2026 5:30:02 PM IST
5000000
AS PER NIT
AS PER NIT
As Per NIT
0.00 INR
04
16d 23h 26m
4910520230005 ,4910520230006 ,4910520230007
6 documents required · 5 mandatory · 1 optional
₹0
₹37,500
22 Jun 2026
22 Jun 2026
14 Jul 2026
22 Jun 2026
9 Jul 2026
22 Jun 2026
13 Jul 2026
NIT SCHEDULE FOR DETAILED SURVEY , D.P.R & LAND ACQUISION WORK FOR WIDENING & UPGRADATION OF BALOD -DURG-BEMETARA-NAVAGARH-MUNGELI-LORMI-KOTA-RATNPUR ROAD OF DURG ZONE OF DURG DIVISION (LENGTH OF BALOD DIVISION-KM 16/2 TO 54/10 =39 KM, LENGTH OF DURG DIVISION-KM 2/2 TO 41/10 =40 KM, LENGTH OF BEMETARA DIVISION-KM 42/2 TO 76/8 =38.20 KM TOTAL LENGTH = 117.20 KM
PAC Rs.IN LACS = 50.00
S. No. Item No. Particulars Quantity Unit Rate Amount Durg Bemetara Balod
1 R -SOR -13.1 Deploying Automated Traffic Count and classification (ATCC) system on Road in both direction at designated traffic count post by using High Definition Cameras for 7 days & 7 night (24 hrs x 7 days). Collecting the Non Editable Data In DVR System with necessary electronic and electrical arrangements or inventor of required apacity Classification of data as per vehicle category as required with the help of software and submitting the the reports to the concerned department in hard copies as well as in soft copy, including using necessary technical manpower etc. complete, confirming to clause 6.2 of IRC:SP: 19-2001 and Guidance may be taken from IRC:9, etc. complete. 1.00 Each Location 1114000.00 111400000 1.00 1114000 0 0
2 R -SOR -13.7 Detailed survey of existing road including chaining, levelling, with cross sections at 25 m intervals and closing survey each day's work, fixing of bench marks, painting, taking trialpits and submission of road cross sections, L-sections , quantity statements and details of all cross drainage works in computerised prints in five copies in proper files and all types of compliance required by the Engineer-in -charge. 117.20 Per Kilometer 14500.00 169940000 40.00 38.20 39 580000 553900 565500
3 R -SOR -13.11 Providing and Fixing Wooden survey pegs including White washing, etc. complete. 1144.00 Each 45.00 5148000 400.00 374 370 18000 16830 16650
4 R -SOR -13.12 A Design of junctions including detail layout of traffic signs, informatory boards traffic islands. Breaks in median verge including working levels at junctions as per IRC standards etc. complete.Major Junction 22.00 Each 28166.00 61965200 0.00 9 13 0 253494 366158
5 R -SOR -13.12 B Design of junctions including detail layout of traffic signs, informatory boards traffic islands. Breaks in median verge including working levels at junctions as per IRC standards etc. complete.Minor Junction 81.00 Each 14145.00 114574500 0.00 42 39 0 594090 551655
6 BRIDGE -SOR -4.30(i) Performing detailed survey and investigation and collection of hydraulic datas (essential design data as per I.R.C special publication No. 13) consisting of catchment area, L-section of road and stream, cross section of stream at the point of crossing, at up-stream and down stream site, as well as trial pit section result ascertaining and marking of H.F.L., O.F.L., transferring and fixing of pucca bench marks at site etc. complete i/c cost of necessary materials and labour required for survey work. (Sub-Engineer to be engaged from regular establishment) (i) For catchment areas less than 1.25 sq Km. 83.00 Each 3124.00 25929200 30.00 10 43 93720 31240 134332
7 BRIDGE -SOR -4.30(ii) (ii)For catchment areas 1.25 to 2.5 sq.Km. 29.00 Each 3806.00 11037400 3.00 9 17 11418 34254 64702
Say Rs. 50.00 Lakhs
NIT SCHEDULE FOR DETAILED SURVEY , D.P.R & LAND ACQUISION WORK FOR WIDENING & UPGRADATION OF BALOD -DURG-BEMETARA-NAVAGARH-MUNGELI-LORMI-KOTA-RATNPUR ROAD OF DURG ZONE OF DURG DIVISION (LENGTH OF BALOD DIVISION-KM 16/2 TO 54/10 =39 KM, LENGTH OF DURG DIVISION-KM 2/2 TO 41/10 =40 KM, LENGTH OF BEMETARA DIVISION-KM 42/2 TO 76/8 =38.20 KM TOTAL LENGTH = 117.20 KM
ESTIMATE FOR DETAILED SURVEY FOR WIDENING & UPGRADATION OF BALOD -DURG-NAVAGARH-MUNGELI-LORMI-KOTA-RATNPUR ROAD OF DURG ZONE OF DURG DIVISION
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 1.15 MB
5507974512508489068_193849_Affidavit.docx
NIT • 0.01 MB
6522621545329212069_193849_BID-CAPACITY-2.docx
NIT • 0.03 MB
8701406340853506013_193849_Guidelines_to_Bidders_EPS_v1.pdf
NIT • 0.13 MB
7016204781971554316_193849_Latest A_ 2.doc
NIT • 0.16 MB
2448865559584291296_193849_English Notice Less than 1 Crore.docx
NIT • 0.03 MB
3322894312776869610_193849_Latest NIT APPENDIX 2.doc
NIT • 0.32 MB
814346589320340664_193849_NIT balod durg.xlsx
BOQ • 0.02 MB
Download all tender documents and submit your bid