Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹19.0 L+₹2.3 L (13.5%)Accepted-Finance KAURARA ROAD SIRSAGANJ FIROZABAD | SIRSAGANJ | FIROZABAD | UTTAR PRADESH | L2 | Accepted-Finance L2 | |
| 3 | Rejected-Technical 302 1 SHIVKUTI PRAYAGRAJ | - | Rejected-Technical Document Incomplete | |
| 4 | Rejected-Technical | - | Rejected-Technical Document Incomplete | |
| 5 | Rejected-Technical | - | Rejected-Technical Document Incomplete |
| Sl No | Description | Qty | Unit | DHIRENDRA SINGH L2 | NIRANJAN SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|
| 0.00The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | |||||
| 1.00 | E/W Excavation in foundation M.K.R. soil including initial lead and lift as per proper completion of work. | 745.87 | Cum | 99 ₹73,841.13 | 70 ₹52,210.9 Lowest |
| 2.00 | Supplying & Laying coarse sand in foundation with all cost of material, labour, T&P etc required for completion of work. | 35.29 | Cum | 1,520 ₹53,640.8 | 1,100 ₹38,819 Lowest |
| 3.00 | Laying C.C. 1:3:6 in foundation with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 66.12 | Cum | 3,500 ₹2,31,420 | 3,300 ₹2,18,196 Lowest |
| 4.00 | Laying C.C. 1:2:4 in top of stone masonry with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 10.11 | Cum | 4,230 ₹42,765.3 | 3,800 ₹38,418 Lowest |
| 5.00 | Laying RCC hume pipe 1000 mm dia pipe including cost of material, labour, T&P etc with all leads & lifts for proper completion of Job. | 27.5 | Cum | 7,000 ₹1,92,500 | 6,300 ₹1,73,250 Lowest |
| 6.00 | R.C.R. Stone masonry 1:4 cm with all cost of labour cement, sand, stone T&P etc required for completion of work. | 302.66 | Cum | 3,920 ₹11,86,427.2 | 3,500 ₹10,59,310 Lowest |
| 7.00 | Cement pointing 1:2 on stone masonry all cost of labour material T&P etc required for completion of work. | 173.39 | Sqm | 103 ₹17,859.17 | 70 ₹12,137.3 Lowest |
| 8.00 | Centering & Shuttering for R.C.C. work with all cost of labour material T&P etc required for completion of work. | 91.97 | Sqm | 678 ₹62,355.66 | 500 ₹45,985 Lowest |
| 9.00 | Grouted stone pitching in 1:4 cm including all cost of labour material T&P etc required for completion of work. but excluding GST | 41.6 | Sqm | 640 ₹26,624 | 550 ₹22,880 Lowest |
Tender Value
₹23.3 L
EMD Value
₹46,500
Closing Date
25 Aug 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
OFFICE OF THE EE ICD KARWI CHITRAKOOT
Construction of Drainage Crossing at Km. 12.100 of Surauli Dy. (Lot-05)
2026_UPIDC_1175409_5
02/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
180 days
Distt Hamirpur
AS PER NIT
2 documents required · 2 mandatory
₹854
₹46,500
17 Oct 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
25 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. | - | - | - | - |
| 1 | E/W Excavation in foundation M.K.R. soil including initial lead and lift as per proper completion of work. | 745.87 | Cum | 119.5 | ₹89,131.47 |
| 2 | Supplying & Laying coarse sand in foundation with all cost of material, labour, T&P etc required for completion of work. | 35.29 | Cum | 1,841.29 | ₹64,979.12 |
| 3 | Laying C.C. 1:3:6 in foundation with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 66.12 | Cum | 4,237.22 | ₹2,80,164.99 |
| 4 | Laying C.C. 1:2:4 in top of stone masonry with all cost of sand, cement & stone ballast T&P etc required for completion of work. | 10.11 | Cum | 5,092.64 | ₹51,486.59 |
| 5 | Laying RCC hume pipe 1000 mm dia pipe including cost of material, labour, T&P etc with all leads & lifts for proper completion of Job. | 27.5 | Cum | 8,386.8 | ₹2,30,637 |
| 6 | R.C.R. Stone masonry 1:4 cm with all cost of labour cement, sand, stone T&P etc required for completion of work. | 302.66 | Cum | 4,823.3 | ₹14,59,819.98 |
| 7 | Cement pointing 1:2 on stone masonry all cost of labour material T&P etc required for completion of work. | 173.39 | Sqm | 124.85 | ₹21,647.74 |
| 8 | Centering & Shuttering for R.C.C. work with all cost of labour material T&P etc required for completion of work. | 91.97 | Sqm | 817 | ₹75,139.49 |
| 9 | Grouted stone pitching in 1:4 cm including all cost of labour material T&P etc required for completion of work. but excluding GST | 41.6 | Sqm | 771.65 | ₹32,100.64 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.61 MB
NIT02.pdf
Tender Documents • 3.60 MB
BOQ_2208918.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .