| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹4.2 L+₹2,809.56 (0.68%)Rejected-AOC COIMBATORE CORPORATION | COIMBATORE | COIMBATORE | TAMIL NADU | ₹4.2 L+₹2,809.56 (0.68%) | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | C BALASUBRAMANIAN L2 | BALAMURUGAN ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00 | Engaging Jack Hammer with tractor for cutting off the surface at a required manner as directed by the dept officers | 13 | Hrs | 600 ₹7,800 | 448 ₹5,824 Lowest |
| 2.00 | Earth work excavation in all kinds of soil with initial level and Refilling life of 5m to 6m in narrow trenches for laying of pipes for sewerage works in hard stiff clay stiff block cotton hard red earth, gravel ,stony earth and earth mixed with small size boulders and hard gravelly soils etc., | 35 | M3 | 300 ₹10,500.9 | 203 ₹7,105.61 Lowest |
| 3.00 | Dismantling the damaged RCC Slab as per the instruction of Departmental officers. Including all initial lead and other labour charges | 8 | M3 | 4,308 ₹34,442.46 Lowest | 4,308 ₹34,442.46 Lowest |
| 4.00 | Dismantling the damaged PCC wall as per the instruction of Departmental officers. Including all initial lead and other labour charges | 9 | M3 | 50 ₹450.2 Lowest | 486 ₹4,375.94 |
| 5.00 | Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr
(upto 4 Feet) | 77.5 | M2 | 285 ₹22,087.5 | 281 ₹21,777.5 Lowest |
| 6.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 12 | M3 | 6,037 ₹72,462.11 Lowest | 6,037 ₹72,462.11 Lowest |
| 7.00 | Plastering in Cement Mortar 1:5 mix 20mm thick including all cost etc completed. | 47 | m2 | 600 ₹28,200 | 586 ₹27,542 Lowest |
| 8.00 | Supply and fabrication of R.T.S. rods in various dia including cutting bending placing in position and tying etc. | 6.5 | qtl | 9,152 ₹59,451.39 Lowest | 9,152 ₹59,451.39 Lowest |
| 9.00 | Supplying and erecting centering for side and soffits including necessary supports and strutting upto 3.29m high for plane surfaces such as side slabs of RCC boxing and similar vertical RCC slabs, FACIA, Drop etc., in all floor with all cross bracing using mild steel sheets of size of 90cm X 60cm and BG 10 stiffened with welded mild steel angles of size 25X25X3mm for boardinglaid over country wood joists of size 10cm x 6.5cm spaced at about 90cm C/C and supported by casurina props of 10cm to 13cm dia spaced at 75cm C/C etc.,
completed as directed. Sl.No.123B Part-II | 36 | M2 | 1,385 ₹49,860 Lowest | 1,385 ₹49,860 Lowest |
| 10.00 | Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm gauge hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 8 | M3 | 9,181 ₹73,402.1 Lowest | 9,181 ₹73,402.1 Lowest |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
19 Aug 2025, 3:00 pmClosed
Assistant Commisssioner,West Zone
West Zone, Coimbatore Corporation
Raising of UGD Chamber at AKS Nagar , Rajammal layout , Rayappa puram ,Gopal layout, Bannariamman kovil street , Ponnaiyaraja puram roads and Ward Areas in ward no 73 of West Zone.
2025_MAWS_589766_28
E3/West Zone/2025
Open Tender
Civil Works
Works
90 days
West Zone, Coimbatore Corporation.
As per the tender condition attached
4 documents required · 4 mandatory
₹0
₹5,000
31 Mar 2026
7 Aug 2025
19 Aug 2025
7 Aug 2025
19 Aug 2025
7 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
CONDITIONS.pdf
Additional Documents • 0.26 MB
SWD.pdf
Tender Documents • 0.67 MB
BOQ_705078.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .